Monthly provisional values union for the co-ordination of transmission of electricity September 2006

Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

Monthly provisional valuesunion for the co-ordination of transmission of electricity

September 2006

Page 2: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

Table of contents Page

1 Electricity supply situation of the countries 2

2 Physical energy flows 3

3 Monthly consumption 4

4 Monthly consumption variation 6

5 Consumption of the last 12 months 8

6 Variation of the last 12 months’ consumption 10

7 Load flows (night) 12

8 Load flows (day) 13

9 Unavailability of international tie lines ( major events ) 14

10 Network reliability ( major events ) 16

11 Scheduled exchanges 17

12 Load on the 3rd Wednesday 18

General remarks and abbreviations used in the tables

- All values of production and consumption in chapter 1, 3&4, 5&6 and 12 are calculated to represent100% of the national values.

- DK_W Denmark West represents the Western part of Denmark synchronously interconnected withUCTE (Jutland and Funen).

- UA_W Ukraine West represents the so-called Burshtyn Island synchronously interconnected withUCTE.

- CET Central European Time

- The Bulgarian values of production and consumption are gross values.

Monthly provisional values from UCTE database as of 15 January 2007

Page 3: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

1 Including deliveries from industry2 The reported figures are best estimates based on actual measurements and extrapolations.3 Data on hydro, other renewable, not clearly identifiable production are not yet available.

All representativities of the national production and consumption values used to calculate values at a representativity of100% as stated in the table above

1 Electricity supply situation of the countries

2

Countries AT BA BE BG CH CS CZ DE ES FR GR HR HU IT LU MK NL PL PT RO SI SK DK_W

UA_W

ProductionTherm.nuclear 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100Thermal conv. 100 100 100 100 100 100 100 100 97 100 100 100 100 100 100 100 100 100 94 100 100 100 100 100

Hydro prod 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100Other renew. 100 100 100 100 100 100 100 100 95 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100Not identify 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Consumption 100 100 100 100 100 100 100 100 98 100 100 100 100 100 100 100 100 100 96 100 95 100 100 100

3

Consumption in GWhbalance

Coun- Therm. Therm Hydro Other Of Not var. var.tries nuclear conv. prod renew. w hich iden- Total monthly [%]

wind tify

AT 0 1243 2810 0 0 598 4651 1 801 264 5188 3,5 66567 4,9BA 0 613 358 0 0 0 971 -131 0 840 1,9 11209 0,9BE 3431 2617 118 200 20 0 6366 1 818 141 7043 1,7 89838 2,9BG 1343 1793 212 0 0 0 3348 -601 39 2708 5,2 36661 3,2CH 2234 180 3121 83 0 0 5618 1 -477 227 4914 0,0 63631 2,0CS 0 2189 693 0 0 0 2882 1 99 48 2933 2,9 42566 2,9CZ 1732 4014 233 14 6 0 5993 1 -1149 82 4762 2,3 64588 3,7DE 13273 25245 1959 3348 2173 0 43825 1 -407 812 42606 -1,1 558363 0,2ES 4323 13863 1511 1803 1442 0 21500 1 -317 489 21216 6,0 258895 4,8FR 33831 2579 4223 396 152 0 41029 -6958 524 33547 -2,7 482879 0,4GR 0 3535 328 111 101 0 3974 1 375 63 4286 1,7 53834 2,7HR 0 312 366 3 2 0 681 1 420 12 1089 -13,2 16881 3,3HU 961 1600 0 0 0 0 2561 1 651 0 3212 2,4 40498 4,1IT 0 20799 3447 798 270 0 25044 1 3892 704 28232 1,4 334676 1,6LU 0 270 70 9 3 0 349 287 92 544 2,3 6584 6,5MK 0 330 71 0 0 0 401 1 169 0 570 6,1 8407 7,1NL 314 6418 0 542 145 0 7274 1 1989 0 9263 1,0 115809 1,7PL 0 11547 213 32 23 0 11792 1 -959 109 10724 5,0 135851 4,6PT 0 2569 380 363 204 0 3312 1 711 86 4100 4,1 51095 3,3RO 124 2542 1701 0 0 0 4367 1 -248 4 4115 4,7 52695 1,6SI 495 351 230 0 0 0 1076 17 0 1093 3,1 13112 0,6SK 1150 388 248 1 0 201 1988 1 86 17 2057 4,9 27209 4,1

