     RTN 600 MW Installation Standard 1  HCPT - HUAWEI

    HCPT – HUAWEI

    RTN 600 MICROWAVES

    INSTALLATION STANDARD

    PT. Hutchitson PT

    ………………………………………

    Name:

    Date:

    PT Huawei Technologies

    ………………………………………

    Name:

    Date:

    HCPT 2G & 3G TURNKEY PROJECT

    2009

  • 8/19/2019 MW RTN Installation Standard v0 1

    2/14

     

     RTN 600 MW Installation Standard 2  HCPT - HUAWEI

    1.  Antenna Fastness

    Key Points Details DescriptionThe antenna must be

    installed in the rightheight and position and

    polarization

    The fixation of antenna

    and pole are reliable

    Each screw should be fastness very well

  • 8/19/2019 MW RTN Installation Standard v0 1

    3/14

     

     RTN 600 MW Installation Standard 3  HCPT - HUAWEI

    For the more than 1.2m antenna, the side strut must be installed and fixed

    position is correct.

    Antenna identifier

    (standard labeling)

    Labeling Format:

      Label template :

      Font : Black

      Background : White

      Material : Print Label

    ANTENNA TO XXX (FE ID)FAR END NAME

  • 8/19/2019 MW RTN Installation Standard v0 1

    4/14

     

     RTN 600 MW Installation Standard 4  HCPT - HUAWEI

    2.  ODU Fastness

    Key Points Details DescriptionThe ODU's and hybrid

    coupler's appearance areproperly Tighten all screw / bolt from ODU to hybrid

    IF connector from ODU should be waterproofed properly

    The IF connector of ODUshould be waterproofed

    and face downward

    ODU Fixing

    Waterproofing

    Waterproofing

  • 8/19/2019 MW RTN Installation Standard v0 1

    5/14

     

     RTN 600 MW Installation Standard 5  HCPT - HUAWEI

    The ODU grounding

    cable should be shortestlength as possible and

    attached to bus bar

    Grounding connection

    to bus bar

    ODU Grounding

  • 8/19/2019 MW RTN Installation Standard v0 1

    6/14

     

     RTN 600 MW Installation Standard 6  HCPT - HUAWEI

    ODU Identifier (ODU

    labeling)

    Labeling Format:

     

    Label template :

      For 1+1, mark ODU1 for main ODU and ODU2 for stand by ODU

      Font : Black

      Background : White

      Material : Print Label

    3.  IF Distribution

    Key Points Details DescriptionIn general, the IF cable

    should be grounded to a

    minimum of one point

    IF grounding kit installed between concurrence HCT and VCT

    Tower

    Recommended point to

    install IF roundin kit

    ODU1 TO XXX (FE ID)FAR END NAME

  • 8/19/2019 MW RTN Installation Standard v0 1

    7/14

     

     RTN 600 MW Installation Standard 7  HCPT - HUAWEI

    2 end are tidy with cable tie

    IF grounding kit should connect to lower VCT bus bar.

    Leave enough slack when

    connecting cables to the

    ODU to facilitate futuremaintenance

    IF redundant no more than 2 meters

    IF redundant no more

    than 2m

    Tidy up with cable tie

    Grounding kit

    connect to bus bar

  • 8/19/2019 MW RTN Installation Standard v0 1

    8/14

     

     RTN 600 MW Installation Standard 8  HCPT - HUAWEI

    IF cable must be up tilted

    or have Waterproof curvein the entrance of

    porthole

    Cable Installation and endto end labeling

    Porthole connection should be waterproofed

    Right position for hole IF cable route

    Proper installation for IF

    cable and separation with

    GND cable

  • 8/19/2019 MW RTN Installation Standard v0 1

    9/14

     

     RTN 600 MW Installation Standard 9  HCPT - HUAWEI

    IF cable labeling /

    identifier

    IF cable should have identifier / labeling on top near connector of

    ODU and IDU

    Outdoor IF Labeling Indoor IF Labeling

    Outdoor labeling: Indoor labeling:

    Labeling Format:

      Label template :

      For 1+1, use mark IF1 for main IF and IF2 for stand by IF

      Font : Black

      Background : White

      Material : Print Label, Label flag, cable ties, IF cable label

    IF 1 TO XXX (FE ID)

    FAR END NAME

  • 8/19/2019 MW RTN Installation Standard v0 1

    10/14

     

     RTN 600 MW Installation Standard 10  HCPT - HUAWEI

    4.  Indoor Equipment Fastness

    Key Points Details Description

    The installationposition of IDU

    accords to the

    engineering designdocument.

    Outdoor Installation and IDU placement (on BTS 3012AE)

    Outdoor Installation and IDU placement (on BTS 3900A)

    Indoor Installation and IDU placement on 19” rack

  • 8/19/2019 MW RTN Installation Standard v0 1

    11/14

     

     RTN 600 MW Installation Standard 11  HCPT - HUAWEI

    IDU and DCPDB

    labeling standard

    Standard labeling and labeling format

    IF Board LabelingLabeling Format:

      Label template :

      For 1+1, use mark IF1 for main IF and IF2 for stand by IF

      Font : Black

      Background : White

      Material : Print Label,

    Power Cable LabelingLabeling Format:

      Label template :

      Font : Black

      Background : White

     

    Material : Print Label, Flag label tie

    Tributary Cable LabelingLabeling Format:

      Label template :

      Font : Black

      Background : White

      Material : Print Label, Flag label tie

     

    Labeling on rectifier power cableLabeling Format:

      Label template :

      Font : Black

      Background : White

      Material : Print Label, Flag label tie

    TO : FE ID , FE NAME

    TX. xxxx MHz, RX. xxxx MHz

    TO : POWER CABLE

    TO : DDF

    TO : FAR END ID

  • 8/19/2019 MW RTN Installation Standard v0 1

    12/14

     

     RTN 600 MW Installation Standard 12  HCPT - HUAWEI

    Labeling on DCPDBLabeling Format:

      Label template : 

      Font : Black

      Background : White

      Material : Print Label

    DDF Labeling

    Standard

    Standard labeling for outdoor DDF (sample)

    Standard labeling for Indoor DDF (sample)

    TO : FAR END ID

  • 8/19/2019 MW RTN Installation Standard v0 1

    13/14

     

     RTN 600 MW Installation Standard 13  HCPT - HUAWEI

    5.  Cable distribution and routing

    Key Points Details Description

    Cable distribution andcable routing Cable routing standard for outdoor BTS.

    Cable routing standard for indoor BTS (1).

  • 8/19/2019 MW RTN Installation Standard v0 1

    14/14

     

     RTN 600 MW Installation Standard 14  HCPT - HUAWEI

    Cable routing standard for indoor BTS (2).