Minimize the Time by Optimizing

  • Upload
    balaji

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

  • 7/24/2019 Minimize the Time by Optimizing

    1/37

    Minimize the Timeconsumption

    in Piping IsometricProduction By

    Optimizing the FlowProcess

  • 7/24/2019 Minimize the Time by Optimizing

    2/37

    Defnition- PipingIsometric Piping isometric is the Engineering

    drawing which used to purchase theele!ant material and Fa"ricate the

    pipe and fttings "ased uponPiping #ayout

    It indicates Material code$ %eld$&upport mar's and From-To

    (ontinuation)

    It use to *a"ricate and Erect the Pipe inthe site)

  • 7/24/2019 Minimize the Time by Optimizing

    3/37

    (O+&T,I+T

    Piping Isometric production is the Maor. /ast Process in Piping Design

    ,*ter fnished the 012 design re!iew

    and (ompleted the Maor design wor'$Isometric ha!e to "e start)

    POB#EM

    Timeconsuming to Issue theIsometrics as a Deli!era"le

  • 7/24/2019 Minimize the Time by Optimizing

    4/37

    O"ecti!es

    Minimize the time (onsumption inIsometric Production

    Impro!e the Isometric Flow Process

  • 7/24/2019 Minimize the Time by Optimizing

    5/37

    3uality Tools 4sed

    Process Flow chart has "een used to Front outthe isometric Flow Process (urrent ,s well asProposal

    Cause & Efect Analysis has "een used to Pointout the !arious Department . Indi!idual (auses)

    Bar Charthas "een used to 5rill out the

    Isometric Flow Process among the Proposal)

  • 7/24/2019 Minimize the Time by Optimizing

    6/37

    Input Details *or (urrent process

    For Designers & Checker

    (alculation %ith &upport

    Process . Instrumentation Diagram

    E6uipment /endor Drawing

    Design &pecifcation

    For Instrumentation Dept.

    Instrument /endor Drawing

    For T! Dept.

    Piping &pecifcation

    Branch Ta"le

  • 7/24/2019 Minimize the Time by Optimizing

    7/37

    (4E+T %O7 F#O% PO(E&& FO I&OMETI( PO)

    TIME

    D4,TIO+89&:

    DE&I5+E (9E(7 PI+T ;

    (9E(7E

  • 7/24/2019 Minimize the Time by Optimizing

    8/37

    (4E+T PO(E&& I+TI,# (9E(7 . &TE&&M,74P

  • 7/24/2019 Minimize the Time by Optimizing

    9/37

    (4E+T PO(E&& B,(7 (9E(7ED B= (9E(7E

  • 7/24/2019 Minimize the Time by Optimizing

    10/37

    (4E+T PO(E&& I+&T4ME+T,TIO+ (9E(7

  • 7/24/2019 Minimize the Time by Optimizing

    11/37

    (4E+T PO(E&& MTO (9E(7

  • 7/24/2019 Minimize the Time by Optimizing

    12/37

    (4E+T PO(E&& FI+,# EO IF ,+=

  • 7/24/2019 Minimize the Time by Optimizing

    13/37

    (4E+T PO(E&& Issued Isometric

  • 7/24/2019 Minimize the Time by Optimizing

    14/37

    Brain &torming

    , Brainstorming session was held with#ead$ ,rea #ead$ Engineers . Designersin order to minimize the time

    consumption in Isometric Production .optimizing the Process Cow)

    Opinions . &uggestions were resulted*rom the "elow ta"le 8Brainstorming

    session:$ out o* which$ 9igh andModerate causes ha!e "een ta'en"ased on past Proect Eperience *or(ause and Eect Diagram)

  • 7/24/2019 Minimize the Time by Optimizing

    15/37

    Brain &torming - Ta"le

  • 7/24/2019 Minimize the Time by Optimizing

    16/37

    (ause . Eect ,nalysis

    More time(onsumptionin IsometricProduction

  • 7/24/2019 Minimize the Time by Optimizing

    17/37

    &ur!ey - sample

  • 7/24/2019 Minimize the Time by Optimizing

    18/37

    &ur!ey - sample

  • 7/24/2019 Minimize the Time by Optimizing

    19/37

    Proposal %or' Flow

    Based on Paper sur!ey ta'en o!er A1 employeesand 9igh le!els$ *ollowing Percentage ha!e "eenarri!ed to main causes$ appropriate percentage asseriatim "elow$

    Designer . Engineer >02 &tress - @12

    Isometric Cow process A2

    Management decision - 02

    Isometric Cow process is a maor impact onisometric production) &o$ we are ta'ing isometricCow process to *urther analysis with dierentProposals)

  • 7/24/2019 Minimize the Time by Optimizing

    20/37

    POPO&,# %O7 F#O% PO(E&& Option->

    TIMED4,TIO+

    89&:

    DE&I5+E (9E(7 PI+T ;

    (9E(7E

  • 7/24/2019 Minimize the Time by Optimizing

    21/37

    POPO&,# %O7 F#O% PO(E&& Option-@

    TIMED4,TIO+

    89&:

    DE&I5+E (9E(7 PI+T ;

    (9E(7E

    B,(7 MODE##I+5 B=DE&I5+E

    @

  • 7/24/2019 Minimize the Time by Optimizing

    22/37

    POPO&,# %O7 F#O% PO(E& Option-;

    TIMED4,TIO+

    89&:

    DE&I5+E (9E(7 PI+T ;

    (9E(7E

  • 7/24/2019 Minimize the Time by Optimizing

    23/37

    (omparison thro Bar(hart

    1

    A

    >1

    >A

    @1

    @A

    .

