© 2016 Electric Power Research Institute, Inc. All rights reserved. Jeremie Varnam Finetech, Inc. BWRVIP Mitigation Committee Meeting San Antonio, TX June 15-16, 2016 Mitigation Performance Update Task 3.1

Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

© 2016 Electric Power Research Institute, Inc. All rights reserved.

Jeremie Varnam

Finetech, Inc.

BWRVIP Mitigation Committee Meeting

San Antonio, TX – June 15-16, 2016

Mitigation

Performance UpdateTask 3.1

Page 2: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

2© 2016 Electric Power Research Institute, Inc. All rights reserved.

Contents

Revised Mitigation Performance Indicator (MPI)

Implementation

MPI Update

– Status of MPI data

– MPI Results

– HWC Availability Results

– Inspection Relief Criteria

Page 3: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

3© 2016 Electric Power Research Institute, Inc. All rights reserved.

Implementation of New MPI

Cycles that ended in 2014 and some cycles that ended in

early 2015 used the old MPI.

Other plants/cycles are handled on a case by case basis.

Options:

Back fit data to revised MPI

Use both current/revised MPI

– No plants in the database file are using a combined

MPI format

Templates using the revised MPI were provided for cycles

that started in late 2014 and beyond.

–37 of 44 plants have been transitioned in the CMA

database; expect full transition after overdue data are

received

Page 4: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

4© 2016 Electric Power Research Institute, Inc. All rights reserved.

Individual PIs by Chemistry Regime

HWC-M NMCA + HWC OLNC + HWC

HWC Availability HWC Availability HWC Availability

ECP ECP ECP

Availability of 2

Secondary Parameters

Availability of 2

Secondary Parameters

Availability of 2

Secondary Parameters

Catalyst Loading OLNC Catalyst Injected

MMS Availability MMS Availability

OLNC Application

Frequency

Page 5: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

5© 2016 Electric Power Research Institute, Inc. All rights reserved.

June 2016 MPI Update

Page 6: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

6© 2016 Electric Power Research Institute, Inc. All rights reserved.

Status of Plant Data Submittal

U.S. BWRs Non-U.S. BWRs

# complete 4Q15 32 of 34 8 of 10

% complete 4Q15 94 80

# complete 1Q16 32 of 34 3 of 10

% complete 1Q16 94 30

• 24 U.S. BWRs send data monthly or quarterly.

• One has not provided data since October 2014.

• One has not provided data since October 2015.

• Two Non-U.S. units have not provided data since March 2015

and five since October 2015

• Issues identified and corrected regarding to emails being

sequestered. Expect close during next update

Page 7: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

7© 2016 Electric Power Research Institute, Inc. All rights reserved.

MPI for Last Complete Cycle – 34 U.S. BWRs

OLNC: One plant was Yellow due

to low HWC availability.

HWC-M: Two plants were yellow

due to low HWC availability.

HWC-M NMCA OLNC

Green 1 2 27

White 0 0 1

Yellow 2 0 1

% Green or

White33 100 97

0

5

10

15

20

25

30

35

HWC NMCA OLNC

Nu

mb

er

of B

WR

s

Page 8: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

8© 2016 Electric Power Research Institute, Inc. All rights reserved.

MPI for Last Complete Cycle – 10 Non-U.S. BWRs

HWC-M:

– Three plants are Yellow or Red

due to low HWC availability.

One plant had a short cycle (10

months).

Two plants had low availability

due to system trips.

NMCA: No Non-U.S. BWRs are

currently utilizing this regime.

0

1

2

3

4

5

6

HWC NMCA OLNC

Nu

mb

er

of B

WR

s

Page 9: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

9© 2016 Electric Power Research Institute, Inc. All rights reserved.

MPI for Last Complete Cycle – 44 BWRs

0

5

10

15

20

25

30

35

HWC NMCA OLNC

Nu

mb

er

of B

WR

s

OLNC: 97% Green

NMCA: 100% Green or White

HWC-M: 44% Green or White

Page 10: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

10© 2016 Electric Power Research Institute, Inc. All rights reserved.

HWC Availability for Last Complete Cycle

34 U.S. BWRs 10 Non-U.S. BWRs

0

5

10

15

20

25

30

35

HWC NMCA OLNC

Nu

mb

er

of B

WR

s

91% Green or White

0

1

2

3

4

5

6

HWC NMCA OLNC

Num

ber

of B

WR

s

70% Green or White

Green = 98% for NMCA; 95% for HWC-M and OLNC.

Page 11: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

11© 2016 Electric Power Research Institute, Inc. All rights reserved.

HWC Availability for Last Complete Cycle – 44 BWRs

Green = 98% for NMCA; 95% for HWC-M and OLNC.

0

5

10

15

20

25

30

35

HWC NMCA OLNC

Nu

mb

er

of

BW

Rs

OLNC: 97% Green or White

NMCA: 100% Green or White

HWC-M: 38% Green or White

Page 12: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

12© 2016 Electric Power Research Institute, Inc. All rights reserved.

