M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
Sr. No. Item Details
1 Name of the Project SHAKTI BRICKS Survey No.529,543,593,594,595 Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad.
2 Location / site (GPS Co-ordinates):
3 Size of the Mining Lease (Hectare):
06-18-00 Ha
4 Capacity of Mining Lease (TPA): 33847 MT/Annual 5 Period of Mining Lease: 07 Years 6 Expected cost of the Project: 19 Lacs
7 Contact Information: SHAKTI BRICKS Vill: Chiyada, Ta: Bavla, Dist: Ahemdabad.
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the industry, Government, Regulating agencies like Pollution Control Board working in the region and more importantly the population of the area need to extend their co-operation and contribution.
• Mitigation measures for each of the activities causing the environmental impact.
• Monitoring plans for checking activities and environmental parameters and monitoring responsibilities.
• Role responsibilities and resource allocation for monitoring.
• Following sections describes the environment management plan proposed for site clearing and
Mining phases.
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
MITIGATION MEASURES:- • Each of the activities during production phase is critically Reviewed for suggestion of mitigation measures. Based on This the Table 1 to 6 gives the mitigation measures for the Activities considered being causing significant Environmental impacts during production phase of every Year.
Table: - 1 Environment Management Plan:- Activity Environmental
Impacts Mitigation Remarks
Mining process
Air Water spraying by automatic sprinkle to control micro particles of mineral and dust. Ensure uses of personal protective equipments. (PPE's)
Implementation responsibility: Project
Proponent
Water No waste water management. Install proper facilities to prevent rain / storm water.
Land Ensure uses of personal protective equipments (PPE's). Manage proper storage of quarry solid wastes.
Noise Ensure proper maintenance of machinery to reduce noise level
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
Table: - 2 Environment Management Plan:-
Activity Environmental Impacts
Mitigation Remarks
Storage of all the Waste materials and products.
Air Water Land
To be stored in accordance with the rules and regulation of the safety Department. Separate storage area for products. Install proper facilities to prevent rain / storm water contamination during the storage of solid prepared products. Trained / approved transports will be given work for the transportation of the products.
Implementation responsibility:
Project Proponent
Land Well maintained vehicles will be used. Metalled Road for vehicle movement. Top soil will be conserved and be utilized for greenbelt on area.
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN Table: - 3 Environment Management Plan:-Other Facilities:-
Activity Environmental
Impacts Mitigation Remarks
Toilets Water Ensure proper sewage disposal.
Implementation responsibility:
Project Proponent
Development and maintenance of
green belt
Air. Land
Ensure development and maintenance of proper green belt as proposed.
Direct / Indirect Employment
Socio- economic issue
Continue policy of local employment according to the skill and availability
Environmental Monitoring Plan:- Environment monitoring plan is given in table 5 as follows: Table No. 4
Sr.No. Activity Schedule Air Pollution Monitoring 1 Ambient air monitoring of parameters specified
by GPCB in their air consents from time to time within the Proposed premises
Once every Calendar Year
Water Pollution Monitoring 1 No waste water Produced N.A. Solid Waste Generation Monitoring / Record Keeping 1 No Solid Waste Generation. N.A.
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
Expenditure on Environmental Matters:- The following table gives the expenditure to be incurred by Proponent on environmental matters. Table No. 5
Sr. No.
Description Approximate Recurring cost per annum (Rs. In lacs)
Approximate Capital Cost (Rs. In Lacs)
1 Air pollution control
0.45 0.60
2 Water pollution control
0.10 ---
3 Environment monitoring and management
0.50 0.60
4 Solid and hazardous waste management
0.10 --
5 Noise pollution control
0.10 0.25
6 Occupational health
1.00 1.10
7 Green belt
1.00 1.10
Total 3.25 3.60
M/s. SHAKTI BRICKS ENVIRONMENTAL MANAGEMENT PLAN
Table No. 6: vegetation
Name of the trees
Sensitive / tolerant to
air pollution
Height No. of Threes to be planted
Amount to be Spent
Neem Tolerant 10-15 m 30
Vad Tolerant 10-15 m 20
Peepal Tolerant 10-15 m 30
Local species Tolerant 5-10 m 20
Total 100 1.0 Lacs