Monthly Stakeholder Meeting

June 17, 2019

Page 2: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

2

This PowerPoint presentation was prepared by the Florida Department of Transportation (FDOT) staff and has been made available to the public as part of public records access. Any dissemination of this presentation by anyone or entity

other than FDOT staff is not official. Any questions can be sent to [email protected].

This presentation may not be altered.

Page 3: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

3

CURRENT DESIGN STATUS

• Roadway plans for I-95 north segment (segment 2A) complete

• 90% roadway plans for SR 836 and I-395

• Roadway plans for NE 13th Street complete

• Phase I TCP plans complete for I-95, I-395 and SR-836

• 60% signature bridge plans

• TCP generic plans and detour routes complete

OVERALL DESIGN STATUS

• Roadway - 80% • Structures – 45% • Maintenance of Traffic (MOT) – 50%

MAJOR DESIGN SUBMITTALS TO DATE:

Page 4: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

4

• Installation of new drainage (Phase 1 - completed)

• Construction of foundations for new overhead sign structures. This work will require

continuous weekend lane closures starting at 11 p.m. on Friday until 5:30 a.m. on

Monday (Ongoing)

• Construction of median barrier wall (Ongoing)

• Begin concrete pavement replacement – Grading operations ongoing, concrete

placement expected to begin end of June

UPCOMING CONSTRUCTION ACTIVITIES

THREE MONTH LOOK AHEAD

Page 5: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

5

Foundation work on northbound I-95 bridge approaching ramp to I-195 (Ongoing)

Page 6: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

6

NB I-95

Page 7: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

7

Pile driving operations for widening of the eastbound SR 836 ramp to northbound I-95 (Ongoing)

Page 8: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

8

Demolition of I-95 median barrier wall over NW 20 Street. Will require full closure of NW 20 Street under I-95 (Ongoing)

Page 9: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

9

• Installation of ITS devices for the Smart Workzone Management System (Ongoing)

• Nighttime single and double lane closures on SR 836 (Ongoing)

• Begin foundation work for bridges on eastbound SR 836 over the Lawrence Canal and

NW 17 Avenue (July)

• Eastbound SR 836 traffic shifted to the north side of the roadway from NW 12 Avenue to

I-95 to allow for construction of bridge widening (August/September)

UPCOMING CONSTRUCTION ACTIVITIES

THREE MONTH LOOK AHEAD

Page 10: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

10

SR 836 PHASE 1 – STEP 1

Widening of SR 836 to the

south to create future

eastbound lanes

Future widening for

westbound SR 836

Shift eastbound SR 836 traffic to the median to begin widening to the south (this week)

WESTBOUND SR 836 EASTBOUND SR 836

Page 11: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

11

SR 836 PHASE 1

N

LEGEND Median Work Zone

Demolition of bridges on eastbound SR 836 over the Lawrence Canal and NW 17 Avenue (this week)

Page 12: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

* This schedule does not reflect days added to the contract for

holidays, weather days or special events

12

Drainage work inside the loop ramp on NW 12 Avenue to eastbound SR 836 for future

courthouse supplemental parking (Ongoing)

Page 13: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

13

• Utility relocations (Ongoing)

• Widening activity on NE 13 Street between Biscayne Boulevard and NE 2 Avenue

(July/August)

• Bridge foundation work for I-395 collector-distributor bridges (July/August)

• Permanent closure of NE 12 Street between Biscayne Boulevard and NE 2 Avenue;

Traffic to be routed to NE 13 Street and NE 11 Street. (July/August)

UPCOMING CONSTRUCTION ACTIVITIES

THREE MONTH LOOK AHEAD

Page 14: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

Widening activity on NE 1 Avenue to convert to two-way traffic from I-395 to NE 13 Street – will require closure of left lane on NE 1 Avenue between I-395 and NE 13 Street (this week)

14

Page 15: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

15

Page 16: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

16

Page 17: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

• SR 836 UPCOMING CONSTRUCTION ACTIVITIES

17

UPCOMING CONSTRUCTION ACTIVITIES

THREE MONTH LOOK AHEAD

Demolition of barrier wall on I-395 and I-95 ramps to eastbound I-395 to allow for future bridge foundation construction (July)• The southbound I-95 ramp to eastbound I-395 will be reduced from two lanes to

one lane for approximately four years. • The travel lane and shoulder widths on northbound I-95 ramp to eastbound I-395

will be reduced. Will require nighttime closures at times• Traffic shift to the south on I-395 eastbound from I-95 to NW 1 Avenue

Page 18: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

18

NB I-95 Ramp to EB I-395 ramp will have lane and shoulder

widths reduced

SB I-95 Ramp to EB I-395 two lane ramp will be reduced to one lane

EB I-395 Travel Lanes shifted to the south

Page 19: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

19

Bridge foundation work for westbound Signature Bridge (December)

UPCOMING CONSTRUCTION ACTIVITIES

THREE MONTH LOOK AHEAD

Page 20: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

MAINTENANCE OF TRAFFIC (MOT)/HOURS

I-395 SPECIFICMainline Nightly Closures

• 10 pm to 5:30 am Sunday thru Thursday

• 1 am to 7 am Saturday and Sunday

SR 836 SPECIFICMainline Nightly Closures

• 8 pm to 5:30 am Sunday thru Thursday

• 8:30 pm to 9 am Friday

• 8:30 pm to 11 am Saturday

I-95 SPECIFICMainline Nightly Closures

• 9 pm to 5:30 am Sunday thru Thursday

RAMPS• 10 pm to 6:30 am Sunday thru Thursday

• 11 pm to 7 am Friday and Saturday

SPECIAL NOTES:• Special events will be taken into account when scheduling closures

• Hours noted above are for single lane closures, multi-lane closures will occur later

• Weekend lane closures will be permitted on I-95 from 11 p.m. on Friday to 5:30 a.m. on Monday• The contract documents allows for weekend closures on certain ramps

20

Page 21: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

• Provide drivers with real-time

travel information;

• Encourage motorists to take

alternate routes;

• Clear incidents more quickly,

thereby reducing secondary

incidents; and

• Make work zones safer for

highway workers and motorists.

Smart Work Zone Management

System (SWZMS) - The project will

implement a SWZMS that will utilize

Intelligent Transportation System

(ITS) Devices such as traffic

cameras, data collection devices

and portable message signs to:

TRAFFIC MANAGEMENT SYSTEM

21

Page 22: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

22

Media Availability- June 7,

2019

Media Outlets

• WSVN: Channel 7

• WFOR: Channel 4

• WTVJ: Channel 6

• WSVN: Channel 7

• Telemundo

• Univision

• Estrella TV

Page 23: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

23

2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP

Page 24: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

24

COMMUNITY OUTREACH

PROJECT WEBSITE

• www.i-395miami.com

• Sign-up for project alerts/updates

Lane Closure information

Upcoming construction activities

Presentations

• Calendar of events

OUTREACH OFFICE IN THE OVERTOWN COMMUNITY

• 1035 NW 3 Avenue, Miami, Florida 33136

STAKEHOLDER MEETINGS

• Ongoing individual stakeholder meetings and presentations

• Next stakeholder meeting – July 15, 2019

Page 25: Monthly Stakeholder Meeting June 17, 2019...• Estrella TV SR 836 UPCOMING CONSTRUCTION ACTIVITIES 23 2019 FIU PARENT/CHILD BRIDGE ENGINEERING SUMMER CAMP 24 COMMUNITY OUTREACH PROJECT

786-280-0983

[email protected]

Contact:Oscar Gonzalez

www.i-395miami.com

THANK YOU!