5
April 10, 2018 CERTIFIED MAIL 7017 0660 0000 9421 77 54 Jack Schinderle, Division Director Waste Management and Radiological Protection Division Michigan Department of Environmental Quality P.O. Box 30241 Lansing, MI 48909 The Dow Chemical Company Michigan Operations Midland, Ml 48674 APR l2 2 018 cc: Dan Dailey, MDEQ-WMRPD, P.O. Box 30241, Lansing, MI 48909 Trisha Confer, MDEQ-WMRPD, 401 Ketchum St, Suite B, Bay City, MI 48708 THE DOW CHEMICAL COMPANY- MID 000 724 724, WASTE STORAGE AREA I (WSA I) DIKE SOUTHEAST END CONCRETE REPLACEMENT- MINOR MODIFICATION REQUEST In accordance with R 299.9519(5) of the administrative rules promulgated pursuant to Part 111, Hazardous Waste Management, ofNREPA, 1994 PA 451, as amended, Dow Chemical (Dow) is requesting approval of a minor modification to the Operating License to replace the southeastern portion of the WSA I dike to improve the condition of the concrete. The condition of the portion of the WSA I concrete dike southeast of 1143 building is deteriorating and the annual costs for maintaining it are high. Due to the condition, Dow has been spending a significant amount of money every year on repairs to the dike. In 2016, the section surrounding 1143 Building was replaced (Amendment #4). This project will replace the remaining concrete southeast of 1143 Building. The proposed activities associated with this request include: replacing the current 8" slab with a 12" slab, adding a layer of gravel underneath the concrete, adding a layer of insulation in between the gravel and concrete. The dike size will remain the same. Attached are the following supporting documents: 1.) aerial view of WSA I showing the proposed portion of the dike to be replaced; 2.) dike replacement demo plan; 3.) dike replacement slab plan, and 4.) dike replacement slab cross sections and details. If you have any questions regarding this information, please contact Brad Kischnick (989) 638-9602. Scott Bemis Responsible Care Leader Environment, Health and Safety 1790 Building, Washington Street Midland, MI 48674 bak Attachments

Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement

April 10, 2018

CERTIFIED MAIL 7017 0660 0000 9421 77 54

Jack Schinderle, Division Director Waste Management and Radiological Protection Division Michigan Department of Environmental Quality P.O. Box 30241 Lansing, MI 48909

The Dow Chemical Company Michigan Operations

Midland, Ml 48674

APR l2 2018

cc: Dan Dailey, MDEQ-WMRPD, P.O. Box 30241, Lansing, MI 48909 Trisha Confer, MDEQ-WMRPD, 401 Ketchum St, Suite B, Bay City, MI 48708

THE DOW CHEMICAL COMPANY- MID 000 724 724, WASTE STORAGE AREA I (WSA I) DIKE SOUTHEAST END CONCRETE REPLACEMENT- MINOR MODIFICATION REQUEST

In accordance with R 299.9519(5) of the administrative rules promulgated pursuant to Part 111, Hazardous Waste Management, ofNREPA, 1994 PA 451, as amended, Dow Chemical (Dow) is requesting approval of a minor modification to the Operating License to replace the southeastern portion of the WSA I dike to improve the condition of the concrete.

The condition of the portion of the WSA I concrete dike southeast of 1143 building is deteriorating and the annual costs for maintaining it are high. Due to the condition, Dow has been spending a significant amount of money every year on repairs to the dike. In 2016, the section surrounding 1143 Building was replaced (Amendment #4). This project will replace the remaining concrete southeast of 1143 Building.

The proposed activities associated with this request include: replacing the current 8" slab with a 12" slab, adding a layer of gravel underneath the concrete, adding a layer of insulation in between the gravel and concrete. The dike size will remain the same. Attached are the following supporting documents: 1.) aerial view of WSA I showing the proposed portion of the dike to be replaced; 2.) dike replacement demo plan; 3.) dike replacement slab plan, and 4.) dike replacement slab cross sections and details.

If you have any questions regarding this information, please contact Brad Kischnick (989) 638-9602.

st~ Scott Bemis Responsible Care Leader Environment, Health and Safety 1790 Building, Washington Street Midland, MI 48674

bak Attachments

Page 2: Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement
Page 3: Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement

'"

Rt..V. -

(@CATCH BAS!tl

I I I I

I ~ I~ I

~~ : 1:0 I> I~ I"' 1:::' I I

: I : I : I, I I'

~I -------- ----:- ------ -----.

