MultiGrid Support System Overview

MultiGrid Overview 2012

Embed Size (px)

Citation preview

Page 1: MultiGrid Overview 2012

MultiGrid Support System Overview

Page 2: MultiGrid Overview 2012

5

Presentation Agenda• Safety moment• Company overview• MultiGrid structural support system

• Components and adjustability• Cold/hot work mounting options• Self-lock anti-vibration fasteners• Testing• Fabrication and delivery• Demo – how to build a trapeze

• Past projects• Questions

Multidiscipline Support System

Page 3: MultiGrid Overview 2012

6

Safety Moment – Nema VE 2-2006• Do not use a cable tray as a walkway, ladder, or

support for people; cable tray is a mechanical support system for cables and raceways. Using cable tray as walkways can cause personal injury and also damage cable tray and installed cables.

Multidiscipline Support System

Page 4: MultiGrid Overview 2012

Oglaend System

MultiGrid™

• Founded in 1977 • Located in Kleppe 30 km south of Stavanger in Norway• 250 employees globally• $110M in revenue• Operating in 30 countries and serve customers in 140

Contact Details

Mark Edgar, P.E.Engineering [email protected]

http://www.oglaend-system.com/

Page 5: MultiGrid Overview 2012

10

Direct companies w/stock: Agents / Distributor w/stock: Agents / Distributor :

NORWAY AUSTRALIA INDONESIA THAILAND

UNITED STATES (Houston) U.S.A. FINLAND VIETNAM

SWEDEN BRUNEI ABU DABI ITALY

ENGLAND SCOTLAND ISLAND MALAYSIA

HOLLAND CANADA BRASIL RUSSIA

SINGAPORE DENMARK QATAR

KOREA

MALAYSIA

RUSSIA

MIDDLE EAST

Page 6: MultiGrid Overview 2012

12Multi-discipline support system

Oglaend System Core O&G Products

• Ladder Cable Tray (OE Series)• Channel Cable Tray (SPB Series)• Multi-Discipline Structural Supports (MultiGrid)• Uno Strut• Racks and Supports• Etin and Inko Tubing Clamps• Smart Cleats

• Materials – SS316L, HDG, FRP

Page 7: MultiGrid Overview 2012

74SIMPLY THE BEST!

Why MultiGrid™?

• Full adjustability• Schedule savings up to 60%• Reduce weight by >50%• Reduction in total system cost by 30%• Hot work and cold work options

Page 8: MultiGrid Overview 2012

75SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

MultiGrid™ Starter Brackets

4 tonnes

8 tonnes

8 tonnes

>10 tonnes8 tonnes

2 tonnes

1 tonne

Page 9: MultiGrid Overview 2012

76SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

MultiGrid™ Solution – How to get started

Page 10: MultiGrid Overview 2012

77SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

TYPE WeightKg/m

LoadCapacity (DW=tonne)SS Material

Mekano 50-1t=1,5mm

1,26 4

Mekano 100-1t=1,5mm

1,72 5,5

Mekano 50-2t=1,5mm

1,72 6

Mekano 60-2t=6mm

5,19 > 10

Mekano 50-2Tt=1.5 & 2.0 mm

1,97 8

Mekano 100-2Tt=2.0, 2.5, & 3.0 mm

4,96 > 10

Mekano 100-3t=2,5mm

6,33 >10

Mekano 100-4t=3 or 5mm

8,3-13,6 >10

MultiGrid™ Mekano Channels

Page 11: MultiGrid Overview 2012

78SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

Mekano News : Triangle - Increased Torsion Capacity

Page 12: MultiGrid Overview 2012

79SIMPLY THE BEST!

Carbon Steel Material Strength

Other Channels Base Plates, 100-4, 60-2

EN 10025-S235JRG2 EN 10025-S355J2Minimum Yield Strength

(MYS in MPa) 235 355Minimum Yield Strength

(MYS in ksi) 34 51.5

MultiGrid™ Øglænd System Multi-Discipline Support System

Page 13: MultiGrid Overview 2012

80SIMPLY THE BEST!

