© 2003 Baker Hughes Incorporated All rights reserved. Microhole Wireless Microhole Wireless Steering While Drilling Steering While Drilling System System - - Microhole Integration Meeting Microhole Integration Meeting DOE Sollicitation: DE DOE Sollicitation: DE - - PS26 PS26 - - 04NT15480 04NT15480 - - 2 2 Microhole Drilling, MHT II Microhole Drilling, MHT II Microhole Coiled Tubing Bottom Hole Microhole Coiled Tubing Bottom Hole Assemblies Assemblies John Macpherson John Macpherson Baker Hughes INTEQ Baker Hughes INTEQ

Microhole Wireless Steering While Drilling System

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Microhole Wireless Steering While Drilling Steering While Drilling

SystemSystem--

Microhole Integration MeetingMicrohole Integration Meeting

DOE Sollicitation: DEDOE Sollicitation: DE--PS26PS26--04NT1548004NT15480--22Microhole Drilling, MHT IIMicrohole Drilling, MHT IIMicrohole Coiled Tubing Bottom Hole Microhole Coiled Tubing Bottom Hole AssembliesAssemblies

John MacphersonJohn MacphersonBaker Hughes INTEQBaker Hughes INTEQ

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Steering SystemMicrohole Wireless Steering System

Project ObjectivesProject Objectives–– Develop a Develop a 22--3/83/8”” downhole Bidownhole Bi--Directional Power & Communication Directional Power & Communication

Module (BCPM)Module (BCPM)–– Develop a Develop a Surface Coil Tubing Communication Link (CTCL)Surface Coil Tubing Communication Link (CTCL)–– Manufacture 3 BCPM prototypes Manufacture 3 BCPM prototypes –– Laboratory & Field Testing with a CoilTrakLaboratory & Field Testing with a CoilTrak™™ bottom hole assemblybottom hole assembly

Project DurationProject Duration–– 18 months18 months–– Start Date: 1 April, 2005Start Date: 1 April, 2005–– End Date: 30 September, 2006End Date: 30 September, 2006

© 2003 Baker Hughes IncorporatedAll rights reserved.

MWD Telemetry SystemMWD Telemetry System

Basic Telemetry System ComponentsBasic Telemetry System Components

De-Compression

De-Coding

De-Modulation

ChannelEqualization

NoiseCancellation

Compression En-Coding Modulation XMTR Telemetry Channel

RCVR

BCPMBCPM

Surface System: SARA IISurface System: SARA IIHSTDHSTD

24 bit A/D, Low Noise, Multiple ChannelsNoise CancellationDual Pressure Processing.

© 2003 Baker Hughes IncorporatedAll rights reserved.

BCPM Mud Pulse TelemetryBCPM Mud Pulse TelemetryBCPM: BiBCPM: Bi--directional Communication and Power Moduledirectional Communication and Power Module

Pulser

Location of Pilot Valve

Main Valve

Alternator

Pulser

Mud Screen

Centralizer

Turbine

• Low power consumption• Pilot Valve operation (Bypass)

• Strong Discrete Pressure Signals• Pressure Amplitude > 40bar• Up to 7 bps raw data rate.

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Steering SystemMicrohole Wireless Steering System

RAM - Rib Assisted Motor

HPC - Hydraulic Power Control Sub

DGS - Directional & Gamma Sub

Bi-Comm. & Power Sub

Example 2Example 2--3/83/8”” CoilTrak BHA with BCPMCoilTrak BHA with BCPM

RSM – Rib Steering Motor

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Steering SystemMicrohole Wireless Steering System

CoilTrak System (Mud Pulse)CoilTrak System (Mud Pulse)

Depth Encoder SignalsSurface Sensor Data

DownholeData

Steering Commands

Dow

nhole Tool

Data

EthernetTC

P/IP Connection

SARA II

CTCL

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Steering SystemMicrohole Wireless Steering System

CoilTrak: ECoilTrak: E--line versus Mud Pulseline versus Mud Pulse

More flexibilityCementing limitationsWork string required

OperationsOperations

While drillingData density is drill rate dependant

While drillingHigh inclination possible

LoggingLogging

Limited to alternator (or battery power)Continuous power supplyPowerPower

Limited under-balanced drilling capabilities

No limitationsDrilling FluidDrilling Fluid

Steering While DrillingSteering While DrillingFine orientation increment

Directional ControlDirectional Control

Pressure downlinkClosed loop on wireTwoTwo--Way Comm.Way Comm.

Low data rateHigh data rateData TransmissionData TransmissionMud PulseMud PulseEE--LineLine

© 2003 Baker Hughes IncorporatedAll rights reserved.

Microhole Wireless Steering SystemMicrohole Wireless Steering System

Project DeadlinesProject DeadlinesConcept ApprovedConcept Approved

Q2Q2’’0505 Q3Q3’’0505 Q4Q4’’0505 Q1Q1’’0606 Q2Q2’’0606 Q3Q3’’0606

ConceptConcept

Design of BCPM & Control SystemDesign of BCPM & Control System

Manufacturing DecisionManufacturing Decision

Manufacture, Assemble 3 prototypesManufacture, Assemble 3 prototypes

Lab TestingLab Testing

Field TestingField Testing

Performance Review & Project DocumentationPerformance Review & Project Documentation