HWC Availability for Last Complete Cycle – 44 BWRs

75

80

85

90

95

100R

IN1

SU

S2

SU

S1

CH

I1K

UO

1C

HI2

GG

NS

KU

O2

DU

AC

OF

FIT

NM

P2

BR

U2

PIL

EN

F2

CL

IB

RU

1H

CN

SK

KL

DR

E2

LA

G2

LA

S2

LA

G1

BR

F1

OY

CK

KM

CG

SH

AT

2B

RF

3C

NS

HA

T1

MO

NS

MG

DR

E3

LIM

1P

ER

BR

F2

LIM

2R

IBP

B2

PB

3L

AS

1N

MP

1Q

UA

1Q

UA

2

Cyc

le A

vg

. H

WC

Ava

il.

(%)

Rank (Low to High)

HWC NMCA OLNC

Non-U.S. Goal (HWC, OLNC) Goal (NMCA)

Page 13: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

13© 2016 Electric Power Research Institute, Inc. All rights reserved.

U.S. BWR HWC Availability Trends (All Regimes)

Average has been >90% since 2000 and >95% since 2004.

75

80

85

90

95

100

2000(12)

2001(12)

2002(14)

2003(15)

2004(12)

2005(16)

2006(17)

2007(20)

2008(18)

2009(20)

2010(18)

2011(18)

2012(18)

2013(17)

2014(8)

H2

Ava

ila

bil

ity (

%)

Year of Cycle Start (# of BWRs)

All BWRs

Range Average

Page 14: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

14© 2016 Electric Power Research Institute, Inc. All rights reserved.

U.S. BWR HWC Availability Trends (HWC-M)

75

80

85

90

95

100

2000(3)

2001(6)

2002(3)

2003(7)

2004(3)

2005(4)

2006(4)

2007(5)

2008(4)

2009(5)

2010(2)

2011(3)

2012(2)

2013(2)

2014(1)

H2

Ava

ila

bil

ity (

%)

Year of Cycle Start (# of BWRs)

Range Average

Page 15: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

15© 2016 Electric Power Research Institute, Inc. All rights reserved.

U.S. BWR HWC Availability Trends (NMCA)

90

92

94

96

98

100

2000 (9) 2001 (6) 2002 (11) 2003 (8) 2004 (9) 2005 (12)2006 (13)2007 (12)2008 (13) 2009 (9) 2010 (7) 2011 (5) 2012 (1) 2013 (2)

H2 A

vailab

ilit

y (

%)

Year of Cycle Start (# of BWRs)

Range Average

Page 16: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

16© 2016 Electric Power Research Institute, Inc. All rights reserved.

U.S. BWR HWC Availability Trends (OLNC)

90

92

94

96

98

100

2007 (3) 2008 (1) 2009 (6) 2010 (9) 2011 (10) 2012 (15) 2013 (13) 2014 (7)

H2

Ava

ila

bil

ity (

%)

Year of Cycle Start (# of BWRs)

Range Average

Page 17: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

17© 2016 Electric Power Research Institute, Inc. All rights reserved.

Hydrogen Injection Start by Power Percentage (44 BWRs)

≤10%, 29, 66%

11 - 25%, 4, 9%

26 - 50%, 6, 14%

51 - 75%, 1, 2%

>75%, 4, 9%

66% of BWRs inject H2 at ≤ 10% power.

Page 18: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

18© 2016 Electric Power Research Institute, Inc. All rights reserved.

Cycle HWC Availability vs. Power when HWC I/S

(Data from Last Complete Cycle)

91

92

93

94

95

96

97

98

99

100

0 10 20 30 40 50 60 70 80

Cyc

le A

ve

rag

e H

WC

Ava

ila

bil

ity (

%)

Power at which HWC placed in Service (%)

Page 19: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

19© 2016 Electric Power Research Institute, Inc. All rights reserved.

Performance Summary

% of BWRs with Green or White PI

Last Complete Cycle Current Cycle to Date

Overall HWC Avail. Overall HWC Avail.

HWC 38 38 100 100

NMCA 100 100 100 100

OLNC 97 97 100 100

% of U.S. BWRs with Green or White PI

Last Complete Cycle Current Cycle to Date

Overall HWC Avail. Overall HWC Avail.

HWC 33 33 100 100

NMCA 100 100 100 100

OLNC 97 97 100 100

Page 20: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

20© 2016 Electric Power Research Institute, Inc. All rights reserved.

Inspection Relief Criteria – Last Complete Cycle

% of U.S. BWRs with

HWC Availability

meeting Inspection

Relief Criterion

% of All* BWRs with

HWC Availability

meeting Inspection

Relief Criterion

HWC 100 89

NMCA 100 100

OLNC 100 100

Overall 100 98

HWC Availability Required for Inspection Relief

HWC: 80%

NMCA: 90%

OLNC: 90% (BWRVIP-62 Revision 1)

*For information only.

Page 21: Mitigation Performance Update Task 3€¦ · 03-06-2016  · Monticello benchmark planned for September 2016 Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after

21© 2016 Electric Power Research Institute, Inc. All rights reserved.

Observations related to MPI

Challenges to HWC availability included:

– Hydrogen supply availability in northeast U.S. in 2014

– Multiple trips due to flow control valve failure

– Mid-cycle outages

– Short cycle lengths

ECP Electrodes

– 38 of 45 plants have provided a status of working electrodes

Primarily located in MMS Skid

Hydrogen water chemistry benchmark tests

– 37 of 44 plants provided a status of their last benchmark test

Perry and Peach Bottom 2 recently performed benchmarks

Monticello benchmark planned for September 2016

Valid benchmark kept monthly MPI status “Green” at Susquehanna 1 after ECP probes failed

Most benchmarks have been performed within the last 5 years