UCTE 63211 104997 22292 7703 4541 799 199002 1 -932 3713 195042 1,0 2531848 1,9DK_W 0 1520 1 476 387 0 1997 1 -289 0 1708 0,8 21708 2,2UA_W 0 654 11 0 0 0 665 1 -366 0 299 15,0 4417 0,5

Net production in GWh

last 12 months

Pump

in GWh [%]in GWh

Exchange

2

3

Page 4: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

These physical energy flows were measured on the cross-frontier transmission lines (< 110 kV) listed in table 9 of the Statistical Yearbook.These values may differ from the official statistics and the exchange balances in chapter 1.

1 Other III: Albania, Belarus, Denmark East, Great Britain, Morocco, Republic of Moldavia, Norway, Sweden, Republic of Turkey and Ukraina

Total physical energy flows =Sum of physical energy flows between UCTE countries =

2 Physical energy flows

3

GWhValues in

BEDE

PL

CS

GR

FR

ESPT

SK

BA

NL

HU

CZ

CH

AT

SI

LU

HR

MK

IT

Associate member(synchronous with UCTE region)

Synchronous operationwith UCTE region

UA_W

RO

BG

NO

SE

RU

LT

BY

MD

TR

AL

GB

DK_W

IRL

MAMA DZ TN

DK_E

UA

110 →→←← 808

←←

215

37 →

→→

→→

←←

← 6

9

1395 →← 32

←← 100

1980 →← 4

← 202

132 →

790 →←

75

← 42265 →

←←← 9

88 →← 77

← 35840

6 →

→51 →

← 1

14132 →

46 →163 →

← 200

←← 73

127 →→

←←

470457 →

← 6

← 204 ← 3

34

← 1

27

← 167

←←

175

←← 27

28 →

← 486 65 →← 85

← 100

← 3

44

151

← 61

←←← 34

←←

1

80 →→

← 7

4

← 25

1

←← 15

1468

→→

← 67

7

968 →→

← 1115

1108 →

← 373

← 58

←← 754

← 5

54

← 6

49

1 →←←

695

← 4

0

←←

122

236

→→

←←

← 2

923

3→→

11 →→

←←

310

←←

223

0 2 →←← 94

4 →

216→

→→

1 →

←← 72

12 →

48 →→

22 →

←←

← 2

0→

→→

←← 5

←← 206

4 →

←←

807

←← 81

233→

→→

212 →→

639

→→

121→

→→→

→→

←←

←←

←←←←

240→

→→

→→→→

←←

←←

←←

32

22 →

Im porting countr ie sExpor ting countr ie s

A T BA BE BG CH CS CZ DE ES FR GR HR HU IT LU MK NL PL PT RO SI SKDK_W

UA _W

Other III1

A T - - - - 486 - 0 358 - - - - 51 114 - - - - - - 65 - - - - 1074BA - - - - - 163 - - - - - 206 - - - - - - - - - - - - - 369BE - - - - - - - - - 15 - - - - 132 - 790 - - - - - - - - 937BG - - - - - 100 - - - - 344 - - - - 72 - - - 151 - - - - 0 667CH 12 - - - - - - 406 - 100 - - - 2230 - - - - - - - - - - - 2748CS - 200 - 0 - - - - - - - 167 4 - - 175 - - - 0 - - - - 27 573CZ 649 - - - - - - 754 - - - - - - - - - 1 - - - 457 - - - 1861DE 1108 - - - 807 - 11 - - 4 - - - - 422 - 1115 88 - - - - 236 - 449 4240ES - - - - - - - - - 37 - - - - - - - - 808 - - - - - 215 1060FR - - 1468 - 968 - - 1980 677 - - - - 1395 - - - - - - - - - - 639 7127GR - - - 0 - - - - - - - - - 34 - 1 - - - - - - - - 61 96HR - 46 - - - 0 - - - - - - 0 - - - - - - - 373 - - - - 419HU 58 - - - - 127 - - - - - 334 - - - - - - - 2 - 0 - 0 - 521IT 0 - - - 1 - - - - 32 48 - - - - - - - - - 4 - - - - 85LU - - 202 - - - - 65 - - - - - - - - - - - - - - - - - 267MK - - - 0 - 0 - - - - 80 - - - - - - - - - - - - - - 80NL - - 75 - - - - 22 - - - - - - - - - - - - - - - - - 97PL - - - - - - 695 77 - - - - - - - - - - - - - 310 - - 121 1203PT - - - - - - - - 110 - - - - - - - - - - - - - - - - 110RO - - - 74 - 251 - - - - - - 94 - - - - - - - - - - 22 0 441SI 85 - - - - - - - - - - 132 - 204 - - - - - - - - - - - 421SK - - - - - - 6 - - - - - 554 - - - - 0 - - - - - 127 - 687DK_W - - - - - - - 122 - - - - - - - - - - - - - - - - 452 574UA _W - - - - - - - - - - - - 470 - - - - - - 40 - 5 - - - 515Other III1 - - - 0 - 28 - 49 0 69 0 - - - - - - 154 - 0 - - 41 - - 341 Sum im p 1912 246 1745 74 2262 669 712 3833 787 257 472 839 1173 3977 554 248 1905 243 808 193 442 772 277 149 1964 26513

Sum e xport

26513GWh23186GWh

Page 5: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

3 Monthly consumption

4

TWh

I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2005 2006

60TWh

30

0I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

2005 2006

TWh

I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2005 2006

200

150

250

CH

AT

NL

BE

PT

DE

FRIT

ESPL

UCTE

6,0

3,0

12,0

9,0

Page 6: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

3 Monthly consumption

5

TWh

I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2005 2006

TWh

I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2005 2006

TWh

I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

2005 2006

7,5

BA

HR

MK

UA_W

DK_W

BG

SK

SI

CS

LU

1,1

0

2,2

CZ

RO

GR

HU

5,0

2,5

1,0

2,0

3,0

4,0

5,0

0

Page 7: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

Monthly consumption variation4

6

2005 2006 Values in %

10UC 0TE -10

I II III IV V VI VII VIII IX X XI XII

20 10

0 0

AT -20 -10 CZI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

20 10

0 0

BA -20 -10 DEI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

10 15

0 0

BE -10 -15 ESI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

15 10

0 0

BG -15 -10 FRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

30 10

00

CH -10 -10 GRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

15 15

0 0

CS -15 -15 HRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

Page 8: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

Monthly consumption variation4

7

2005 2006 Values in %

10

0

HU -10 PTI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

10

0 0

IT -10 ROI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

10

0

LU -20 SII II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

10

0

MK -10 SKI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

20

0

NL -10 DK_WI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

20

0

PL -20 UA_WI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII

0

10

-10

10

-10

0

20

-20

0

20

-10

0

10

-10

0

10

-10

Page 9: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

Consumption of the last 12 months5

8

TWh

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

1800

2600

UCTE

0

300

600DE

FRIT

ES

PL

CH

30

60

90

120

BE

HU

AT

GR

NL

Page 10: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006 9

Consumption of the last 12 months5TWh

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2001 2002 2003 2004 2005 2006