    TIME D4,TIO+)

  • 7/24/2019 Minimize the Time by Optimizing

    24/37

    &elect ion o* process *or pilotrun %ith the 9elp o* Bar chart$ Option -; has "een

    &elected)

    Option-; ha!ing #ess Time (onsumption andThere is no missing o* any acti!ity to per*orm to

    issue Isometrics andomly Two Isometrics are selected to Per*orm

    the Pilot run

    Input and Pilot run as &eriatim Below

  • 7/24/2019 Minimize the Time by Optimizing

    25/37

    Input Details *or Proposed process

    For Designer" Checker & Area Engineer

    (alculation %ith &upport

    Process . Instrumentation Diagram 8P.id:E6uipment /endor Drawing

    Design &pecifcation

    Instrument /endor Drawing

    Piping &pecifcation

  • 7/24/2019 Minimize the Time by Optimizing

    26/37

    &ample I Designer . (hec'er

    &ample I Bac' (hec' "

  • 7/24/2019 Minimize the Time by Optimizing

    27/37

    &ample I Bac' (hec' "y(hec'er

  • 7/24/2019 Minimize the Time by Optimizing

    28/37

    &ample I (hec'ed ,rea Engineer

  • 7/24/2019 Minimize the Time by Optimizing

    29/37

    &ample II Designer . (hec'er

    &ample II Bac' (hec' "y

  • 7/24/2019 Minimize the Time by Optimizing

    30/37

    &ample II Bac' (hec' "y(hec'er

    &ample II (hec'ed ,rea

  • 7/24/2019 Minimize the Time by Optimizing

    31/37

    &ample II (hec'ed ,reaEngineer

  • 7/24/2019 Minimize the Time by Optimizing

    32/37

    Outcome o* pilot run

    Based on Proposed Flow process$ Isometrics wereundergone to Dierent (hec'ing and 4pdatingProcess)

    ,s newly added in the Proposed process ,reaEngineer has (hec'ed the Final Isometrics "e*ore

    issuing with 9igh esponsi"ility) Outcome o* the Proposed one is each the

    Epected one without aecting the BaseIngredients)

    By this Time 4tilize to issue the Isometric iseduced to

    ; hrs when compare with (urrent Process)

  • 7/24/2019 Minimize the Time by Optimizing

    33/37

    Time eduction (alculation

    For &ingle Isometric ; hrs &a!ed)

    For efnery Proect$ Isometric (ountapproimately

    HA1 will "e there)

    Total time eduction HA1 ; hrs

    @@A1 hrs

    This #eads to (ost eduction o* Proect

    ( t d ti l l ti

  • 7/24/2019 Minimize the Time by Optimizing

    34/37

    (ost reduction calculation For single isometric GGA1-?A1

    s) >A11

    For efnery Proect$ Isometric (ount approimatelyHA1 will "e there)

    Total cost eduction HA1 >A11

    s) >>$@A$111

  • 7/24/2019 Minimize the Time by Optimizing

    35/37

    Implementation

    Proposed Cow Process has "een Passed toManagement le!el thro #ead Engineer

    Eplained a"out the +ew Cow Process and Timeeduction)

    Be*ore starting the isometric issue process o!erall meeting to "e conducted a"out descri"e the+ew Cow process "y #ead engineer)

    Do

  • 7/24/2019 Minimize the Time by Optimizing

    36/37

    ,dditional &uggestion *orImpro!ement

    P.id hard copies can "e used *or (hec'ing .Mar'ing Instead o* &o*t copies)

    P.id changes can "e 4pdated in 9ard (opy)

    /endor Drawing to "e e*erred *rom Document

    &tore where #atest is a!aila"le) (hec'er has to (hec' the &upport Thoroughly in

    Bac' chec'ing stage)

    &el* (hec'ing "y Designer is e6uired)

    &el* esponsi"ility on Each &houlders)

  • 7/24/2019 Minimize the Time by Optimizing

    37/37

    (onclusion

    Isometric Flow is Impro!ed with out any TechnicalIngredients #oss)

    By Flow process impro!isation Time eduction

    Ta'es place while issuing the Isometrics)This #eads to sa!e Man hours

    4ltimately it educes the Proect (ost)