~I

r.o;c. EL. 89'-B' c H.~ .

1143 BLD'G.

i: u,

~I <·>

I SLOPE BACKFILL I I :

LL---~---~~--~~===~---~~~~~~---~---~~--~~--1

I I I I I I I I I I I I I

-~

REVISION "'· """ REV ISION

DEMO PLAN SCALE : \!1 6 " = 1'-0"

DRAWING ISSUE RECORD

""" t'ATERI"'-OR

"' JOB SJ'E C

<p <p "' "' ~ '

'P 9

"' "' ~ r')

~

<I:

z D

~

u w

"' V>

" r')

220'-0'

O:::S!Cif,EO HAR20l8 THE DOW CHEMICAL COMPANY D. MAC DOUGALL

"'~ HAR1018 r1ICHIGAN DIVISION MIDLAND, MICHIGAN 0 . MAC DOUG ALL ENV IRONMENTAL 1143

MIDLAND WWTP LTE An/lOY ED MAR21H8 DIKE REPLACEMENT DEMO PLAN B. DOLEZAL FROJ,DGR. HAR21H8 C. ROMERO Pi!OJECT"U"J!EA lifG. R~P. MAR1BIB 052998 2 PAV ~ A. CONOMOU

PRINTED

Page 4: Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement

10

"'­"""

REVISION

GENERAL NOTES:

I. COtiCRETE: -4000 psa 128 OAYSJ PER DOW SPEC. G2S·300HH.

2. REBAR: ASTH A615 160,mm psal.

3. ALL CONCRETE TO HAVE SYNTHETIC FIBER REINFORCEHEtlT.

4. PROVIDE 12' DEEP 6AA STOUE OR CRUSHED CotiCRETE ICOHPACTEO TO 95% HAX. OEUSITYI UNDER COUCRETE SOG. SLAB SHALL BE POUR£0 USING Tl-£ CHECKERBOARD METHOD.

' CATCH BASIN 5. C.J. = COUSTAUCTION JOINT - SEE SECTION B-8, OWG 82-011-052998.

I I I I

6. ALL TPER COMERS AU() IUTERSECTIOUS SHALL BE FACTORY FABRICATED, FIELD FABRICATED COMPO/II:tHS ARE UOT PERHITTED, SEE DWG 82-013-0529'18.

7. DO tiOT UNDERHit~ EXIST. FOUNOAT(ONS.

SYtHHETIC FIBER REINFORCHIG & --------------------------------------1 BROOI., FltHSH Otl 6' DEEP 6AA OR 12' DEEP SLAB-ON-GRADE ISOGI W/

-4x-t-W6.5xW6.5 WWA TOP & BOTTOM,

t OF lith STREET. 7-A~O~ ~Y~D~D-PLACE._------ _G_--- . -.-----.---------.- -.. ~

EX. POWER POLE TO REHAitl. ;:X. POWER POLE TO REMAIN. ADO 121 •5 x 2'-6' LG Q 45' tlOTCH 2' DP STYROfOAM TYP. (oil) SIDES ~ROUND

~I /1 ~~~ G --.-

0

y11 -T----~--.---. -.------.----+-r \~:' .. IO.C. EL. 89'-0' 0 H.P. __. T.O.C. EL. 89'-0' 0 H.P, • ~ 82-01t-52998 ~

I I

~

I

~ ''' ' ' '

,'

' ~~ ~~~qqa -------:-------;------. fr.i==='('==·--_,•;-\=':==;t· '---- .,. ----- _:_----- -- -'\,---------- _:_---------------;----------- /---.:.-- ·\·----------;--------------- -:-----------

~I ~I ~I

- - - - - - - ~ - - - - - - - ~ - - - - - - -

~ EL TOP:OF ~ GRATE ~7'-q•

- - - - - - - ~ - - - - - - - T - - - ~ - • -

' ' . ·-- -- -;-- - - -- ---------

1143 BLD'G.

------.-------,------

' ' --- -- ---- - - - - - -----' '

' ' \ ~ &"1/ \ ~ &"1: \.f i?jl,' \.~ c:;;j/,'

\, ' : / : \\ : : ,'

--------\\. -E ------------.--- // ------- -•--------_\\-- K----------- . ---,,//--------\ aa-o1~52qqa : / : \ : ~~~~o~~T::::~~~~ : / jo

\ ' TYP. ,' TYP, SEE ORAWltlG ~ \,f~ f:/ \~ \'{>Q, B2-013-52q'l8, :,:

