    1C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Selection:The most critical part of maintenance

    N. Hampton & J. Perkel

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    2/35

    2

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Acknowledgements This material is based upon work supported by the

    Department of Energy under Award No DE-FC02-

    04CH1237 and CDFI.

    Any opinions, findings, conclusions or recommendationsexpressed in this material are those of the author(s) and donot necessarily reflect the views of the Department ofEnergy.

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    3/35

    3

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Outline Motivation

    SAGE

    Selection

    Choice of when to start

    Choice of location

    Choice of action

    Choice of diagnostic

    Impact of Selection on Benefits / Value

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    4/35

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    5/35

    5C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    SAGE

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    6/35

    6

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    A Useful Way to Visualize thisSAGE

    Selection of circuits Actions that might be taken

    Generation of data including Diagnostics

    Evaluation of the outcome

    The name of the herb Sage comes fromthe Latin salvere or salvation meaning 'to

    be in good health, to cure, to save.'

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    7/35

    7

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Expectations

    No.ofF

    ailures

    Failures Increasing

    Failures Decreasing

    Selection

    Action

    Generation

    Evaluation

    Failures increasingas time passes since test

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    8/35

    8C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Selection

    Choice of when to start

    Choice of location

    Choice of actionChoice of diagnostic

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    9/35

    9C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    When to start?

    How to spot the trend

    How late can you leave it before it is too late

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    10/35

    10

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Falling Reliability

    Year

    Failur

    es

    2015201320112009200720052003

    800

    700

    600

    500

    400

    300

    200

    100

    0

    Whenshould we

    start aprogram?

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    11/35

    11

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Bathtub Curve for Failures

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    0 50 100 150 200 250 300

    Time

    Tot

    alNum

    berofFailur

    es

    Early FailuresWeibull Shape 1TBF decreases

    Time Between Failures

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    12/35

    12

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Too Soon

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    13/35

    13

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Too Late

    Aging

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    14/35

    14

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Just Right...

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    15/35

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    16/35

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    17/35

    17C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Location

    The failure rate is not the same everywhere

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    18/35

    18

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Selecting from the Whole Population

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    19/35

    19

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Local Failure Rates

    Port ion of t he Syst em

    LocalFailureRate-relto

    overalla

    verage(%

    )

    250

    200

    150

    100

    50

    0

    100

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    20/35

    20

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Local Failure Rates - Importance

    Importance

    RelativeFailureRate

    (%

    ofaverage)

    HighMediumLow

    200

    150

    100

    50

    0

    100

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    21/35

    21C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Action

    How the circuits fail will determine how they are fixed

    Age and Type will also determine actions

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    22/35

    22

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Failures by Equipment Type

    Perce

    ntage

    ofserv

    icefailures(%

    )

    AccessoriesUnknown SourceCable

    100

    80

    60

    40

    20

    0

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    23/35

    23

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Length adjusted MV system

    InstalledCapacity(%)

    UNKNOWNTRXLPEEPRXLPEHMWPEPILC

    100

    90

    80

    70

    60

    50

    40

    30

    20

    10

    0

    25

    50

    75

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    24/35

    24C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Diagnostic

    What diagnostic to use for which actions andequipment

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    25/35

    25

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Selection of Diagnostic

    Diagnostic technologies are available that provide eitherlocalized or global assessments of circuits.

    These techniques should fit with the actions that will betaken.

    Diagnostic should be sensitive to the prevalent failuremechanism.

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    26/35

    26

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Failure by Equipment Type

    Perce

    ntage

    ofserv

    icefailures(%

    )

    AccessoriesUnknown SourceCable

    100

    80

    60

    40

    20

    0

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    27/35

    27C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Economic Benefit

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    28/35

    28

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Data for Economics Calculations

    Different data are needed before one can begin tocompute the economics for diagnostic programs

    System Diagnostic

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    29/35

    29

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Consequence

    Diagnostic Program CostsCost [$]

    Selection

    Diagnostic

    Maintenance Total DiagnosticProgram Cost

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    30/35

    30

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    System Data

    Failure Rate

    Global

    Local Maintenance/Replacement costs

    repair

    rejuvenation replacement

    Cost of Poor Reliability

    Reliability indices Customer, regulator, or media intervention

    Emergency restoration cost

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    31/35

    31

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Diagnostic Data

    Selection

    Testing

    Diagnostic vender or equipment Switching crew

    Pilot Study data from testing in other areas

    Percent of tested population requiring each level ofmaintenance (i.e. percent of segments that needed to bereplaced according to diagnostic)

    Percent of tested segments failing on test Accuracy (i.e. how often do segments perform as

    diagnosed?)

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    32/35

    32

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Consequence

    Diagnostic Program CostsCost [$]

    Selection

    Diagnostic

    Maintenance Total DiagnosticProgram Cost

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    33/35

    33

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Program Savings

    b

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    34/35

    34

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Population Composition

  • 7/31/2019 MV Reliability Hampton & Perkel 110507

    35/35

    35

    C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ

    Summary

    Selecting the right segments to test is key to achievinggood performance from the diagnostic program

    Selection should focus on failure rates and importance ofcircuits.

    System cannot be either too good or too bad.

    Chosen diagnostic technique should match the systemcharacteristics (i.e. failure mechanism) and possible

    maintenance actions

    A diagnostic program requires substantial planning to beeffective.