Page 2: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Current South Playground Situation

• Play equipment capacity for ~ 60 children• Drainage problems near building• Major sidewalks not connected• Very little grass• Pea gravel spread everywhere• No shade• Sloped landscape on west side• Railroad ties need replacing• Wooden play structure in poor condition and

needs replacing

Page 3: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

New Playground Equipment

CAPACITY : Up to 54 ChildrenAGE: 5-12 yrs.SIZE: 32’L X 37’WUSE ZONE: 44’L X 49’WWEIGHT: 4,827 lbs.

17 Play Events Featuring:• Deep Rung Arch Climber• Chute Slide• Cargo Net Climber• Triple Rail Slide

• Lily Pad Bridge• Open Spiral Slide• Arched Bridge• Wave Slide

PLAYLAND MODEL PS3-18782 KIDSPLAY MODEL 400-01607

Project Lead: Timmy Clemmons & Tammy Jones

Page 4: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Basketball and Soccer EquipmentProject Lead: Brian Mellberg & William Powell

Page 5: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Grade Appropriate Playground SuppliesProject Lead: Quintessa Thomas

Page 6: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Pavilion

• Plan calls for a 15 x 15 foot pavilion, located in the center of the playground. Home Depot is helping build the structure as part of a community service project.

Project Lead: Richard Wietlake & Mike Price

Page 7: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Future Playground Layout

New Sidewalk

New Equipment

New B-Ball Goals

Pavilion

Mulch/Juniper

Soccer Goals

Fencing Grass – Sod/Seed

Page 8: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Unscheduled Projects

• Replace Railroad Ties• Irrigation / Sprinkler System

– Need to identify a Project Lead

– Specify design / zoning / system

– Obtain quotes from MCBOE approved sources

– Present detailed plan and request funding

• Landscaping / Sod– Need to identify a Project Lead

– Include Trees, Juniper, Mulch, & Topsoil

– Obtain quotes from MCBOE approved sources

– Present detailed plan and request funding