MONROVIA ELEMENTARY SCHOOL
PLAYGROUND IMPROVEMENT PLAN
Current South Playground Situation
• Play equipment capacity for ~ 60 children• Drainage problems near building• Major sidewalks not connected• Very little grass• Pea gravel spread everywhere• No shade• Sloped landscape on west side• Railroad ties need replacing• Wooden play structure in poor condition and
needs replacing
New Playground Equipment
CAPACITY : Up to 54 ChildrenAGE: 5-12 yrs.SIZE: 32’L X 37’WUSE ZONE: 44’L X 49’WWEIGHT: 4,827 lbs.
17 Play Events Featuring:• Deep Rung Arch Climber• Chute Slide• Cargo Net Climber• Triple Rail Slide
• Lily Pad Bridge• Open Spiral Slide• Arched Bridge• Wave Slide
PLAYLAND MODEL PS3-18782 KIDSPLAY MODEL 400-01607
Project Lead: Timmy Clemmons & Tammy Jones
Basketball and Soccer EquipmentProject Lead: Brian Mellberg & William Powell
Grade Appropriate Playground SuppliesProject Lead: Quintessa Thomas
Pavilion
• Plan calls for a 15 x 15 foot pavilion, located in the center of the playground. Home Depot is helping build the structure as part of a community service project.
Project Lead: Richard Wietlake & Mike Price
Future Playground Layout
New Sidewalk
New Equipment
New B-Ball Goals
Pavilion
Mulch/Juniper
Soccer Goals
Fencing Grass – Sod/Seed
Unscheduled Projects
• Replace Railroad Ties• Irrigation / Sprinkler System
– Need to identify a Project Lead
– Specify design / zoning / system
– Obtain quotes from MCBOE approved sources
– Present detailed plan and request funding
• Landscaping / Sod– Need to identify a Project Lead
– Include Trees, Juniper, Mulch, & Topsoil
– Obtain quotes from MCBOE approved sources
– Present detailed plan and request funding