20
MRC SEA OF HYDROPOWER ON MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM THE MEKONG MAINSTREAM LAO PDR LAO PDR Hatsady SYSOULATH Hatsady SYSOULATH Acting Director General Acting Director General Department of Electricity Department of Electricity Ministry of Energy and Mines, Lao Ministry of Energy and Mines, Lao PDR PDR Vientiane, 8 July 2009 Vientiane, 8 July 2009

MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

Embed Size (px)

Citation preview

Page 1: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

MRC SEA OF HYDROPOWER MRC SEA OF HYDROPOWER ON THE MEKONG ON THE MEKONG

MAINSTREAM LAO PDRMAINSTREAM LAO PDR

Hatsady SYSOULATHHatsady SYSOULATHActing Director GeneralActing Director General

Department of ElectricityDepartment of ElectricityMinistry of Energy and Mines, Lao PDRMinistry of Energy and Mines, Lao PDR

Vientiane, 8 July 2009Vientiane, 8 July 2009

Page 2: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

BACKGROUND OF LAO PDRBACKGROUND OF LAO PDR• Area of 236,800 km sq;

• 16 Provinces + Capital and 139 districts;

• Population of 5.8 million (2007);

• GDP of USD 4.1 billion (2007);

• GDP per Capita of USD 701 (2007);

• Mountainous area with major tributaries of the Mekong River covering 35% of total Mekong River basin.

• Relatively high annual rainfall.

• Hydropower potential: 23,000 MW

• Existing installed capacity of 672 MW (3%)

• Produced energy of 3,500 GWh/Y

• Produced energy per capita of 700 kWh/Y

• Exported energy per capita of 320 kWh/Y

Page 3: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

HISTORY OF POWER SECTOR DEVELOPMENTHISTORY OF POWER SECTOR DEVELOPMENT

• Memorandum of Understanding on the power exchange program was signed with the Royal Thai Government in 1993 and 1996 under which 3,000 MW is to be supplied to Thailand and subsequently increased 7,000 MW is agreed;

• In 1998 and 2006 MOUs were signed with the Government of Vietnam for 3000 MW and subsequently 5000 MW is agreed;

• In 1999 Agreement on Cooperation in Power Sector was signed with Cambodia;

• Power Sector Strategy is being developed and updated from time to time;

• Power sector opened to private foreign direct investments;

• Legal framework has been improved from time to time to meet international financing requirements.

Page 4: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

POWER SECTOR POLICYPOWER SECTOR POLICY

• Maintain and expand affordable, reliable and sustainable electricity supply to promote economic and social development;

• Promote power exports as well as domestic power supply to earn revenues to meet Government development objectives with particular emphasis on poverty eradication;

• Develop and enhance the legal and regulatory framework to facilitate power sector development by either public, private or public private partnership;

• Gain capacity building through international technical know-how and expertise;

• Ensure accountability and transparency of environmental and social impacts and thereby achieve sustainable development

Page 5: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

OBJECTIVES OF POWER SECTOR OBJECTIVES OF POWER SECTOR DEVELOPMENTDEVELOPMENT

• Provide a source of foreign exchange to fund economic and social development and alleviate poverty;

• Meet the commitments under intergovernmental MOUs and Agreements with Thailand, Vietnam and others;

• Extend rural electrification to promote better socio-economic development and reach the government target of 70% and 90% by year 2010 and 2020 respectively;

• Integrate power sector and maintain its economic development as a whole with international communities trough its power exchange programs and foreign direct investment.

Page 6: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

OWNERSHIP OF POWER GENERATIONOWNERSHIP OF POWER GENERATION

öÁ¹ ì Ȥ°½ì ò© à ¯ó 2004

44.6%

52.5%

2.9%

³ ³ ì ² ¾¡ Àº ¡ ½§ö êûº¤«†

² ¾¡ Àº ¡ ½§ö ³ ³ ì

êºÉ¤«†

EDL IPP PROVINCES

IPP EDL

PROVINCES

The country’s total installed Capacity: 690 MW:

EdL 307.5 MW, IPP: 362.5 MW, Provincial: 20 MW

Page 7: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

POWER LOAD FORECASTPOWER LOAD FORECAST

-500.00

-

500.00

1,000.00

1,500.00

2,000.00

2,500.00

3,000.00

MW

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020YEARS

Capable supply (MW)Domestic demand (MW)Balance (MW)

Page 8: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

POWER LOAD FORECAST (CONT’)POWER LOAD FORECAST (CONT’)

Page 9: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

DEVELOPMENT STATUSDEVELOPMENT STATUS

68 Projects with estimated installed capacity of 22,069 MW:

Projects at Feasibility Study stages/with Memorandum of

Understanding (MOU): 43 Projects with estimated installed

capacity of 12,373.5 MW

Projects at Preparation stage/with Project Development

Agreement (PDA): 17 projects with estimated installed capacity of

7,245 MW

Projects under Construction / with Concession Agreement (CA):

8 Projects with installed capacity of 2,450.6 MW

Page 10: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

• For electric generation and consumption, hydropower type comprises of 99.8% of total, the rest is diesel generation and solar photovoltaic sets.