10

40

70CZ

HR

SK

PT

0

20

40

60RO

CS

SI

BG

LU

DK_W

0

7

14

MK

BA

UA_W

Page 11: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

Variation of the last 12 months´consumption in %6

10

UCTE2001 2002 2003 2004 2005 2006

AT CZ2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

BA DE2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

BE ES2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

BG FR2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

CH GR2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

CS HR2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

-5

0

5

10

-5

0

5

10

-10

-5

0

5

-5

0

5

10

-5

0

5

10

-5

0

5

10

-15

0

15

-20

-10

0

10

-5

0

5

10

-5

0

5

10

-5

0

5

10

-5

0

5

10

-5

0

5

10

Page 12: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006 11

Variation of the last 12 months´consumption in %6

HU PT2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

IT RO2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

LU SI2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

MK SK2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

NL DK_W2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

PL UA_W2001 2002 2003 2004 2005 2006 2001 2002 2003 2004 2005 2006

-5

0

5

10

-5

0

5

10

-5

0

5

10

-505

1015

-5

0

5

10

-5

0

5

10

-505

1015

-5

0

5

10

-10

-5

0

5

-5

0

5

10

-5

0

5

10

-5

0

5

10

Page 13: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

ATC

H

ES

IT

FR

SIB

AC

S

HU

CZ

SK

LU

BE

NL

GB

DK

_W

DE

PL

SE

RU

SLT BY

UA

_W

AL

GR

BG

RO

PT MA

HR

MK

MD

TR

I = Import balanceE = Export balance

MA

Associate member

Synchronous operation with UCTE region

NO

DK_E

UA

Sum of load flows in MW:UCTE =Total =

September 20067

12 UCTE September 2006

Load flows (night) on 20.09.06 at 03:00 a.m. CET in MW

22

825

470

189

68

374

28

197

24 362197

116

411

32

3007

37

104

251

4101664

1320

1

1852

1186

1329

837

17

252

1511

1915

1527

2819

1599

61

498

3

566

1

49153

183

623

305

88

144

446

1

317

155

I = 3

3

E =

112

E =

59

E =

1664

E =

1053

I = 5

10

E =

245

I = 7

64

I = 8

81

E =

1054

5

E =

496

I = 1

511

I = 1

38I =

499

2

I = 6

56

I = 5

61

I = 6

84

E =

77

E =

630

I = 6

431

2

70

251

98

552

18

1079

262 25

70

200

5

559

79416

438

89559

18

291

20

24

1267

1527

35983 MW

30387 MW

E =

1484

I = 2

408

E =

474

I = 8

9

Page 14: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

ATC

H

ES

IT

FR

SIB

AC

S

HU

CZ

SK

LU

BE

NL

GB

DK

_W

DE

PL

SE

RU

SLT BY

UA

_W

AL

GR

BG

RO

PT MA

HR

MK

MD

TR

I = Import balanceE = Export balance

MA

Associate member

Synchronous operation with UCTE region

NO

DK_E

UA

Sum of load flows in MW:UCTE =Total =

September 20068

13UCTE September 2006

35555 MW

32741 MW

E =

135

E =

374

I = 1

453

E =

758

E =

2766

I = 1

47

E =

1817

I = 4

938

E =

151E

= 10

238

I = 3

98

I = 4

56

I = 1

088

I = 6

104

I = 3

68

I = 2

80

I = 2

842

E =

1416

I = 6

41

E =

307

I = 4

50

E =

512

64

286

658

213

59

122

145 38

6

49

101

1786

479

121

3346

94

255

5611689

377

599

732

1261

75232

962

2996

1024

3620

797

2039

58

63

333

50

31838

78

75

810

364

321

410

96

1

360

2947

101

373

20

147

E =

477

305

200

130

103246

1

249

70

326

1

4

69521

0123

2336

9

183

560

10

1070

623

609

Load flows (day) on 20.09.06 at 11:00 a.m. CET in MW

E =

551

Page 15: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

0,5 mm 2,0 mm 2,5 mm1,5 mm1,0 mm

20.02.01 08:21 AM21.02.01 08:29 AM22.02.01 10:03 AM23.02.01 08:27 AM

All’Acqua

UCTE September 2006UCTE September 20061414

Unavailability of international tie lines( major events with sum over 1100 minutes ) 9 9 September 2006

Reasons :

