nAmiBIA UniVERSITY OF SCIEnCE AnD TECHnOLOGY
FACULTY OF NATURAL RESOURCES AND SPATIAL SCIENCES
DEPARTMENT OF GEO-SPATIAL SCIENCES AND TECHNOLOGY
QUALIFICATIONS:
DIPLOMA IN GEOMATICS
BACHELOR OF GEOMATICS
QUALIFICATIONS CODES: QUALIFICATIONS LEVEL:
06DGEM 6 - 06DGEM
07BGEM 7- 07BGEM
COURSE CODE: BSV521S COURSE NAME: BASIC SURVEYING (Level 5)
SESSION: NOVEMBER 2016 PAPER: THEORY
DURATION: 3 HOURS MARKS: 100
FIRST OPPORTUNITY EXAMINATION QUESTION PAPER
EXAMINER: Mr. F. J. Louw
MODERATOR: Mr. E. Sinvula
INSTRUCTIONS 1. You MUST answer Question 1 and ANY THREE OTHER QUESTIONS.
2. Write clearly and neatly.
3. Number the answers clearly.
PERMISSIBLE MATERIALS
1. Calculators may be used as well as other drawing equipment
THIS QUESTION PAPER CONSISTS OF 13 PAGES (Including this Front Page and 4 Data
Sheets)
Basic Surveying BSV521S
Question 1
Answer the following questions on Data Sheet 1, by selecting the correct statement for each:
1.1. In geodetic surveys higher accuracy is achieved, if:
a. The curvature of the earth surface is ignored b. The curvature of the earth surface is taken into account c. The angles between the curved lines are treated as plane angles d. None of the above
1.2. Surveys concerned with the measurements and mapping of natural and artificial features of
the earth, like hills, lakes, rivers, roads, railways, power lines, etc are:
a. Engineering Surveys b. Cadastral Surveys c. Topographic Surveys d. Mining Surveys
1.3. A survey may be executed in several ways by different combinations of instruments and
methods, and some parts of the work may require different treatment from others. The
principle factors to be considered are:
a. The purpose of the survey b. The extent of the survey c. The degree of accuracy required d. All of the above
1.4. The main purposes of surveying is:
a. The art of making measurements of the relative positions of natural and man-made features on the earth's surface, and the presentation of this information either graphically or numerically
b. The determination of the relative positions of points (natural or artificial) on the surface ofthe earth.
c. The setting out on the ground of the positions of the points used in the construction, location of properties, etc
d. band c
1.5. The quality of a Surveyor is:
a. He must have a thorough theoretical and practical knowledge of his work. b. He must be honest and trustworthy and his judgment must be good c. He must have initiative; think clearly and without prejudice, tackling each survey with
energy and perseverance. d. All the above
151 Opportunity Examination Page 2 of 13 November 2016
Basic Surveying BSV521S
1.6. Determining the difference in height between two points relative to a reference plane, or
relative to each other, by means of an instrument that provides a line of sight perpendicular
to that of gravity i.e. a line of sight that is horizontal, is called:
a. Barometric Levelling b. Direct Levelling c. Levelling d. Alloftheabove
1.7. A permanent reference point or mark, of known height is a:
a. Witness Mark b. Reference Mark c. Bench Mark d. None ofthe above
1.8. The imaginary line passing through the optical centre of the object lens, through the
telescope and through the eyepiece, is a:
a. Contour Line b. Collimation Line c. Level Line d. Horizontalline
1.9. The first reading from a level station is:
a. foresight b. back-sight c. intermediate sight d. any sight
1.10. The most common co-ordinate system for referring to the position of any definite point on
the Earth's surface is:
a. Geographical Co-ordinate System b. Plane Rectangular or Grid Co-ordinate System c. Polar Co-ordinate System d. All of the above
1.11. The purpose of observing a Reference Object (R.O.) is:
a. To ensure that the horizontal circle of the instrument has not been disturbed while observing
b. To orient the instrument to Zero South c. To orient the instrument to a trigonometrical beacon d. None of the above
151 Opportunity Examination Page 3 of 13 November 2016
Basic Surveying BSV521S
1.12. Basic types of errors in surveying can be divided into two main groups, namely controllable
and uncontrollable errors, of which uncontrollable errors are:
a. Accidental Errors b. Gross Errors c. Systematic Errors d. All of the above
