28
More About Individual Term Projects

More About Individual Term Projects

  • Upload
    niran

  • View
    35

  • Download
    1

Embed Size (px)

DESCRIPTION

More About Individual Term Projects. Next Tuesday. Meet at Abrams Planetarium at the usual time. Aurora. A few words on Huygens. Titan – Saturn’s largest moon. First Detailed images of the surface. From 16.2 km up. From 8km up. Mosaic of descent images. *Deadline*. - PowerPoint PPT Presentation

Citation preview

Page 1: More About Individual Term Projects

More About Individual Term Projects

Page 2: More About Individual Term Projects

Next Tuesday

• Meet at Abrams Planetarium at the usual time

Page 3: More About Individual Term Projects

Aurora

Page 4: More About Individual Term Projects

A few words on Huygens

Page 5: More About Individual Term Projects

Titan – Saturn’s largest moon

Page 6: More About Individual Term Projects

First Detailed images of the surface

Page 7: More About Individual Term Projects

From 16.2 km up

Page 8: More About Individual Term Projects

From 8km up

Page 9: More About Individual Term Projects

Mosaic of descent images

Page 10: More About Individual Term Projects

*Deadline*

• By next Tuesday, I would like you each to turn in a one page description of your individual semester project

Page 11: More About Individual Term Projects

Sample Projects

• Moon position

• Photographing planet motions

• Observing a variable star

Page 12: More About Individual Term Projects

Moon Position Project

• What you need:– A chart of the night sky showing the

constellations visible at the time you are observing (Abrams sky calendar charts are good, but you may need more than the January chart)

Page 13: More About Individual Term Projects

Mark location of the moon with respect to the stars

Page 14: More About Individual Term Projects

In a notebook record:

• The date and time of each observation

• The phase of the moon (make a sketch)

• Do not let your observation be influenced by planetarium software or other predictions

Page 15: More About Individual Term Projects

Goal

• Do this on perhaps 10-15 nights during the semester

• Use your observations to determine(a) The sidereal period of the moon

(b) The synodic period of the moon

(c) Estimate the uncertainty of each period

And compare these with the “book” values

Page 16: More About Individual Term Projects

Periods

• Sidereal period: The “true” orbital period of the Moon. How long it takes the moon to return to the same location with respect to the stars

• Synodic period: How long it takes to return to the same phase; based upon the position of the Sun and Moon with respect to the earth

Page 17: More About Individual Term Projects

Planet Motion Project

• For this project, you will need a camera (most easily a digital camera) that can take time exposures of a few seconds duration

• For this project, it is OK to work as a team of two people

Page 18: More About Individual Term Projects

Step 1: Image the planet and the background stars (5 or 6 times in the

semester)• Saturn and/or Jupiter are most easily done this

semester

Page 19: More About Individual Term Projects

Step 2

• Measure the position of the planet on the image with respect to several stars

• Use the known right ascension and declination of the stars to determine the right ascension and declination of the planet on each date

• Estimate the uncertainty of your measured positions

Page 20: More About Individual Term Projects

Step 3

• Plot the changing position of the planet and compare your results with the predicted motion of the planet

Page 21: More About Individual Term Projects

Variable Star Project

• Two possible targets– Delta Cephei– Algol (easier for naked

eye observations from campus)

Page 22: More About Individual Term Projects

Delta Cephei Project

• Check out the “observing delta Cephei” tutorial at the AAVSO website:

http://hoa.aavso.org/observing.html

Following the steps outlined there,estimate the brightness of Delta Cephei on 12 or more nights during the semester

Calculate the “Julian Date” of each of your observations using the website

http://wwwmacho.mcmaster.ca/JAVA/JD.html

Page 23: More About Individual Term Projects

Make a light curve

• Estimate the pulsation period of Delta Cephei from your observations

• Calculate the “phase” of each of your measurements:Phase = Julian Date/period (Keep only the part

after the decimal point, i.e., if the phase comes out to be 5.43 keep just the 0.43)

Page 24: More About Individual Term Projects

Plot a light curve

• Plot the observed magnitude versus phase (your plot may not look this nice)

Page 25: More About Individual Term Projects

Algol

• Brighter than Delta Cephei and higher overhead in the evening (easier to observe without binoculars)

• Use your chart of Algol (you can download another from the AAVSO website if needed) to estimate the brightness of the star, recording date and time

Page 26: More About Individual Term Projects

• Measure the brightness of Algol on at least 10 nights• On at least one night when Algol is predicted to undergo

an eclipse, measure its brightness several times over the span of 3 or 4 hours around the time of minimum

– Predicted times of minimum can be obtained at the website

– http://skyandtelescope.com/observing/objects/variablestars/article_108_1.asp

Page 27: More About Individual Term Projects

Plot the light curve, as in the case of Delta Cephei

• In this case, you may use the known period of 2.8673 days if your observations do not let you determine the period independently. You will need to observe more than one minimum if you want to independently determine the period of Algol.

Page 28: More About Individual Term Projects

Other independent projects

• You may devise an independent project of your own, but you will have to check it out with me before you do it