,·,~ - /1 1'.\~ ~~,: 1 \ C, I I 1 \ rJ:/f,': 1 \ 1 1

I \ I - - - - - - -- - - -- -- - -.- -,- - -- - - - - - - - - ,.., - ~ -- - - - -- - -- - -- - - -:- - - - - - - - - - - - -- - - 4 - \- - -- - - - - -- - -,t- -:- - - - - - - - ---- -- - -

B2-011-52q9a

I-------·-------· - ------~~-=--==;:=~ - -----·-------·------1 I ~. • • r. I ~· '- 121·5·2·-··LG

' ' SLOP£ ---' ' K

I ~ : "'-- /: w ' 0 <5' TOP ~ 8TH T.O.C. Sl~B ;;; ~ T.O.C. SLABl\ TYP. (-41 COAtlERS OBI \

~ ~

0 « 0 ~ ~ ~

~ " >:

"' 0 I ~ '1> ' I 0

~ "' I ~ ~

~ f!l o,

\< z 0

~ u 0

' 0

'1> ~

~ z G

fu j

~~~~~EL~·=a=a·~~=· ==~:===~~====~~==~~~==~====~~~==~~~==~==E=L~·=8

·~·-=··~~~~/'~~~~~;-~~~o.=c=,=====B=1=-~======~~~~~~F~:~~~~~~~~~~~~~~~~;~~~·~~·C~~~~~B~2-~0~II-~,S~19~9~8~~-Ho~'~~~'~E~LgT~~~oF~:~========~~S~·~l~P=c~~~ I I., ·-q• ,...~ GRATE 87'-9' ='=======:!::==!o_-+ L ~- - - - - t~.D~. ~R; -~ -t------ -J--f -"c_~O~D ~UR~ j ---------~-----+-'1> ----'-

1 ~~f.~~;~~OES 1 ~ HAtHX.E WITH lj 3' SCH-40 STL. ORAl!~ Ui:E •

I I ; STAti!YIPE ~ t;: K TO BE IUSTALLED BY OTHERS

I ~~

I ~ ~ II 8 82-0tl-1-40633 82-011-521J98 I ffi ~ vo TYP.

I -i C.J. SPACING 161 SPACES 0 36'-4'' 118'-0' I I I I· I I I I I I

- I --_,___ --- ~f_§_EWER TO

--l(l{Tp -----:::::-----.. --

55'-0'

SLAB PLAN SCALE: YJ:6 " - 1'-0"

REVISION DRAWING ISSUE RECORD

110'-0' 55'-0'

220'-0' 0/0 tiEW CC»lC.

22-4'-0' 0/0 CONT. 2' DP STYROFOAM HIGHLOAD \00

O£SJQED KAR1018 IP\.AHTNO. THE DOW CHEMICAL COMPANY CIVIL

OAAW KAR2018 MICHIGAN DIVISION MIDLAND, 1-1ICHIGAN D. MACDOUGALL ENVIRONMENTAL 1143

MIDLAND WWTP LTE AI'PRDV£0 KAR201B DIKE REPLACEMENT PLAN B. DOLEZAL PRDJ.Et«"A KAR201B EAST SIDE

C. RA~IERD PROJECT t.ue~ll

I 1 s2-t02-05299s I "'A~;~nNnMm KAR2018 ~52998 1/IG"ol'-~'

I PRINTED 1" .. 2 PAV

l 6

~ 7

I q

: ~

Page 5: Midland, Ml 48674 - Michigan...Apr 10, 2018  · oaaw kar2018 michigan division midland, 1-1ichigan d. macdougall environmental 1143 midland wwtp lte ai'prdv£0 kar201b dike replacement

10

2W TYP.

TO BACK ECCE OF ANGLE EMBED

L3•2Y.!x~ QLHl PfRII-ETfR fRf\1-\E ------,. WITH Jl• $2f, 6' LG. tiEL SOil STUDS

OR BEUI BARS 16' • 2' HOOK I 0 12' D.C. HOT DIP GALY.

AFTER FABRICATIOIL

ROUGHEtl COtl:RETE ~ APPLY BO>IDIUG

AGEIH BEFORE POORI!IG.

2' OP S TYROFOAH HIGHLOAO 109 !STAGGER JOJtHSI

T/ClJBB = SFE PI AN ~

I\\' CLR

F.F. ' VARIES SEE PLAtl ~

COIH. 619 TPER o C.J.

2'-6' X 2'-6' Stw

SEALANT o PERIMETER

'4 o B'D.C.E.W.

~

SUMP DETAIL

~'ITYPI TO Etn OF BAilOEO GRAlltffi

OR COHPACTEO TO qs% MAX. OEtiSITY.

CI-WtfER W 0 -45'

DOWEL. CHAIR OR STAI«JEE o IB' D.C. t-IAX.

HCl.O WWR, BACK AT JDitH 01;\,Y

, ITRIH ltl FJELOJ M d TO CLR. WATERSTOP