1.13. The basic method of determining a distance is:
a. Taping b. Electronic Distance Measuring c. Staff Tacheometry d. All of the above
1.14. Observations that are closely grouped and the measurement (average value) is accurate, are:
a. Accurate Observations b. Inaccurate Observations c. Precise Observations d. Accurate and Precise Observations
1.15. The requirement for traverse stations is:
a. Stations should be at inaccessible positions b. A clear line of sight is required between the Stations c. The length of traverse legs must be as short as possible. d. None of the above
1.16. Contours of different elevations may meet only in the case of
a. a vertical cliff b. a saddle c. a ridge d. an inclined plane
1.17. Two contour lines, having the same elevation:
a. cannot cross each other b. can cross each other c. cannot meet d. can meet
1.18. Contour maps can be used for the following:
a. To calculate the water capacities of reservoirs b. To trace a contour gradient for the road alignment c. To ascertain the indivisibility of points d. All the above
151 Opportunity Examination Page 4 of 13 November 2016
Basic Surveying BSV521S
1.19. An inverted staff reading means:
a. The levelling staff is held upside down b. The levelling staff is held between the back-sight and the foresight c. The levelling staff is held after the back-sight d. All of the above
1.20. An application of levelling is:
a. Longitudinal section b. Cross section c. Contouring d. All of the above
1.21. The method to calculate a resection is:
a. Bowditch Rule b. Collins' Q-point method c. Blunt's method d. band c
1.22. Fixing the plane coordinates of a point, by setting up on the unknown point, and observing a
distance and direction to a known point, and a direction to another known point is called a:
a. Intersection b. Polar c. Reverse Polar d. Join
1.23. The following correction needs to be applied on distances measured with a Total Station:
a. Atmospheric Corrections b. Conversion to German Legal Metre c. Combined Sea Level and Scale Enlargement Correction d. All of the above
1.24. A traverse that starts at a known point (co-ordinated point) and ends at another know point
(co-ordinated point) is a:
a. Closed Traverse b. Open Traverse c. Loop Traverse d. None of the above
151 Opportunity Examination Page 5 of 13 November 2016
Basic Surveying BSV521S
1.25. While viewing through a level telescope and moving the eye slightly, a relative movement
occurs between the image of the levelling staff and the cross hairs. That means the
instrument is:
a. Not Correctly focused b. Said to have parallax c. Free of parallax d. All the above
Question 2
2.1. Use the following information to calculate co-ordinate for point C.
Co-ordinates
Name
A
B
V
-6 836.515
-10 973.129
Angle at A = 38°
Angle at B = 5r
A
151 Opportunity Examination
X
+247 355.618
+247 584.123
c
Page 6 of 13
B
[25]
(15)
November 2016
Basic Surveying BSV521S
2.2. Use the levelling observations given on Data Sheet 2 to calculate final heights using the
"Height of Collimation" method. All checks need to be shown and any misclosures needs to
be distributed. (10}
[25]
Question 3
3.1. Calculate the co-ordinates of points TR1, TR2 and TR3 from the following data, by completing
Data Sheet 3. Adjustment must be done by the Bowditch Rule.
Co-ordinates
Name
b.SWP b. East
Traverse Leg b.SWP to TR1 TR1 to TR2 TR2 to TR3 TR3 to b.East
V X
- 4 680.110 + 62 348.590 + 61753.282 -10 917.978
Oriented Direction 28r 05 ' 41" 260° 06' 22" 262° 18' 42" 243° 32' 31"
Final Horisontal Distance 1824.328m 1 769.365m 1506.927m 1404.871m
(13)
3.2. Obtain orientated directions for the traverse RP1 - Trav1 - Trav2 - RP2 by completing the
direction sheet on Data Sheet 4. Do not calculate the traverse. (12)
[25]
Question 4
4.1. Define the term "Resection". (1)
4.2. The department wants to install a permanent base station on the roof of Poly Heights and
you have done the following observations to determine the co-ordinates for POLY. Use Collins
Q-point method to calculate the co-ordinates. Draw a sketch. (20}
1 51 Opportunity Examination Page 7 of 13 November 2016
Basic Surveying
Co-ordinates
Name
1'1 Win3 1'1 Eros 1'1 Hohe
y
- 6 423.820 -10 489.690 -11071.260
X
+ 62 884.860 + 60 272.270 + 64 410.770
Final Observed Directions.