DK_W

ES

PT MA

FRGB

BELU

NL

DE

CH

NO Ensted

Bulciago

124

Serra

Gorlago

Winkeln

Y-Rehag

Balboa

Alqueva

01.09.06 00:00 AM R6

164.1.1NO / Kristiansand - DK_W / Tjele 350 MVA

43200 min

01.09.06 00:00 AM R1

121.4.1CH / Lavorgo - IT / Musignano 380 kV / 1204 MVA

1151 min

Mastaing

Kristiansand Tjele

18.09.06 09:37 AM R9

71.2.1FR / St-Avold - DE / Ensdorf 220 kV / 261 MVA

3271 min

26.09.06 07:21 AM R1

82.1.1FR / Bois-Tollot - CH / Verbois 380 kV / 1211 MVA

3358 min

01.08.06 06:18 AM R102.08.06 06:17 AM R103.08.06 06:30 AM R1

11.1.1NL / Meeden - DE / Diele 380 kV / 1382 MVA

1864 min

Diele04.09.06 07:16 AM R1

26.2.1NL / Borssele - BE / Zandvliet 380 kV / 1476 MVA

6004 min

01.09.06 00:01 AM R1

92.1.1FR / L. B.Carros - IT / Camporosso 220 kV / 320 MVA

9419 min

11.09.06 07:37 AM R1

82.2.2FR / Génissiat - CH / Verbois 220 kV / 315 MVA

3258 min

04.09.06 07:08 AM R1

82.2.1FR / Génissiat - CH / Verbois 220 kV / 315 MVA

3204 min

05.09.06 01:30 AM R1

221.2.1GB / Sellindge - FR / Mandarins 270 kV / 1000 MVA

3120 min

18.09.06 07:40 AM R1

121.2.1CH / Gorduno - IT / Mese 220 kV / 278 MVA

17863 min

IT

R1 - MaintenanceR2 - RepairR3 - New constructions R4 - Overload (also calculated break)R5 - False operation R6 - Failure in prodection device or other element R7 - Outside impacts (animals, trees, fire, avalanches, ...)R8 - Very exceptional conditions (weather, natural disaster, ...) R9 - Other reasonsR10 - Unknown reasons

25.09.06 08:00 AM R1

94.1.1FR / Lucciana - IT / Suvereto 220 kV / 300 MVA

8160 min

25.09.06 08:23 AM R1

52.1.1BE / Aubange - FR / Moulaine 220 kV / 286 MVA

8137min

25.09.06 07:25 AM R1

123.1.1CH / Riddes - IT / Avise 220 kV / 309 MVA

6380 min

01.09.06 00:00 AM R905.09.06 04:44 PM R1

27.09.06 01:43 AM R1

07.09.06 02:46 PM R607.09.06 07:55 PM R6

221.1.1GB / Sellindge - FR / Mandarins 270 kV / 1000 MVA

5466 min

Page 16: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

0,5 mm 2,0 mm 2,5 mm1,5 mm1,0 mm

20.02.01 08:21 AM21.02.01 08:29 AM22.02.01 10:03 AM23.02.01 08:27 AM

Unavailability of international tie lines( major events with sum over 1100 minutes ) 9 9 September 2006

UCTE September 2006UCTE September 2006 1515

Reasons : R1 - MaintenanceR2 - RepairR3 - New constructions R4 - Overload (also calculated break)R5 - False operation R6 - Failure in prodection device or other element R7 side impacts animals, trees, fire, avalanches, ...)-

-Out (

R8 Very exceptional conditions (weather, natural disaster, ...) R9 - Other reasonsR10 - Unknown reasons

