MitsubishiRA90 4 axis Wire EDM
Machine Tool TechnologyLake Area Technical Institute
Some pictures copied from Mitsubishi
8/13/2019 Mitsubishi EDM Introduction
2/55
OutlineRA90 Overview - Slide 3 Control Buttons and Lights Jogging the machine Rethreading the wire - Slide 37 Mounting Workpieces Pickups
Nozzles Flow of Machining Operations Power Settings Mitsubishi-Epacks
8/13/2019 Mitsubishi EDM Introduction
3/55
8/13/2019 Mitsubishi EDM Introduction
4/55
8/13/2019 Mitsubishi EDM Introduction
5/55
Control Panel
8/13/2019 Mitsubishi EDM Introduction
6/55
8/13/2019 Mitsubishi EDM Introduction
7/55
8/13/2019 Mitsubishi EDM Introduction
8/55
8/13/2019 Mitsubishi EDM Introduction
9/55
8/13/2019 Mitsubishi EDM Introduction
10/55
The 4 different axesX is the left to right
Y is front to backU is to X and moves on top left to rightV is to Y and moves on top front to back
What we program will be 2 axis programs.-We will use the taper function, which utilizes all4 axes, but 4-axis programming is VERY difficult.
8/13/2019 Mitsubishi EDM Introduction
11/55
Control Buttons and Lights Pg 1
8/13/2019 Mitsubishi EDM Introduction
12/55
8/13/2019 Mitsubishi EDM Introduction
13/55
8/13/2019 Mitsubishi EDM Introduction
14/55
8/13/2019 Mitsubishi EDM Introduction
15/55
8/13/2019 Mitsubishi EDM Introduction
16/55
8/13/2019 Mitsubishi EDM Introduction
17/55
Start upPress the Screen on/off button
To turn the screen back on
Release the emergency stop buttonThe computer is ready to be used nowTo jog the machine you must press the Ready
button.
Press the Ready button The Deionization system will startYou will be able to jog the machine or start a cut.
8/13/2019 Mitsubishi EDM Introduction
18/55
1st2nd
3rd
8/13/2019 Mitsubishi EDM Introduction
19/55
ShutdownPress the Emergency Stop buttonClean the water and debris offTurn off the lightClose the front coverTurn off the screen with the screen on/off button
Screen Off
8/13/2019 Mitsubishi EDM Introduction
20/55
Start up from Complete Shutdown
Press POWER ON (green button located on topof the screen) NOTE: do not need to do the following
ZERO POINT RETURNlocated on the work piece setup page
Press READY button located on top right handside of the control panel
Move to LEFT REAR corner using the hand held pendant (can adjust the speed by pressing one of the 4speed keys)Work piece setup
ZERO POINT RETURNSelect all axis (when finished at the top right of the screen itwill display MOVE FN = move finished)
8/13/2019 Mitsubishi EDM Introduction
21/55
Workpiece Setup Screen
8/13/2019 Mitsubishi EDM Introduction
22/55
Jogging the machineOn the Handheld pendant
Press the Hand button
The speed of movement is selected at the top of the pendant.Rapid, Medium, 0.0005, 0.0001
Press and hold one of the 4 bottom buttons -X, +Y, -Y, +X
8/13/2019 Mitsubishi EDM Introduction
23/55
Hand Held Pendant
8/13/2019 Mitsubishi EDM Introduction
24/55
RapidMedium 0.0005
0.0001
Edge Find
Center Find Wire Align
ManualWire
ContactDo Not Use
Yet
Jogs the Uor V axes
8/13/2019 Mitsubishi EDM Introduction
25/55
8/13/2019 Mitsubishi EDM Introduction
26/55
8/13/2019 Mitsubishi EDM Introduction
27/55
Jog Speeds
8/13/2019 Mitsubishi EDM Introduction
28/55
Mounting WorkpiecesThe Bed of the RA90 is Soft Stainless steel
Dont drop parts, etc. on it! Threads do Not go through
So the screws do not hit the bottom flush cupUse paper towels to clean it
Not shop ragsIncase there are metal chips in the rags
Lay workpiece on edge and tilt downPlace a penny under the heel block
8/13/2019 Mitsubishi EDM Introduction
29/55
8/13/2019 Mitsubishi EDM Introduction
30/55
Misc. NotesKeep clamps etc. low profile
So they do Not hit the upper guide etc.
You do not have to clamp them as good as ona milling machine.
The EDM does not apply any pressure to the
workpiece.Use stainless steel capscrews and fixturingwhen possible
8/13/2019 Mitsubishi EDM Introduction
31/55
Gently pull the wire through the top wire guide.Above the top wire guide, there is a wheel with ahandle on it, USE IT to bring out more wireapproximately 2.5 feet.Then there are 2 ways of turning on the WIRECOLLECT.
Flip the toggle switch up, located at the lower part ofthe control panel.
And it will start. You should hear the vacuum sound start.
Press the S10 key NEXT and the wire collect willappear the S7 key.
The S keys are located at the bottom of the screen.
Rethreading
8/13/2019 Mitsubishi EDM Introduction
32/55
8/13/2019 Mitsubishi EDM Introduction
33/55
8/13/2019 Mitsubishi EDM Introduction
34/55
8/13/2019 Mitsubishi EDM Introduction
35/55
PickupsWork-piece pickups
8/13/2019 Mitsubishi EDM Introduction
36/55
8/13/2019 Mitsubishi EDM Introduction
37/55
Pickup Center of HoleSelect the Center button on the pendant
Press one of the directional axis jog buttons
This determines where to start the touch-off
8/13/2019 Mitsubishi EDM Introduction
38/55
8/13/2019 Mitsubishi EDM Introduction
39/55
Corner Pick-upSelect the Corner-p button on the pendant
Set the followingA. Start Dist X ______B. Y ______C. Machine St. Pt. X ______D. Y ______
Measure times _1_
Stp. IN
8/13/2019 Mitsubishi EDM Introduction
40/55
Edge PickupUsed to find one edges location.
8/13/2019 Mitsubishi EDM Introduction
41/55
8/13/2019 Mitsubishi EDM Introduction
42/55
Water level Gauge
Water Level Low
Water Overfull
Correct WaterLevel
8/13/2019 Mitsubishi EDM Introduction
43/55
Nozzle PositioningUpper water nozzle should be 0.010 awayfrom the top of the workpiece.
8/13/2019 Mitsubishi EDM Introduction
44/55
8/13/2019 Mitsubishi EDM Introduction
45/55
8/13/2019 Mitsubishi EDM Introduction
46/55
Flow of Operations to Run a program
8/13/2019 Mitsubishi EDM Introduction
47/55
8/13/2019 Mitsubishi EDM Introduction
48/55
Power SettingsMitsubishi-Epacks
The IP is the parameter we change.
-We reduce the IP ifWire keeps breaking
8/13/2019 Mitsubishi EDM Introduction
49/55
8/13/2019 Mitsubishi EDM Introduction
50/55
8/13/2019 Mitsubishi EDM Introduction
51/55
8/13/2019 Mitsubishi EDM Introduction
52/55
8/13/2019 Mitsubishi EDM Introduction
53/55
We reduce the IP ifWire keeps breaking
We change the Epack From roughing/ finishing
8/13/2019 Mitsubishi EDM Introduction
54/55
8/13/2019 Mitsubishi EDM Introduction
55/55