SS316L Material Strength

AISI 316LMinimum Yield Strength

(MYS in MPa) 290Minimum Yield Strength

(MYS in ksi) 42

MultiGrid™ Øglænd System Multi-Discipline Support System

Page 14: MultiGrid Overview 2012

Self Lock System

Metric Class Material Tensile Strength Yield Strength

N/mm2 psi N/mm2 psi A4-80 316 Stainless 800 116,000 600 87,000

Page 15: MultiGrid Overview 2012

Dealing with vibration: Standard Solution

The threaded rod is allowed to move inside the nut.

When exposed to vibrations the screw will move according to this arrow

Page 16: MultiGrid Overview 2012

Dealing with vibration: Self lock flange nuts

No room for movement

Page 17: MultiGrid Overview 2012

Distribution of stress:

Standard solution

The pink lines indicates the contact points between the treaded rod and the nut. When the bolt is fixed the stress will be situated in this contact area. The contact (steel against steel) is first made in area 1. The force on area 1 is therefore much larger than the force in area 2 and decreasing the further down the rod you get. The picture to the far right shows how the stress is distributed.

1

2

Page 18: MultiGrid Overview 2012

Distribution of stress: Self lock solution

When you fix a nut the stress will be highest on the top thread on the rod like I showed on the standard solution. However, in the case of the self lock the area where the nut meets the thread is very limited. Because the edge on the thread is weak it will bend off a little when using the required torque. Because of this the stress is allowed to “move” downwards resulting in the stress being equally distributed.

The edge on the thread will bend a little when required

torque is used to fix

Page 19: MultiGrid Overview 2012

Friction in the flange nut: Self lock solution

The design of the flange nut adds to the friction. A simple exercise to illustrate this is to take a flange nut and test it on paper.

First: Try to twist around the nut with this side downwards against the paper.

Then try to do the same with this side

facing down.

The exercise makes it quite obvious that the friction is very different on the side that is supposed to face the steel. This makes it very much harder to release a self lock nut compared to the standard solution, even when using washers.

Page 20: MultiGrid Overview 2012

93SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

SELF LOCK FLANGE NUTS A4-80 SS

A unique pretension thread locking system resists the effect of dynamic load and vibration.A unique pretension thread locking system resists the effect of dynamic load and vibration.

M10 Bolt = 1 tonneM12 Bolt = 1,5 tonneM16 Bolt =2,0 tonne

Page 21: MultiGrid Overview 2012

94SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

MultiGrid™

EI & T (Electro, Instrument

& Telecom…)

Adriatic LNG for ExxonMobil

Is the system adjustable??

Page 22: MultiGrid Overview 2012

99SIMPLY THE BEST!MultiGrid™ Øglænd System Multi-Discipline Support System

Piping

Page 23: MultiGrid Overview 2012

Welded vs. Oglaend

Double Tier Trapeze, Outdoor Loading for 900 mm Tray (4.82 KN/1084 lbf Fy and 1.45 KN/326 lbfFx)

Welded Oglaend

Dim 1 (width mm) 1000 Dim 1 (width mm) 1000

Dim 2 (height mm) 1000 Dim 2 (height mm) 1000

Total Length (m) 4.0 Total Length (m) 4.0

EA100X10 Weight (kg/m) 15.0 CH100‐2T3 Weight (kg/m) 6.0

Support Weight (kg) 60.0 Brackets, etc. Weight (kg) 4.4

Support Weight (kg) 28.4

Oglaend weight reduction (kg) 31.6

Oglaend weight reduction (%) 52.7%

Page 24: MultiGrid Overview 2012

CASE 1 COST COMPARISONWELDED ANGLE VS. OGLAEND MULTIGRID

1)  Light Single Tier Trapeze Weight Comparison ‐ 1 m Height x 1 m WidthWelded Oglaend