~~~~~~~~

'GK~YE~ 1::: P~TA~~~ ~,~-7~~~~~• J----''-''-0:..' __ ~ UIIDISll.llBEO SUBGRAOE_/ 2'0P SIYROFOAI4j OR COfPACTEO TO qsr. HIGHLOAO JC9

MAX. OEtlSITY. lSI AGGER JOIHTSI

lo!ONOL JTHJC ROLLED CURB

SECTION D-0

UOTE, FOR JtlfORMATIOtl tiD! SHCWH, SEE SECTIOil A-A.

UEW CCX'lCRETE SLAB-C»I ·GRADE SEE PLAil FOR SIZE • REIIIF.

!PER '61~ RIBBED CEtHERBlA..B CONTI!IUOJS

., ., . b •' b •'

SPEED DOWEL SLEEVE !PS0121'6TXliVIQ BASE tPS0/'6BXl

LAYERS Of WWR 0 THE JOJtH

TPER '619 RIBBED CEtHERBU.B WIRED BACK TO REBAR AIID/OR

UEW COIICRETE SLAB·OU-GRAOE SEE PLAU FOR SIZE AI() REJtFORC Jtffi

1 6 X 24'LG. o 12'0.(.

0 12'0,(. WWR 0 12" D.C. !AT EACH GRCWiETI BOTH SlOES

EXISTHIG

FILLET Of POL YSULFJOE

. v'., .. . p· ••

·•

.p'., ..

!lEW

tiOTE• (()KRETE SlAB-()l-GRAOE MUST BE POURED USJtffi THE CHECKERBOARD f£THOO, COtiCRETE SURFACES MUST BE FLUSH ACROSS THE JOJtH TO PREYEtH DAMAGE TO THE JOJtH FROH StiOWPLOWS.

SLAB CONSTRUCT I ON JO !NT

SECTION 8-8

UOTE: FOR lt-:FOOHATJOU tlOT SHJWtl, SEE SECT lOll A-A.

\'.' WO REFLEX EXPAilSJOtl BOARD BETW. tlEW COUC. ~ EX. TYP. FULL HEIGHT •

00 tKJT lliDERHittE EXISTJtlG SLAB

t.IONOL JTH I C ROLL ED CURB ADJACENT TO EXISTING CURB

SECTION E-E B2-I02-52qqs tiDIE• FOR UtFORHATJOtl tKJT SHOWN, SEE SECTJOilS A-A ~ D-0.

0 I

0

6" DIA. SCH . 40 BUTT WELDED PEPE CAP

0 I

-u,

0 I

-;,. "'

2" CLEAR SIDES

6" DIA. SCH. 40 A53 TYPE E OR S GRADE B PIPE . PRIME .1. FINISH PAINT PER G16S-0201-01 "SAFETY YELLOW"

SEAL JOINT W/ CONT. BEAD OF POL YSULF I DE SEALANT TOOLED INTO JOINT

LG THRU-BARS @ 18" o. c.

NOTE: BOLLARD .1. FOUNOAT ION MUST BE POURED MONOLITHICALLY WI NEW SLAB-ON-GRADE.

3" CLEAR @ BTM

GUARD POST DETAIL

@ B2-JOZ-52qqa

HEW

r

(

INTERUPT ..___ @ SUMP

---------- -----

SECTION K-K B2-102-s2qqB !KITE: FOR IUFORHAT!Otl !KIT SHOWU, SEE SECTIOil A-A ~ F -F.

EXISTIUG

\\' WO REFLEX EXPAUSIOU BOARD BETWJlEW SLAB ~ ASPHAL I

MONOLITHIC SLOPED CURB

SECTION F-F 82-102-52996 tKITE• FOR ltlfORHATJ()j tlOT SHOWU, SEE SECTJOilS A-A ~ 0-0.

SLAB ADJACENT TO ASPHALT PAVING

SECTION G-G 82-102-52998 tiD![, FOR JtlfORHATI()l tlOT SHOWU, SEE SECTIOtiS A-A ~ 0-0.

DOW CHEMICAL

SLOPED CURB