@POLY
Name 1'1 Win3 1'1 Eros 1'1 Hohe
Fin. Observed Direction 70° 00' 00" - Long Leg
215° 04' 16" 292° 06' 30"
BSV521S
4.3. Use the field observations below, which were observed at Koppie to obtain the final observed
directions (No orientation needed). Show in table format. (4)
@Ko~~ie HI= 1.678m
Point/Station Circle Left Circle Right
1'1 Dune 175° 27' 13" 355° 27' 30"
Top 214° 17' 50" 34° 18' 09"
Low 41° 08' 07" 221° 08' 25"
RO 175° 27' 16" 355° 27' 14" [25]
Question 5
5.1. Calculate and apply all corrections to the observations (directions & distances) below. (10)
@WP HI= 1.656m
Point/Station Final Observed Direction Slope Distance Vertical Angle
1'1 OPDAM 284°04'22" 88°46'45"
1'1 DUBIS 49°27'55" 89°22'02"
VRIES 151°59'10" 764.075 8r42'04"
151 Opportunity Examination Page 8 of 13 November 2016
Basic Surveying
Co-ordinates
Name
b. OPDAM
b. DUBIS
WP
Please note:
y
-55 893.240
-36 570.010
-51257.400
BSV521S
X z
+ 113 141.220
+ 124 538.370
+ 111 979.000 1450.150
The Atmospheric Correction and Prism Constant Correction are already applied to all
measured distances.
Combined Sea level & Scale Enlargement Scale Factor= 1+ [(l/ (2R2}- H/R}],
where R = 6 370km.
5.2. Calculate the Y X Z co-ordinates for point House, by using the following information and the
observations at House. (15}
~Hab = H1- Hsig + Sab/Tan (Z} + (1-k}.S2 / (2R}
Where R is earth radius (use R = 6 370 km}, and k is an assumed relative ray curvature factor
(use k = 0.13}.
Ha= Hb- ~Hab
Please note:
ALL corrections are already applied to all measured distances.
@House HI= 1.565m
Point/Station Final Observed Direction Final Hor. Distance Vertical Angle
b. Blauputz 315°11'19" 90°02'24"
Kalk 75°19'23" 926.342 89°27'10" (Target=1.500m}
Co-ordinates
Name
b. Blauputz
Kalk
151 Opportunity Examination
y
+37 057.410
+43 991.910
X
+ 228 354.540
+ 219 483.720
Page 9 of 13
z
1378.158 (Ground Level}
[25]
November 2016
Basic Surveying BSV521S
Student Number:---------- Data Sheet 1
Question 1
Question a b c d
1.1.
1.2.
1.3.
1.4.
1.5.
- -1.6.
1.7.
1.8.
1.9.
1.10.
1.11.
1.12.
1.13.
1.14.
1.15.
1.16. ...... ...... - -1.17.
1.18.
1.19.
1.20.
1.21. - r-- - -1.22.
1.23.
1.24.
1.25.
151 Opportunity Examination Page 10 of 13 November 2016
Basic Surveying BSV521S
Student Number:---------- Data Sheet 2
Question 2.2.
Height of Collimation Levelling Sheet
NOTE: The BOLD and Underlined values are the Inverted Staff Readings.
NOTE: All answers must be rounded off to 3 decimal places
Collimation Reduced Final Point B.S. I.S. F.S. Heights Heights Correction Heights
TSM 201 1.756 1655.253
MH1 2.138
TP2 1.617 0.793
Kerb 1.355
Roofl 1.828
Roof2 2.123
TPS 1.010 2.451
TSM 202 2.234 1654.143
151 Opportunity Examination Page 11 of 13 November 2016
Basic Surveying BSV521S
Student Number:---------- Data Sheet 3
Question 3.1.
Bowditch Rule- Adjustment Sheet
Note: All answers must be rounded off to 3 decimal places
Oriented Directions and
V)
Final Horisontal z
Distances 0
Differences STATION Final Co-ordinates ...,
tJ.Y tJ.X y X
tJ.SWP - 4 680.110 + 62 348.590
Trl Vl c 0 ..., Q) +-' ro Tr2 :::::5 u ro u 1-0 Tr3 z 0 0
tJ.East -10 917.978 + 61753.282
151 Opportunity Examination Page12of13 November 2016
Basic Surveying BSV521S
Student Number:---------- Data Sheet 4
Question 3.2.
Direction Sheet
1 2 3 4 5 6 7
Fin. Obs. Prov. Prov. Join Diff. I Fin Join Dir. I Fin STATION Direction Back Dir. Prov. Corr. Forward Dir. Corr. Dir.
@ RPl
ll Twee 18° 46' 50" 18° 46' 44"
ll Tsaun 128° 24' 35" 128° 24' 28"
Trav1 2or 44' 09" ' . .
@Travl
RP1 21° 44' 26"
Trav2 251° 08' 21"
@Trav2 .
Trav1 7r 07' 53"
RP 178° 41' 44"
@RP2
ll Sand 122° 04' 21" 122° 04' 30"
ll Naub 25r 49' 50" 25r 50' o1"
Trav2 358° 41' 19"
151 Opportunity Examination Page 13 of 13 November 2016