Material Type 3" x 3" x 3/8" Angle  CH50‐2T2 & CH100‐1Labor Cost per Hour $30.00 $30.00Labor Hours per Support 9.8 2.0Number Hours per Ton 277 235.6Total Labor Cost per Ton $8,310.00 $7,068.00Material Cost per Support $29.16 $117.00Supports per Ton 28.2 117.8Total Cost per Ton $9,132.31 $20,850.60Total Cost per Support $323.84 $177.00Number of Supports atWelded Cost per Ton 28.2 51.6

Oglaend Cost Reduction per Support $146.84Oglaend Cost Reduction per Support (%) 45.3%Additional Number of Oglaend Supports at  23.4    Welded Total Cost per Ton

Oglaend weight reduction (kg) 24.43Oglaend weight reduction (%) 76.0%

Page 25: MultiGrid Overview 2012

137

Testing

Multidiscipline Support System

• Norway facility – new test lab• Calculations –

• Structures – contracted structural engineering firm to develop cross sectional properties

• Bolts – contracted fastening research company• Software – STAAD.Pro, SAP2000, and SACS (new)

Page 26: MultiGrid Overview 2012

138

Fabrication and Delivery

Multidiscipline Support System

• Fabrication in two locations – Norway and Malaysia• Inventory in Houston• Large project delivery – 8 to 10 weeks

Page 27: MultiGrid Overview 2012

142Multi-discipline support system

Oglaend System have commissioned Aveva to produce our Cable Tray, Ladder and Supports catalogue within their PDMS format. This has been done to ensure that our equipment codes are produced in a way that is fully compatible with PDMS and that Aveva will fully support the software with their existing client base.

The Tray and Ladder Catalogue item can be downloaded in a simple file format and loaded directly into the PDMS catalogue database.

Page 28: MultiGrid Overview 2012

143Multi-discipline support system

Intergraph PDS is a comprehensive, intelligent computer-aided design/engineering (CAD/CAE) application.

Production-driven, PDS delivers the best design possible - and does it more efficiently to reduce the total installed cost of the project. It enhances value and minimizes risk while preserving the value of data.

Intergraph PDS provides seamless integration with the design tools and catalogues of Oglaend System.

Page 29: MultiGrid Overview 2012

196Simply the Best!Multidiscipline Support System

Page 30: MultiGrid Overview 2012

197Simply the Best!Multidiscipline Support System

Page 31: MultiGrid Overview 2012

199Simply the Best!

Bayu-Undan Offshore Platform■ Timor Sea, Australia

■ Year of delivery: 2001-2003

Project BriefTYPE OF FACILITY:Offshore Platform

Bayu-Undan is a huge gas field in the Timor Sea offshore Australia, operated by ConocoPhillips Petroleum.

The field is developed by 3 jacket platforms. On each platform the topside deck weighs app. 30 000 tonnes.

Oglaend System have delivered about 17 500 metres of OE-ladders and approximately 55 000 metres of SPB RF-40 cable trays and channels.

All material in stainless steel, AISI 316L.

System Material Quality Quantity

MultiGrid/Mekano Stainless Steel

Ladder Type OE Stainless Steel 17 500 mtr

Tray Type SPB RF-40

Stainless Steel 55 000 mtr

Owner: Engineering: Construction::Hyundai Heavy Industries

Page 32: MultiGrid Overview 2012

200Simply the Best!Multidiscipline Support System

Page 33: MultiGrid Overview 2012

202Simply the Best!Multidiscipline Support System

MultiGrid Summary

• Oglaend offers full product range – supports to tray and accessories

• Save 30% of your total system cost• Reduce your installation time up to 60%• Reach >50% weight reduction• Improve HS&E performance• Reduced weight and time = reduced cost

Page 34: MultiGrid Overview 2012

204Simply the Best!Multidiscipline Support System

Catalogs

• Paper copies (older version)• http://www.oglaend-system.com/ - Go to

downloads and then supports

Standard Details

• PDF and AutoCAD

Page 35: MultiGrid Overview 2012

208Simply the Best!Multidiscipline Support System

Questions?US Contact Details

Mark Edgar, P.E.Engineering [email protected]

Graeme [email protected]

Channing DurrenbergerProject Sales [email protected]

http://www.oglaend-system.com/