Upload
robert-kennedy
View
19
Download
0
Embed Size (px)
Citation preview
Mr Robert Kennedy26 Foxstones crescent
BlackburnBB2 4TJ
Mobile No: 07875 490125 Telephone No: 01254 209006E-mail: [email protected]
Education Dunniker High School1973-19781979-1983 Kirkcaldy Technical Collage Scotland
Qualifications1983 City & Guilds Mechanical Fitting1978 G.C.S.E English Mathematics Technical Drawing Metal Work
Personal ProfileCompetent Mechanical Technician with over twenty years experience in installation of large Centrifugal, reciprocating compressors Gas & steam turbines through to testing and commissioning. I am extremely hardworking reliable honest good team player with references to validate my statements.
Career History03/2015 - 05/2015 Field Service Engineer DRESSER RAND GREAT BRITAIN Lindsy oilBearing and seal check of Dresser Rand steam turbine centrifugal compressor and turbo expander, replace as necessary.
01/2015 - 03/2015 Field Service Engineer DRESSER RAND EGYPT Abu Dhabi
Change out of DR200 power turbine, supervise local labour on dismantle and removal of DR 200, install new power turbine perform final alignments and commission.
8/2014 - 10/2014 Senior Mechanical GE THERMODYN GREAT BRITAIN Supervisor Offshore Golden Eagle
Supervise sub-contractors on final commissioning of five GE centrifugal compressors, adhering to company procedures, ensure safe working practices, method statements, point of work risk assessments, conduct job briefs and tool box talksSubmit detailed daily, weekly progress reports for project manager and client.
03/2014 – 07/2014 Field Service Engineer DRESSER RAND NIGERIA Nigeria
Supervise local labour on commissioning of Peter Brotherhood CR 130, CR 150 reciprocating compressors.
10/2013 - 12/2013 Field Service Engineer DRESSER RAND UAE Abu Dhabi
Overhaul of Dresser Rand centrifugal, Axial compressors and power turbines.
03/2013 - 08/2013 Field Service Engineer DRESSER RAND UK GREAT BRITAIN Offshore Claymore
Major overhaul of train B Dresser Rand IP, LP, and HP centrifugal compressors.Main bearing and labyrinth seal checks, replace as necesarry.
03/2012- 03/2013 Field Service Engineer SULZER PUMP UK LTD NIGERIA
Overhaul Sulzer multistage pumps onsite and workshop.
10/2011 - 01/2012 Mechanical Engineer GE THERMODYN Tchibouela CONGO
Supervision major overhaul, of second PAC4 reciprocating compressor.
08/2011 Mechanical Engineer GE THERMODYN Manchester
GREAT BRITAIN
Generator and 50MW steam turbine installation.
07/2011 Mechanical Engineer GE THERMODYNCalasparra
SPAIN
2X Generator and 16MW steam turbine installation.
07/2011 Mechanical Engineer GE THERMODYN Manchester
GREAT BRITAIN
Check Civil works.
05/2011 Mechanical Engineer GE THERMODYNCalasparra
SPAIN
2X Generator and 16MW steam turbine's installation, Equipment installation on solid concrete, checking position, heights and levels.
01/2011 Mechanical Engineer GE THERMODYN Tchibouela
CONGO
Supervision of major overhaul, of PAC4 reciprocating compressor.
12/2010 Mechanical Engineer GE THERMODYN Fatima
PAKISTAN
Turbines/compressor instruments installation and turbine control, field rebalance of rotor shaft.
11/2010 Mechanical Engineer GE THERMODYN Elgin
SCOTLAND
One call intervention for replacement of DGS on a RC6-3B CC. Mechanical reference 8K3110A booster compressor.
10/2010 Mechanical Engineer GE THERMODYN AGD2
UAE
Mechanical work on steam turbines.
06/2010 - 08/2010 Mechanical Engineer VON ROLL INOVA GREAT BRITAIN
Sub-assembly installation: Steam turbine installation, generator installation, Machines levelling and Machines alignment.
04/2009 - 05/2010 Service Engineer Burckhardt Compression UK LTD
GREAT BRITAIN
Installation commissioning and service of Burckhardt reciprocating compressors , including K and D type labyrinth oil free piston compressors, process gas compressors and hyper compressors, throughout the UK and abroad.
01/1979 - 04/2009 Mechanical Technician, Field service engineer, Senior mechanical technician, Mechanical supervisor, Change Hand Mechanical Technician
Various Companies World Wide
Apprentice mechanical fitter
Service and repair subsea valves worldwide, reporting to clients on site submitting detailed reports. Install and service small turbines throughout Europe. Outages on AEI HP, IP, LP steam turbines, to ensure safe working practices, method statements, point of work risk assessments, conduct job briefs and tool box talks. Major overhaul of Dresser Rand power turbine, new rotor, bearings and gas seals. Rotor change, oil seals & journal bearings changed on HP Dresser Clark centrifugal compressor Oil seals journal bearings changed on LP Dresser Clark centrifugal compressor. Factory trained on Sulzer multi stage pumps complete assembly through to testing. Maintenance & Major overhauls including Re grouts as necessary for electric driven Dresser Rand BDC reciprocating compressors, Ingersoll Rand twelve cylinders four stroke gas engines, compressors. Cooper Bessemer eight, twelve cylinder two stroke gas engine compressors, hot gas path and major overhauls on GE frame 5 Gas Turbines, working in desert conditions in the Amal V12 field adhering to tight schedules, whilst creating minimal down time.
Training
BOSIETH2SCCNSG Contractor Safety PassportHydra tight Assembling Tightening Bolted Connections
MSTSPPortable Tower ScaffoldingMISTCompressed Air Emergency Breathing System
Offshore Medical Vantage No 0824112