Micro-Generation Connection (MGC) Application For Connection of Micro-Generation Facilities of ≤ 10 kW This form is applicable to individual or multiple generating units at the Customer’s facility with total nameplate rating of 10 kW or less. Your generation facility must generate electricity from a renewable energy source that is wind, water, solar radiation, or agricultural biomass. Inverter-based generating units must not inject DC greater than 0.5% of the full rated output current at the point of connection of the generating units. The generated harmonic levels must not exceed those given in the CAN/CSA-C61000-3-6 Standards. Refer to Distributed Generation Technical Interconnection Requirements - Interconnections at Voltages 50kV and Below (http://www.hydroonenetworks.com/en/customers/generators/generation_connections/distribution/ stakeholder_consultation/default.asp For generation size up to 10 kW, a Connection Impact Assessment will not be required and Entegrus Powerlines will not perform such an assessment. There may be a limitation on the number of micro-generation facilities that can be connected to the same distribution feeder. IMPORTANT: All fields below are mandatory, except where noted. Incomplete applications may be returned by Entegrus Powerlines. Please return the completed form by mail or email to: Entegrus Powerlines Attn: MicroFIT Connections 320 Queen ST. Chatham, Ontario N7M 5K2 Email: [email protected] Telephone: 519-352-6300 x 290 (1-866-804-7325) NOTE: Applicants are cautioned NOT to incur major expenses until Entegrus Powerlines approves to connect the proposed generation facility. The following information is required for all generators with total generation of up to 10 kW. Date of Application (dd / mm / yyyy) Middlesex Power Distribution Corporation Micro-Generation Connection Application Form - Rev.1, Aug 4, 2010 Entegrus Powerlines Micro-Generation Connection Application Form - Rev.2, Feb 17, 2012 Page 1 of 8

MicroGenerationApplicationMP(1).doc

Embed Size (px)

DESCRIPTION

guidence on microgenaretions

Citation preview

Page 1: MicroGenerationApplicationMP(1).doc

Micro-Generation Connection (MGC) ApplicationFor Connection of Micro-Generation Facilities of ≤ 10 kW

This form is applicable to individual or multiple generating units at the Customer’s facility with total nameplate rating of 10 kW or less. Your generation facility must generate electricity from a renewable energy source that is wind, water, solar radiation, or agricultural biomass.

Inverter-based generating units must not inject DC greater than 0.5% of the full rated output current at the point of connection of the generating units. The generated harmonic levels must not exceed those given in the CAN/CSA-C61000-3-6 Standards.

Refer to Distributed Generation Technical Interconnection Requirements - Interconnections at Voltages 50kV and Below (http://www.hydroonenetworks.com/en/customers/generators/generation_connections/distribution/stakeholder_consultation/default.asp

For generation size up to 10 kW, a Connection Impact Assessment will not be required and Entegrus Powerlines will not perform such an assessment. There may be a limitation on the number of micro-generation facilities that can be connected to the same distribution feeder.

IMPORTANT: All fields below are mandatory, except where noted. Incomplete applications may be returned by Entegrus Powerlines.

Please return the completed form by mail or email to:Entegrus Powerlines Attn: MicroFIT Connections320 Queen ST.Chatham, Ontario  N7M 5K2Email: [email protected]: 519-352-6300 x 290 (1-866-804-7325)

NOTE: Applicants are cautioned NOT to incur major expenses until Entegrus Powerlines approves to connect the proposed generation facility.

The following information is required for all generators with total generation of up to 10 kW.

Date of Application        (dd / mm / yyyy)

microFIT reference number*        (*not required for Net Metering applications)

1. Project/Customer Name       

2. Proposed In-Service Date       (dd / mm / yyyy)

3. Project InformationOwner Company/ Person:       

Contact:        Mailing Address:        Telephone:        Fax:        E-mail:       

Middlesex Power Distribution Corporation Micro-Generation Connection Application Form - Rev.1, Aug 4, 2010Entegrus Powerlines Micro-Generation Connection Application Form - Rev.2, Feb 17, 2012

Page 1 of 4

Page 2: MicroGenerationApplicationMP(1).doc

Engineering Consultant (Electrical) (optional) Company/ Person:        Contact:        Mailing Address:        Telephone:        Fax:        E-mail:       

