MPER EMC1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley

MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley

Embed Size (px)

Citation preview

MPER EMC1 UCB, June 23, 2006

THEMIS

MISSION PRE-ENVIRONMENTAL REVIEW

Probe 2 EMC Test ResultsDavid Curtis

University of California - Berkeley

MPER EMC2 UCB, June 23, 2006

Probe 2 EMC Test Results

Launch Site Requirements• Test in Launch configuration with instruments off• RE02, RS03 per THEMIS ICD with Boeing

Self Compatibility Requirement• Test in plugs-out configuration with instruments on• RE02, RE04, RS03 per THEMIS Environmental Spec• Limit RE02 to science sensitivity band, 20Hz-1MHz, plus

the probe receiver band 1.7-2.3GHz• Limit RS03 to probe transmitter band. Also power up

transmitter to verify self-compatibility.

Test passed – see JPL test report 5132-06-035• Test report reviewed and approved by KSC

MPER EMC3 UCB, June 23, 2006

Probe 2 EMC Test Results

Launch Configuration RE02 Test Results• Well below spec 140-157udBV/m

• Dominated by EGSE• Tallest peak ~56dBuV/m – see next page

• Below spec at special frequencies:• 408-430MHz, ~30dBuV/m, spec = 38dBuV/m• 5.687 – 5.693GHz, ~54dBuV/m, spec = 95dBuV/m

MPER EMC4 UCB, June 23, 2006

Probe 2 EMC Test Results

MPER EMC5 UCB, June 23, 2006

Probe 2 EMC Test Results

Launch Configuration RS03 Test Results (20-40V/m)

• The only sensitivity was the IRU, which saw significant fluctuations at 80MHz, 160MHz, 300MHz, 900MHz, and 1.108GHz (see next page)

• At 1.108GHz found that IRU response returned to nominal at 7V/m.

• IRU functionality is not important on the launch pad. Further, these frequencies do not correspond to any known frequencies at the Cape

• JPL equipment could not test above 18GHz (spec was to 40GHz). 18GHz agreed to by KSC.

• Post test functional showed no performance degradation in any system

MPER EMC6 UCB, June 23, 2006

Probe 2 EMC Test Results

IRU RS03 sensitivity:

MPER EMC7 UCB, June 23, 2006

Probe 2 EMC Test Results

Operational Mode (plugs out) RE02 test:• 20Hz-1MHz test indistinguishable from facility background• Facility significantly above spec line below 100Hz, as

expected (below 14KHz measurement did not have a hard requirement)

• Receive band (1.77-2.3GHz) did not show anything above the test equipment noise floor, which was below the THEMIS receiver sensitivity level.

• Self compatibility tests indicate no problems in the probe receiver

MPER EMC8 UCB, June 23, 2006

Probe 2 EMC Test Results

Operational Mode RE02 test

MPER EMC9 UCB, June 23, 2006

Probe 2 EMC Test Results

Operational Mode (plugs out) RE04 test:

• See exceedances at harmonics of 60Hz, etc.• see same exceedances in ambient measurement

• Between chamber background peaks, easily meet THEMIS requirements, even at 0.5m from the probe.

MPER EMC10 UCB, June 23, 2006

Probe 2 EMC Test Results

MPER EMC11 UCB, June 23, 2006

Probe 2 EMC Test Results

Operational Mode (plugs out) RS03 test:

• Only interested in probe transmit band.• See no effect from either the probe transmitter or from

an external source at 30V/m

MPER EMC12 UCB, June 23, 2006

THEMIS PROBE

MISSION PRE-ENVIRONMENTAL REVIEW

EMC/POWERPeter Berg

University of California - Berkeley

MPER EMC13 UCB, June 23, 2006

EMC/BATTERY/SOLAR ARRAY

• CONDUCTED EMISSIONS TEST

• BATTERY TRENDING

• SOLAR ARRAY TEST

MPER EMC14 UCB, June 23, 2006

Conducted CM

Common Mode Conducted Emissions Through Umbilical

Probes BAU + IDPU + FGM + EFI + SCM + SST + ESA CM 28V

0

10

20

30

40

50

60

70

80

90

10.0E+0 100.0E+0 1.0E+3 10.0E+3 100.0E+3 1.0E+6 10.0E+6 100.0E+6

Frequency

dB

Probe 1

Probe 2

Probe 3

Probe 4

Probe 5

MPER EMC15 UCB, June 23, 2006

EMC SNIFF

MPER EMC16 UCB, June 23, 2006

Sample EMC Sniff

Probes 1- 5 BAU + IDPU + FGM + EFI + SCM + SST + ESA at J321 ESA HARNESS TO ESA

0

10

20

30

40

50

60

70

10.0E+0 100.0E+0 1.0E+3 10.0E+3 100.0E+3 1.0E+6 10.0E+6 100.0E+6

Frequency

dB

Probe 1

Probe 2

Probe 3

Probe 4

Probe 5

Probes 1- 5 BAU + IDPU + FGM + EFI + SCM + SST + ESA at J321 ESA HARNESS TO ESA

MPER EMC17 UCB, June 23, 2006

Battery Trending

Probe 1 2 3 4 5

Δ V -.42 -.42 -.42 -.39 -.33

Starting at 32 Volts, 850 mA was drawn from each battery for one hour.

MPER EMC18 UCB, June 23, 2006

SOLAR ARRAY TEST

1X

-1X 1Y -1Y 2X -2X 2Y -2Y 3X -3X 3Y -3Y 4X -4X 4Y -4Y

28.0 28.3 24.5 27.8 27.3 29.3 29.0 28.8 22.5 28.3 29.3 27.3 31.8 24.3 25.8 29.8

A pair of 500 Watt Halogen Lamps was Placed orthogonally centered to each of the four flanking solar arrays at approximately 2 feet. The increase in solar array current from ambient light by string in mA was noted, and averaged below.