19
1 Musselwhite Mine Location and Site Video

Musselwhite Mine - Thunder Bay Chamber of Commercetbchamber.ca/wp-content/uploads/GC-presentation-may30-18.pdf · Ontario, Canada P&P gold reserves. 1. 1.9 moz M&I gold resources

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    Musselwhite Mine

    Location and Site Video

    https://www.youtube.com/watch?v=-y5G0BaxtZw

  • 2

    Currently 540 active full time employees, 300 contractors

    • Currently 255 full time employees from Thunder Bay (~50%)

    • ~90% of all hires in the last 12 months from or re-located to Thunder Bay

    • Local hire policy in place June 2017• Operational impacts – 5-10 year plan

    TOGETHER, CREATING SUSTAINABLE VALUE

    2

    Thunder Bay Our Home Video

    Musselwhite – Making Thunder Bay Our Home

    https://vimeo.com/234837072

  • 3

    Materials Handling Project on schedule and within budget• Ore tonnage movement restricted to 3,600 tonnes per

    day until winze online, expanding to 4,300 tonnes per day thereafter

    Investing in technology to improve efficiencies and further reduce costs• Tele-remote mucking, dispatch, autonomous drilling

    Consistently replacing mine reserves and discovering new mineralization• Cost of discovery under $25/oz

    • Potential for resource growth

    Ownership 100%

    Location Ontario, Canada

    P&P gold reserves1 1.9 moz

    M&I gold resources1 0.3 moz

    Inferred gold resources1 1.2 moz

    2018 exploration budget2 $10 M

    2018 capital budget2 $75 M

    265kozProduction22018

    $775/ozAISC22018

    1 As of June 30, 2017. Refer to the reserve and resource statement on Goldcorp’s website for more details2 Initial guidance as of January 2018. Figures are +/- 5%

  • 4

    Musselwhite Mine Long Section

    (~10km Meters via Ramp)

  • 5

    1170 mL RB/Grizzly Access

    Shaft Leg1 O/P

    O/P

    Shaft Bottom

    Sheave Deck & Hoist RoomHoist Room Access

    Existing 280 Expl. Ramp

    Truck Loading Station

    1220/1245 Main Ramp In progress

    657/WEL Access

    Mucking Level for

    Leg 1 (280/657L)

    WEL Truck Dump

    Material Handling Project - Existing Ramps & MH DevelopmentIsometric View (Apr 22, 2017)

    N

    1170 mL

    MH – Planned Development

    MH – Completed Development

    Non MH - Existing Development

    Skip Change Drift

    1245 mL

    LDG Pocket

    Shaft Leg2

  • 6

    MHP Construction Update

  • 7

    280 Hoist room RB90 drill set up

  • 8

    657 Raise bore reamer install

  • 9

    MHP Construction Update

    Reamer BT on 280

  • 10

    RB90-1 breakthrough

  • 11

    Installation of Galloway in shaft

  • 12

    View look out to access to Hoist room

  • 13

    MHP Construction UpdateBuilding electrical trenches Hoist foundations

  • 14

    View hoist pit from the Electrical house

  • 15

    Installing Overhead crane beams in hoist room

  • 16

    Musselwhite Opportunities for Value Creation

    • Efficiencies in material movement through improved communication and traffic flow

    • Increased development, stope drilling and trucking capabilities

    • Drive compliance to plan through lower dilution

    • Exploring partnerships with Sandvik for MX 650

    • Increasing lateral development rates will unlock value

    • Large land package with considerable exploration potential (77K hectars)

    • Reserve replacement strategy

    • Focus on discovery of new zones

    Control Room/ UG Dispatch

    Autonomous Drills and Trucks Tunnel Boring Machine Exploration

  • 17

    Technology – Our ore body is moving further away every day and we need to react

    Scoop Trams

    Crusher/Rock Breaker

    Jumbo Drill Longhole Drill Haul Trucks

    TOGETHER, CREATING SUSTAINABLE VALUE

    UG Dispatch/ControlCenter

  • 18

    Thunder Bay IROC Integrated Remote Operations Center

    • UG dispatch with real-time monitoring- Personnel, energy, etc.

    • Real-time data for production and maintenance- Improves maintenance planning- Increases reliability

    • Set up for tele-remote- Scoops, Jumbos, LH Drills, Rock

    Breaker, Crusher

    • Dual setup in both Musselwhite and Thunder Bay

  • 19

    Q & A

    Musselwhite MineSlide Number 2Slide Number 3Musselwhite Mine Long SectionMaterial Handling Project - Existing Ramps & MH Development�Isometric View (Apr 22, 2017)�MHP Construction Update280 Hoist room RB90 drill set up657 Raise bore reamer installMHP Construction UpdateRB90-1 breakthroughInstallation of Galloway in shaft View look out to access to Hoist roomMHP Construction UpdateView hoist pit from the Electrical house Slide Number 15Musselwhite Opportunities for Value CreationTechnology – Our ore body is moving further away every day and we need to react Thunder Bay IROC Integrated Remote Operations Center Q & A