4. Project LocationAddress        City/Town/Township        Lot Number(s)        Concession Number(s)       

5. Connection to Entegrus Powerlines Distribution Systema) Connection voltage to Entegrus Powerlines distribution system:       kVb) Station:       c) Feeder:      

6. Program Typea) microFIT (Complete all sections) b) Net Metering to microFIT Conversion

i. Existing Net Metering Customer upgrading generation size and/or technology/ fuel type, up to 10 kW (Complete all sections)

ii. Existing Net Metering Customer with no upgrades in generation size and/or technology/ fuel type, up to 10 kW (Complete sections 6, 7 and 8 only)

c) Net Metering (Complete all sections)

7. Customer StatusExisting Entegrus Powerlines Customer? Yes NoIf yes, Entegrus Powerlines Account Number:       -       -       Name of Account Holder*:        (*must be the same name as applicant)Are you a GST registrant? Yes NoIf yes, provide your GST registration number:       -       RT      

8. Project SizeNumber of Units       Nameplate Rating of Each Unit       kWGenerator connecting on single phase three phaseExisting Total Nameplate Capacity       kWProposed Total Nameplate Capacity       kW

9. Fuel TypeWind Turbine Hydraulic TurbineSolar / Photovoltaic Cells (Rooftop) Solar / Photovoltaic Cells (Ground Mount)Biomass Bio-dieselBio-gas Other, please specify      

Middlesex Power Distribution Corporation Micro-Generation Connection Application Form - Rev.1, Aug 4, 2010Entegrus Powerlines Micro-Generation Connection Application Form - Rev.2, Feb 17, 2012

Page 2 of 4

Page 3: MicroGenerationApplicationMP(1).doc

10. Customer Owned Step-up Interface Transformer (if applicable)Transformer rating       kVA

High voltage winding connection Delta WyeGrounding method of wye connected high voltage winding neutral

Solid Ungrounded Impedance grounded: R      X      ohms

Low voltage winding connection Delta WyeGrounding method of wye connected low voltage winding neutral

Solid Ungrounded Impedance grounded: R      X      ohms

Note: The term ‘High Voltage’ refers to the connection voltage to Entegrus Powerlines distribution system and ‘Low Voltage’ refers to the generator / inverter output voltage.

11. Generator / Inverter Information(For generation facilities installing more than one type of generator, complete section 10)Manufacturer:        Model No.        Number of phases Single Phase Three PhaseNameplate rating:       kWGenerator / Inverter AC output voltage       VoltsType of inverter: Self-commutated Line- commutated

Other, please specify       Are power factor correction capacitors automatically switched off when generator breaker opens?

Yes NoIs the generator / inverter paralleling equipment and / or design pre-certified and meets anti-islanding test requirements? Yes NoIf answer to the above question is Yes, to which standard(s), e.g. CSA C22.2 No. 107.1-01, UL1741, etc.

      Method of synchronizing the generator / inverter to Entegrus Powerlines system

Manual AutomaticMaximum inrush current upon generator or inverter connection (Iinrush/ Irated)       per unit

12. Grid Interface Controller (if applicable)Manufacturer:      Model Number:      

13. Type of ConnectionSelect the Single Line Diagram below that is appropriate for your connection to the Entegrus Powerlines distribution system:

Figure 1 - Net Metering Connection Figure 2 - Parallel Metering Connection

Middlesex Power Distribution Corporation Micro-Generation Connection Application Form - Rev.1, Aug 4, 2010Entegrus Powerlines Micro-Generation Connection Application Form - Rev.2, Feb 17, 2012

Page 3 of 4

Page 4: MicroGenerationApplicationMP(1).doc

Figure 1: Net Metering Configuration

Figure 2: Parallel Metering Configuration

DisclosureBy submitting a MGC Application, the Proponent authorizes the collection by Entegrus Powerlines, of the information set out in the MGC Application and otherwise collected in accordance with the terms hereof, the terms of Entegrus Powerlines Conditions of Service, Entegrus Powerlines Privacy Policy and the requirements of the Distribution System Code and the use of such information for the purposes of the connection of the generation facility to Entegrus Powerlines distribution system.Middlesex Power Distribution Corporation Micro-Generation Connection Application Form - Rev.1, Aug 4, 2010Entegrus Powerlines Micro-Generation Connection Application Form - Rev.2, Feb 17, 2012

Page 4 of 4