8
PT. PUMA JAYA UTAMA Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected] PT. PUMA JAYA UTAMA Total Solution for Drill Rig HEAD OFFICE Jl. Ebony Raya D 1 / 11 Sumasang, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone: (62-475) 322009 +62 8124161239 Fax: (62-475) 322009 E-mail: [email protected] [email protected] Secondary Email: [email protected] [email protected] [email protected] COMPANY PROFILE PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

  • Upload
    votram

  • View
    225

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

`

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

HEAD OFFICE

Jl. Ebony Raya D 1 / 11 Sumasang, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone:

(62-475) 322009 +62 8124161239 Fax:

(62-475) 322009

E-mail:

[email protected] [email protected] Secondary Email: [email protected] [email protected] [email protected]

COMPANY PROFILE

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Page 2: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

`

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

PT. PUMA JAYA UTAMA was formed in August 2008, which previously named CV. JAYA UTAMA performed in March 2003. PJU which was established to address drilling services, supply, and maintenance in Mines and Exploration. By the current of management representing are : Director : I Dewa Putu Mandra General Manager : Gede Sandhy I Operational Manager : Fickry Amier Baso Since established in 2008, management and all employees remain committed to providing the best service of total solutions in the sustainable drilling for customer satisfaction, so we can provide the best possible service to our clients. PJU was performed, with the aim to answer the needs of businesses in the drilling sector, particularly in the drilling and maintenance services and supply. The company is expected to grow and evolve as the company's operations and maintenance services of leading, and able to carry out drilling activities with international standards. We focus on continual improvement in safety, equipment, a variety of drilling services, training, customer service, for quality achievement and develop relationships on the ground with customers, through innovation, solid hard work, sheer determination and empowerment of our local employees, that resolve is a key element of our corporate culture. We will be united by our commitment to our core values of PJU stands for : Financial Discipline: Our decisions will be made to ensure long-term growth for the benefit of employees and customers. Integrity and Honesty: Our actions will be conducted following the highest standard of ethics, honesty and personal integrity. This will foster and maintain trust and confidence of our employees, customers and suppliers. Respect for Employees, Customers and Suppliers: Our employees will be developed and motivated to meet the challenges ahead. Individuality and diversity will be valued and performance recognized. We will provide our customers with unsurpassed value-added service. Our relationship with suppliers will reflect respect, understanding and sound business practice. Safety: Personal safety and employee health is our greatest responsibility, followed by the protection of our environment and company property. Technical Leadership: Our competitive advantage is based on continually improving our processes and finding innovative solutions to the technical challenges in meeting the needs of our customers. Risk management be applied in every business process will be undertaken PJU to predict, identify, and prevent potential risks that could hinder the achievement of targets that have been set.

Profile and History

1

Page 3: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Chart of Organization

Board of Directors

General Manager

Administration Manager

Finance

Accounting and Tax

Legal

Operational and HR Manager

Drilling Supervisor

Safety

Logistic

Work Shop

Technical and Database

Site Data Tech

2

Page 4: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Work within the scope of the mining / drilling, PJU realize the critical importance of health and safety for all workers, for these purpose our company created an integrated system in compliance with occupational safety and health with indonesian legislation and international code requirement. By considering the factors of health and safety of workers, we realize that they will be able to make a major contribution to all activities and companies. Safety is the most critical quality we provide to our customers. It is woven throughout every decision made at every job site. Safety is always at the forefront of all of our efforts. We have high expectations for our suppliers with the safety of our equipment. It is important for us to spend the time, resources and energy required to make sure that crews go home safely at the end of their shift.

Common goal: to create workers who have a full awareness of the meaning of health and safety, which contributes to self, family, companies, and countries, by providing maximum productivity capabilities and efficient in work.

Specific objectives: creating a workplace environment that provides security, comfort and safety for workers and guests in performing duties, with reference to the Zero accident.

PJU program of industrial safety, health and environment protection has :

- Conducted induction program to all employee and guest who has involved in drilling activity - Conducted regular meetings to remind each other and grow a great partnership for all employees in all divisions

with health and safety topics. - Conducted safety briefing or toolbox meeting before begin their activity to remind the things that can causes losses

in terms of health and safety to all employees. - Training to improve as necessary the Company HSE policy. - Assessment risk in all of our projects activities. - Reporting and audit to inform periodically all the parties concerned on HSE activities. - Emergency response to follow the priority of planned and implemented actions and measures related to

prevention of impact.

Safety is everyone’s responsibility! No job is so important not is any task so difficult that it cannot or should not be performed safely!

