7
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN Sr. No. Item Details 1 Name of the Project SHAKTI BRICKS Survey No.529,543,593,594,595 Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad. 2 Location / site (GPS Co- ordinates): 3 Size of the Mining Lease (Hectare): 06-18-00 Ha 4 Capacity of Mining Lease (TPA): 33847 MT/Annual 5 Period of Mining Lease: 07 Years 6 Expected cost of the Project: 19 Lacs 7 Contact Information: SHAKTI BRICKS Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad.

M/s. SHAKTI BRICKS - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN Sr. No. Item Details

  • Upload
    buidiep

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

Sr. No. Item Details

1 Name of the Project SHAKTI BRICKS Survey No.529,543,593,594,595 Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad.

2 Location / site (GPS Co-ordinates):

3 Size of the Mining Lease (Hectare):

06-18-00 Ha

4 Capacity of Mining Lease (TPA): 33847 MT/Annual 5 Period of Mining Lease: 07 Years 6 Expected cost of the Project: 19 Lacs

7 Contact Information: SHAKTI BRICKS Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad.

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the industry, Government, Regulating agencies like Pollution Control Board working in the region and more importantly the population of the area need to extend their co-operation and contribution.

• Mitigation measures for each of the activities causing the environmental impact.

• Monitoring plans for checking activities and environmental parameters and monitoring responsibilities.

• Role responsibilities and resource allocation for monitoring.

• Following sections describes the environment management plan proposed for site clearing and

Mining phases.

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

MITIGATION MEASURES:- • Each of the activities during production phase is critically Reviewed for suggestion of mitigation measures. Based on This the Table 1 to 6 gives the mitigation measures for the Activities considered being causing significant Environmental impacts during production phase of every Year.

Table: - 1 Environment Management Plan:- Activity Environmental

Impacts Mitigation Remarks

Mining process

Air Water spraying by automatic sprinkle to control micro particles of mineral and dust. Ensure uses of personal protective equipments. (PPE's)

Implementation responsibility: Project

Proponent

Water No waste water management. Install proper facilities to prevent rain / storm water.

Land Ensure uses of personal protective equipments (PPE's). Manage proper storage of quarry solid wastes.

Noise Ensure proper maintenance of machinery to reduce noise level

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

Table: - 2 Environment Management Plan:-

Activity Environmental Impacts

Mitigation Remarks

Storage of all the Waste materials and products.

Air Water Land

To be stored in accordance with the rules and regulation of the safety Department. Separate storage area for products. Install proper facilities to prevent rain / storm water contamination during the storage of solid prepared products. Trained / approved transports will be given work for the transportation of the products.

Implementation responsibility:

Project Proponent

Land Well maintained vehicles will be used. Metalled Road for vehicle movement. Top soil will be conserved and be utilized for greenbelt on area.

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN Table: - 3 Environment Management Plan:-Other Facilities:-

Activity Environmental

Impacts Mitigation Remarks

Toilets Water Ensure proper sewage disposal.

Implementation responsibility:

Project Proponent

Development and maintenance of

green belt

Air. Land

Ensure development and maintenance of proper green belt as proposed.

Direct / Indirect Employment

Socio- economic issue

Continue policy of local employment according to the skill and availability

Environmental Monitoring Plan:- Environment monitoring plan is given in table 5 as follows: Table No. 4

Sr.No. Activity Schedule Air Pollution Monitoring 1 Ambient air monitoring of parameters specified

by GPCB in their air consents from time to time within the Proposed premises

Once every Calendar Year

Water Pollution Monitoring 1 No waste water Produced N.A. Solid Waste Generation Monitoring / Record Keeping 1 No Solid Waste Generation. N.A.

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

Expenditure on Environmental Matters:- The following table gives the expenditure to be incurred by Proponent on environmental matters. Table No. 5

Sr. No.

Description Approximate Recurring cost per annum (Rs. In lacs)

Approximate Capital Cost (Rs. In Lacs)

1 Air pollution control

0.45 0.60

2 Water pollution control

0.10 ---

3 Environment monitoring and management

0.50 0.60

4 Solid and hazardous waste management

0.10 --

5 Noise pollution control

0.10 0.25

6 Occupational health

1.00 1.10

7 Green belt

1.00 1.10

Total 3.25 3.60

M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN

Table No. 6: vegetation

Name of the trees

Sensitive / tolerant to

air pollution

Height No. of Threes to be planted

Amount to be Spent

Neem Tolerant 10-15 m 30

Vad Tolerant 10-15 m 20

Peepal Tolerant 10-15 m 30

Local species Tolerant 5-10 m 20

Total 100 1.0 Lacs