DE

BY

SK

HU

RO

HRSI

AT

AL

GR

SE

IT

MK

BG

01.09.06 00:00 AM R10

391.1.1 CS/Kosovo A - MK/Skopje1 220 kV / 311 MVA

43200 min

CS

711

420

PL

460

DK_W

450

UA_W

BA

700700410430

710

25.09.06 06:48 AM R1

141.2.1 CH / Winkeln - AT / Meiningen 220 kV / 776 MVA

8232 min

CZ

730

01.09.06 00:00 AM R10

391.2.1 CS/Kosovo A - MK/Skopje1 220 kV / 311 MVA

43200 min

UA

Kozlodui

Isalnita

276

04.09.06 07:18 AM R3

444.1.1 CZ / Nošovice - PL / Wielopole 400 kV / 1088 MVA

38442 min

01.09.06 00:00 AM R205.09.06 08:01 AM R206.09.06 08:07 AM R207.09.06 08:01 AM R2

165.1.1 SE / Stenkullen - DK_W / V. Hassing 125 MVA

6601 min

Vester Hassing Stenkullen

165

Galatina

Arachthos

205IT

23.09.06 08:34 AM R124.09.06 07:46 AM R125.09.06 07:22 AM R126.09.06 07:23 AM R127.09.06 07:38 AM R128.09.06 07:40 AM R1

383.5.1 BA / Ugljevik - CS / Sr.Mitrovica 380 kV / 1264 MVA

4390 min

17.09.06 07:35 AM R118.09.06 01:23 PM R518.09.06 07:09 PM R520.09.06 04:41 PM R5

381.3.1 BA / Trebinje - CS / Herceg Novi 110 kV / 90 MVA

2785 min

25.09.06 07:05 AM R1

321.1.2 DE / Etzenricht - CZ / Prestice 380 kV / 1579 MVA

6082 min

14.08.06 07:00 AM R1

201.1.1 IT / Redipuglia - SI / Divaca 380 kV / 1619 MVA

9240 min

01.09.06 07:28 AM R327.09.06 10:28 AM R1

420.1.1 CZ/ Sokolnice - SK / Senica 220 kV / 318 MVA

31400 min

04.09.06 07:28 AM R1

276.1.1 RO/ Isalnita - BG/ Kozlodui 220 kV / 330 MVA

6312 min

Mukacevo

Rosiori

740

710

Sr.MitrovicaUgljevik

04.09.06 06:11 AM R105.09.06 06:10 AM R106.09.06 06:12 AM R107.09.06 06:24 AM R1

241.1.1 MK / Dubrovo - GR / Thessaloniki 400 kV / 1300 MVA

2764 min

04.09.06 06:06 AM R1

722.1.1 HU/Kisvárda - UA_W/Mukacevo 220 kV / 312 MVA

7534 min

25.09.06 06:05 AM R1

721.1.1 HU/Sajószöged - UA_W/Mukacevo 400 kV / 1635 MVA

7240 min

04.09.06 06:03 AM R1

242.1.1 MK / Bitola - GR / Amyndeo 150 kV / 120 MVA

5942 min

13.09.06 08:45 AM R115.09.06 06:15 AM R116.09.06 06:00 AM R117.09.06 06:00 AM R118.09.06 06:35 AM R119.09.06 07:27 AM R120.09.06 07:47 AM R121.09.06 07:14 AM R122.09.06 07:15 AM R123.09.06 07:26 AM R125.09.06 07:42 AM R126.09.06 07:22 AM R127.09.06 07:12 AM R128.09.06 07:22 AM R129.09.06 07:46 AM R130.09.06 07:29 AM R1

271.1.1 CS / Niš - BG / Sofia Zapad 380 kV / 1264 MVA

11192 min

09.09.06 07:24 AM R3

424.1.1 CZ/ Sokolnice - SK / Krizovany 400 kV / 1503 MVA

2042 min

11.09.06 08:06 AM R123.09.06 10:15 AM R1

710.1.1 SK / Gabcikovo - HU / Györ 400 kV / 1246 MVA

16719 min

11.09.06 06:15 AM R1

722.1.2 HU/Tiszalök - UA_W/Mukacevo 220 kV / 312 MVA

6346 min

Page 17: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

1 ( year [in min] * energy not supply ) / consumption last 12 months

Reasons:R4 Overload (also calculated break) R8 Very exceptional conditionsR5 False operation (weather, natural disaster, ...)R6 Failure in protection device or other element R9 Other reasonsR7 Outside impacts (animals, trees, fire, avalanches, ...) R10 Unknown reasons

(animals, trees, fire, avalanches, ...)

Network reliability ( major events )10

16

BEDE

PL

CS

GR

FR

ESPT

SK

BA

NL

HU

CZ

CH

AT

SI

LU

HR

MK

IT

RO

BG

DK_W

UA_W

No Country Substation Reason Energy not supplied Total loss of power Restoration Equivalent time [ MWh ] [ MW ] time [ min ] of interruption1

1 DE Kusenhorst R10 216 360 36 0,20

1

Page 18: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

- Control areas can differ from national borders ( i.e. German block which includes parts of AT, LU and DK ).

- Values are calculated on an hourly base ( MWh ).

- This values are not the provisional values entered in the VULCANUS system, but the definitive values afteran eventual correction during the actual date.