HSE Commitment

3

Page 5: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Our Services Include : 1. Exploration and Development Core Drilling

Nickel

Coal

Mineral 2. Geotech Drilling

Piezometer Drilling

Monitoring Well

Down Hole Surveys

Enviromental Drilling

SPT and UDS Sampling 3. Water Well

4. Blast Hole 5. Large Diameter Drilling (LDD) 6. Manpower Supply for Mining and Exploration 7. Manpower Supply for Sample Preparation:

Data Processing

Core Preparation

Pulp Preparation

Sample Analyzing 8. Exploration Equipment Supply and Maintenance

Services 9. Sales services for Drilling Equipment

Rig Equipment

Rig Unit Drill Rods Core Diameter (mm) Hole Size (mm)

PQ 85

122.6

HQ 63.5 96

NQ 47.6 75.7

PUMA 3000

PUMA 2500

PUMA 2300

PUMA 2200

12 Unit

13 Unit

11 Unit

4 Unit

50 Meter

20 Meter

15 Meter

12 Meter

150 Meter

100 Meter

80 Meter

60 Meter

350 Meter

200 Meter

150 Meter

100 Meter

Depth are depend on lithology and other condition

Service, Equipment and Facilities

4

Page 6: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Workshop and Facilities PJU facilitate a full support for our project site operation with quality technology, along with complete mechanical, hydraulic and electrical assembly services and guarantee spare part availability to drilling operation on site. Support Facilities 1. Office and Workshop in Sorowako 2. Light Vehicles:

4x4 Toyota Land cruisher

4x4 Mitsubishi L200 Strada

4x4 Toyota Hi-Lux 3. Toyota Dyna Truck 4. Dozer D3 Komatsu 5. Dozer D6 Caterpillar 6. All the car equipped with safety bar and safety belt. 7. Human Resources: skilled supervisor, mechanic, driller and crew.

5

Service, Equipment and Facilities

Page 7: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Clients and Projects

NO. CLIENT TYPE OF WORK UNIT PROVIDE LOCATION PERIOD OF

COMPLETION

1 PT. INCO Diamond Core Drilling PUMA 2300 (5 Unit) Sorowako, South

Sulawesi 2004

2 PT. INCO Diamond Core Drilling PUMA 2300 (7 Unit) Sorowako, South

Sulawesi 2005

3 PT. INCO Jacro Drilling Service

and Maintenance PUMA 2500 (13 Unit)

Sorowako, South Sulawesi

2006 to 2008

4 PT. INCO Drilling Service for

Inclinometer Installation PUMA 2300 (1 Unit)

Sorowako, South Sulawesi

2007

5

PT. CITRA LAMPIA MANDIRI JV PT.

ASIA PASIFIC MINING

Diamond Core Drilling PUMA 2300 (2 Unit) Lampia , South

Sulawesi 2007

6 PT. INCO Core Drilling for

Malindaue Limestone HPAL-FEL

PUMA 2500 (4 Unit) Malindaue, South

Sulawesi 2008

7 PT. INCO Drill Rig Supply,

Maintenance and Support

PUMA 2300 (6 Unit)

Soroako, Mahalona, Towuti

and South East Sulawesi

2009

8 PT. INCO Latouw Core Drilling

Services PUMA 2300 (3 Unit)

Latouw, South East Sulawesi

2009

9 PT. INCO Maintenance and

Support of EMD Jacro Drill Rig

PUMA 2300 (6 Unit)

Soroako Project Area, Soroako

Outer Area and Sulawesi Coastal

Deposit

2009

10 PT. INCO Lasusua Limestone Core

Drilling PUMA 2300 (5 Unit)

Ranteangin, South East Sulawesi

2009

11 PT. INCO Sample Preparation,

Services and Manpower Supply

- Soroako, South

Sulawesi March 2010 to

April 2012

12 PT. INCO Rig Exploration Support PUMA 2300 (6 Unit) Soroako, South

Sulawesi March 2009 to February 2010

13 PT. BINTANG

DELAPAN MINERAL Drilling Nickel

Exploration PUMA 2300 (8 Unit)

Bahodopi, Central Sulawesi

February 2011 to Present

14 PT. GENBA MULTI

MINERAL Core Drilling Exploration

for Nickel PUMA 2300 (10 Unit)

Genba – Mahoni , Central Sulawesi

March 2011 to Present

15 PT. SUMBER

PERMATA SELARAS Lambolo Core Drilling

Project 2011 PUMA 2300 (10 Unit)

Kolonedale , Central Sulawesi

February 2011 - Present

16 PT. INCO Infilll Drilling SPA 2011 PUMA 2300 (8 Unit) Soroako, South

Sulawesi October 2011 to March 2012

17 PT. INCO 2nd Phase Latao

Directional Core Drilling PUMA 2300 (3 Unit)

Latouw, South East Sulawesi

October 2011 to February

2012

6

Page 8: Mining Exploration and Development Drilling Services …pjudrilling.com/attachments/article/73/PT. Puma Jaya Utama Company... · PUMA JAYA UTAMA was formed in August 2008, ... Site

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

PT. PUMA JAYA UTAMA Mining Exploration and Development Drilling Services

Total Solution for Drill Rig

Clients and Projects

NO. CLIENT TYPE OF WORK UNIT PROVIDE LOCATION PERIOD OF

COMPLETION

18 PT. MASMINDO

DWI AREA (AWAK MAS)

Re Drill Program Awak Mas Project

PUMA 3000 (1 Unit) Ranteballa, South

Sulawesi February 2012

to Present

19 PT. VALE

INDONESIA

Sample Preparation, Services and Manpower

Supply -

Soroako, South Sulawesi

April 2012 to present

20 PT. CERINDO Drilling Nickel

Exploration PUMA 2500 (6 Unit)

Wolo/Pao-pao, South East Sulawesi

Mei 2012 to Present

21 PT. VALE

INDONESIA Drilling Petea East 2012

PUMA 2500 (12 Unit), Dozer D6 (2 Unit), Dozer

D3 (1 Unit)

Lampesue, South Sulawesi

Start in June 2012

7