• Electrification ratio is estimated at 60% in 2008.

DEVELOPMENT STATUS (CONT’)DEVELOPMENT STATUS (CONT’)

Page 11: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

GREATER MEKONG GREATER MEKONG SUBREGIONAL POWER GRIDSUBREGIONAL POWER GRID

Page 12: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

LIST OF DAMS ON THE MEKONG MAINSTREAM (LAOS)LIST OF DAMS ON THE MEKONG MAINSTREAM (LAOS)

No. Name MW

1 Pak Beng 1,230

2 Luang Prabang

1,410

3 Xayaboury 1,260

4 Pak Lay 1,320

5 Sanakham 570

6 Ban Khum 2,330

7 Lat Seua 800

8 Dong Sahong 240

TOTAL 9,160

Page 13: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

SANAKHAM SANAKHAM PROJECTPROJECT

Salient features: • MOU signed: 12/11/2007 (DATANG)• Phase: Feasibility Study• Installed capacity: 570 MW• Full supply level: 215 m• Maximum Head: 22 m• Dam Type: Run-of-RiverKey Environment and Social issues:• Displacement of people and loss of property (20

villages, 8,850 people)• Impact on Thailand

Page 14: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

PAK LAY PROJECTPAK LAY PROJECT

Salient features: • MOU signed: 6/11/2007 (CEIC/Sinohydro)• Phase: Feasibility Study• Installed capacity: 1320 MW• Full supply level: 240 m• Maximum Head: 25 m• Dam Type: Run-of-RiverKey Environment and Social issues:• Displacement of people and loss of property (27

villages, 18,000 people)• Biodiversity and impact on protected areas• Cultural Impact

Page 15: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

XAYABOURY PROJECTXAYABOURY PROJECT

Salient features: • MOU signed: 5/4/2007 (Ch. Kanchang)• Phase: Feasibility Study• Installed capacity: 1260 MW• Full supply level: 275 m• Maximum Head: 35 m• Dam Type: Run-of-RiverKey Environment and Social issues:• Displacement of people and loss of property (29

villages, 8,690 people)• Biodiversity and impact on protected areas• Cultural Impact

Page 16: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

LUANG PRABANG PROJECTLUANG PRABANG PROJECT

Salient features: • MOU signed: 13/10/2007 (Petrovietnam)• Phase: Feasibility Study• Installed capacity: 1410 MW• Full supply level: 310 m• Maximum Head: 32 m• Dam Type: Run-of-RiverKey Environment and Social issues:• Displacement of people and loss of property (3,000

households, 17,700 people)• Impact on tourist sites• Cultural heritage and Archealogy impacts

Page 17: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

PAK BENG PROJECTPAK BENG PROJECTSalient features: • MOU signed: 29/8/2007 (DATANG)• Phase: Feasibility Study• Installed capacity: 1230 MW• Full supply level: 345 m• Maximum Head: 35 m• Dam Type: Run-of-RiverKey Environment and Social issues:• Displacement of people and loss of property ( 28 villages, 6,700

people)• Impact on Avifauna (Migration of bird areas)• Impact on Thailand sites: Flooding bank of 140 KM (Chieng Sen)(Mekong border = 90 KM upstream the Pak Beng Dam site)

Page 18: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

PROJECTS IN THE SOUTHPROJECTS IN THE SOUTHSalient features: 1. Done Sahong:• MOU signed: 23/3/2006 (Mega First)• Phase: Feasibility Study• Installed capacity: 360 MW• Dam Type: Run-of-River2. Lat Seua:• MOU signed: 2/4/2008 (CEWA)• Phase: Feasibility Study• Installed capacity: 800 MW• Dam Type: Run-of-River3. Ban Khum:• MOU signed: 25/3/2008 (Italian Thai)• Phase: Feasibility Study• Installed capacity: 2330 MW• Dam Type: Run-of-River

Page 19: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

CHALLENGESCHALLENGES

1. GOL Target:– 70% Households to be electrified by 2010;– 90% Households to be electrified by 2020;

2. Generation:– Hydro Power source– Renewable Energy source– Other sources

3. Power Grid Development:– National Grid– IPP Grid

4. Mekong Mainstream Development:– MRC Rule– Cascade (Study)– EIAS indepth study and detailed cumulative impact

assessment (CIA)

Page 20: MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR Hatsady SYSOULATH Acting Director General Department of Electricity Ministry of Energy and Mines,

THANK YOUTHANK YOU

COMMENTS-QUESTIONS ?COMMENTS-QUESTIONS ?