What Happens Next? Detailed site investigations including: environmental, land, and geotechnical surveys are on- going and will be soon completed. Following the completion of surveys and consultations, the design of the proposed road development will be finalised and the Environmental Impact Statement, Natura Impact Statement and Compulsory Purchase Order will be completed. It is anticipated that the development application will be ready for submission to An Bord Pleanála towards the end of Q1 2016. The Statutory Orders and Environmental and Natura Impact Statements will be prepared in accordance with the relevant legislation for the development consent process. All documentation submitted to An Bord Pleanála will be available for inspection at the offices of Roscommon NRDO for a period of at least 6 weeks during which time submissions may be made to the Board. Conact Details Should you have any queries on any aspect of the proposed road development, please forward them to: The Project Engineer, N5 Ballaghaderreen to Scramoge Road Project, Roscommon County Council, National Roads Regional Office, Racecourse Road, Roscommon. Phone: 090-6627004 Email: [email protected] If you are unable to attend the Public Information events, all of the material presented will be available for inspection at the above address; appointment is recommended to ensure staff are available to assist. N5 Ballaghaderreen to Scramoge Road Project Public Information Event– December 2015 Public Display Public Information Event– December 2015 An upgrade of the N5 National Primary route between Ballaghaderreen and Scramoge is proposed to tie in with the recently completed N5 Ballaghaderreen Bypass. The existing N5 passes through the towns of Frenchpark, Bellanagare, Tulsk and Strokestown. A preferred route corridor for the scheme was identified in 2007 and following a period of suspension the project was reactivated and is moving forward to planning stage. A public consultation event was held for the proposed road project in March 2015. The objective of that Public Consultation was to provide the public with a greater insight into the proposed road development and to request feedback on the developing design. Feedback received during this consultation was generally positive towards the project although many of the affected landowners raised specific issues regarding their holdings. Over the past number of months the project team have been addressing many of the comments received and where possible the design has been amended in response to these concerns as well as take account of the results of further surveys. The objective of this Public Information Event is to provide details of the design and land acquisition requirement that is being finalised for planning. The substantially complete design including side roads, junctions and ancillary works are presented in the attached maps. STAGE PERIOD Design Finalisation and Completion of Environmental Assessments Q4 2015 to Q1 2016 Application to An Bord Pleanála End Q1 2016

N5 Ballaghaderreen to Scramoge Road Project · N5 Ballaghaderreen to Scramoge Road Project Public Information Event– December 2015 Public Display Public Information Event– December

  • Upload
    others

  • View
    19

  • Download
    8

Embed Size (px)

Citation preview

What Happens Next?Detailed site investigations including: environmental, land, and geotechnical surveys are on-going and will be soon completed. Following the completion of surveys and consultations, the design of the proposed road development will be finalised and the Environmental Impact Statement, Natura Impact Statement and Compulsory Purchase Order will be completed. It is anticipated that the development application will be ready for submission to An Bord Pleanála towards the end of Q1 2016. The Statutory Orders and Environmental and Natura Impact Statements will be prepared in accordance with the relevant legislation for the development consent process. All documentation submitted to An Bord Pleanála will be available for inspection at the offices of Roscommon NRDO for a period of at least 6 weeks during which time submissions may be made to the Board.

Conact DetailsShould you have any queries on any aspect of the proposed road development, please forward them to:

The Project Engineer,N5 Ballaghaderreen to Scramoge Road Project,Roscommon County Council, National Roads Regional Office, Racecourse Road, Roscommon.

Phone: 090-6627004 Email: [email protected]

If you are unable to attend the Public Information events, all of the material presented will be available for inspection at the above address; appointment is recommended to ensure staff are available to assist.

N5 Ballaghaderreen to Scramoge Road Project Public Information Event– December 2015

Public DisplayPublic Information Event– December 2015An upgrade of the N5 National Primary route between Ballaghaderreen and Scramoge is proposed to tie in with the recently completed N5 Ballaghaderreen Bypass. The existing N5 passes through the towns of Frenchpark, Bellanagare, Tulsk and Strokestown. A preferred route corridor for the scheme was identified in 2007 and following a period of suspension the project was reactivated and is moving forward to planning stage.

A public consultation event was held for the proposed road project in March 2015. The objective of that Public Consultation was to provide the public with a greater insight into the proposed road development and to request feedback on the developing design. Feedback received during this consultation was generally positive towards the project although many of the affected landowners raised specific issues regarding their holdings. Over the past number of months the project team have been addressing many of the comments received and where possible the design has been amended in response to these concerns as well as take account of the results of further surveys.

The objective of this Public Information Event is to provide details of the design and land acquisition requirement that is being finalised for planning. The substantially complete design including side roads, junctions and ancillary works are presented in the attached maps.

STAGE PERIODDesign Finalisation and Completion of Environmental Assessments Q4 2015 to Q1 2016Application to An Bord Pleanála End Q1 2016

N5 Ballaghaderreen to Scramoge Road Project

SECTION AN5 Ballaghaderreen By-Pass

Opened September 2014 SECTION B

CASTLEREA

TULSK

BELLANAGARE

FRENCHPARK

STROKESTOWN

ELPHIN

CARRICK-ON-SHANNON

SCRAMOGE

RATHCROGHAN

N5

N61

N61

R368

R371

R368

R368

R369

R370TO CARRICK-ON-SHANNON

R361TO BOYLE

R367

R377

N61 TOROSCOMMON

N61 TOBOYLE

N5 TOLONGFORD

R371 TOLANESBOROUGH

R367 TOBALLINTOBER

R361 TOCASTLEREA

N5

N5

BALLAGHADERREEN

SECTION C SECTION D

N5

NOTES:

1. The proposed road details indicated on this drawing, including landacquisition boundaries, alignment, junction and access arrangements,and earthworks details, is indicative, not final and is subject tochange. It is a work-in-progress and will be modified as a result ofconsultation and feedback from stakeholders, further detailedinvestigations, including environmental, land, and geotechnicalsurveys, ongoing refinement of the design and assessments by thevarious environmental and technical specialists. Road alignment ofboth the new and realigned existing roads, junction locations, accessarrangements and other matters may be varied, relocated, added orremoved. Earthworks and other ancillary works and finer detailsincluding road drainage, lighting etc. may also be relocated, added orremoved. The land acquisition boundary will be amended accordingly.

2. Based on Ordnance Survey of Ireland Mapping by permission of theGovernment Permit Number 2014/18/CCMA Roscommon CountyCouncil. Copyright Government of Ireland.