- Export Programs: Sum of all positive values of every hour of every border- Import Programs: Sum of all negative values of every hour of every border

- Export Programs at 03:00: Sum of all positive values the third Wednesday from 02:00 to 03:00 a.m.- Import Programs at 03:00: Sum of all negative values the third Wednesday from 02:00 to 03:00 a.m.

- Export Programs at 11:00: Sum of all positive values the third Wednesday from 10:00 to 11:00 a.m.- Import Programs at 11:00: Sum of all negative values the third Wednesday from 10:00 to 11:00 a.m.

17

11 Scheduled exchanges in MWh

Control Export Import Export Import Export Importarea Programs Programs Programs Programs Programs Programs

at 03:00 at 03:00 at 11:00 at 11:00

AT 529432 342890 466 579 984 363BA 210592 81641 340 89 453 70BE 602274 1338093 1114 1922 870 2068BG n.a. n.a. n.a. n.a. n.a. n.a.CH 2547289 2078449 2959 3018 5588 2836CS 274897 368179 298 244 353 483CZ 1777690 580578 2334 586 2691 799DE 2378556 2965827 2059 3829 2036 7011ES 1200190 882757 1817 1300 895 809FR 7895777 1030144 11954 1372 10762 542GR 50524 422267 22 721 119 521HR 42061 462242 149 687 247 715HU 442673 1094545 587 1263 600 1700IT 85490 3976909 249 5241 50 6154

MK 78454 247548 7 130 7 293NL 321632 2127855 457 2878 118 2982PL 1032713 100583 1287 134 1604 214PT 110911 821713 0 1500 0 646RO 425036 175207 383 314 753 267SI 529393 546285 765 687 1000 670SK 586242 617888 781 760 851 1214

DK_W 553214 263843 970 800 462 0UA_W 362335 0 475 0 549 0

Page 19: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major

September 2006

UCTE September 2006

1 Variation as compared to corresponding month of theprevious year

2 Power produced in parallel operation(including autoproduction)

3 The reported figures are best estimates based on actualmeasurements and extrapolations.

4 Average value of each hour

Load on the 3rd Wednesday

18

12

Highest Load ParallelloadMW var.%1 % MW

AT 7656 2,0 100 8725BA 1547 4,0 100 1741BE 3 11628 3,3 100 10037BG 4472 4,0 100 4824CH 8556 -0,6 100 11226CS 5340 4,5 100 4475CZ 7908 1,6 100 9873DE 73782 -2,6 91 72200ES 35535 5,1 98 33301FR 55241 -2,0 100 65219GR 7331 1,9 100 6603HR 2303 1,1 100 1779HU 5505 -0,9 100 4213IT 48092 1,8 100 41089LU 797 -13,3 100 835MK 1002 7,7 100 548NL 15500 6,6 100 12342PL 4 18480 1,0 100 22430PT 7131 4,7 96 5930RO 6855 4,0 100 6799SI 1974 0,8 95 2049SK 3435 0,0 100 2953

UCTE 315951 1,3 329191DK_W 3021 -1,0 100 3715UA_W 717 15,8 100 1143

pow er2representativity

Consumption hourly load curves on 20.09.2006 Values in GW

0

20

40

60

80DE

FR

ES

PL

IT

3

6

9

12

15

18

NL BE

CZ

GR

0

3

6

9

HU

SK

AT

MK

CH

0

2

4

6

8

SI

PT

LU

BG

DK_W

0 2 4 6 8 10 12 14 16 18 20 22 h

0 2 4 6 8 10 12 14 16 18 20 22 h

0

2

4

6

8

UA_W

RO

BA

CS

HR

0 2 4 6 8 10 12 14 16 18 20 22 h

0 2 4 6 8 10 12 14 16 18 20 22 h

0 2 4 6 8 10 12 14 16 18 20 22 h

0 2 4 6 8 10 12 14 16 18 20 22 h

140

210

280

350

UCTE

Page 20: Monthly provisional values from UCTE database as of 15 ... · 8 Load flows (day) 13 9 Unavailability of international tie lines ( major events ) 14 10 Network reliability ( major