NCMA Workshop

March 24 , 2015

Booker PullenSupervisor, Permitting Section

North Carolina Division of Air Quality, Raleigh, NC

(919) 707-8469

Permitting Updates

Page 2: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Compliance with Emissions Standards during Start-up, Shutdown and Malfunction under

§112 40 CFR 63.6(e)(1)(i), (f)(1), and (h) (1)  Sierra Club v. EPA (DC Circuit 2008), Decided December 19, 2008

Adam Kushner (EPA) Letter, Dated July 22, 2009  Table 1 Source Category Rules

DAQ’s Approach for Gap-Filling for Table 1 Affected Sources

DAQ’s Processing Mechanism for Gap-Filling for Table 1 Affected Sources

Page 3: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

40 CFR 63.6(e)(1)(i), (f)(1), and (h) (1) (e)(1)(i)

“At all times, including periods of startup, shutdown, and malfunction, the owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions…”

(f)(1)

“The non-opacity emission standards set forth in this part shall apply at all times except during periods of startup, shutdown, and malfunction…”

(h)(1)

“The opacity and visible emission standards set forth in this part must apply at all times except during periods of startup, shutdown, and malfunction…”

Page 4: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Sierra Club v. EPA (DC Circuit 2008), Decided December 19, 2008

Court vacated §§63.6(f)(1) and (h)(1) [SSM exemptions].

Court found that requirement to comply with the §112(d) standard is continuous.

Court found that the because the “general duty” [63.6(e)(1)(i)] is the only standard applies during the SSM (as some 112(d) standards do not include standards for SSM), any exemption from compliance with 112(d) standard during SSM is illegal, as the SSM exemptions violate the CAA requirement that the 112 standard applies continuously.

Page 5: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Adam Kushner (EPA) Letter, Dated July 22, 2009

Identified NESHAPs which explicitly incorporated SSM provisions in §§63.6 (f)(1) and (h) (1) [Table 1 Source Category Rules] and NESHAPs which did not incorporate these provisions [Table 2 Source Category Rules].

Table 1 Source Category Rules impacted.

Page 6: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Table 1 Source Category RulesPart 63 Subpart & Source Category

Page 7: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

DAQ’s Approach for Gap-Filling for Table 1 Affected Sources

Use §112(j) in 15A NCAC 2D .1109 to gap-fill the standards to comply during the SSM. See the example below.

“During the periods of startup, shutdown, and malfunction, the Permittee shall operate and maintain the emission source (ID No. ES-XX), including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. During a period of startup, shutdown, or malfunction, this general duty to minimize emissions requires that the Permittee reduce emissions from the above emission source to the greatest extent which is consistent with safety and good air pollution control practices. [15A NCAC 2D .1109 (§112(j) Case-by-Case MACT)]”

Page 8: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

DAQ’s Processing Mechanism for Gap-Filling for Table 1 Affected Sources

Use Title V procedures in 15 A NCAC 2Q .0516 (significant modification) or 2Q .0513 (renewal).

Page 9: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

NEW TOPIC

NEW TOPIC

Page 10: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The DAQ applies the EPA policy described in the “Seitz Memo” of May 16, 1995

Memo provides guidance on• when a facility must take limits to avoid major source requirements

• Major for one standard = major for all others?

• Is a facility that is required to comply with a MACT standard permanently subject to that standard? (i.e. Once-In-Always-In)

Once-In-Always-In MACT Policy

Page 11: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The policy states:

sources for HAPs on the "first compliance date" are required to comply permanently with the MACT

standard to ensure that maximum achievable reductions in toxic emissions are achieved and maintained.

In practice this means YES, but..

Once-In-Always-In MACT Policy

Page 12: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The DAQ to date has allowed facilities to remove MACT requirements from their permit when:

• The affected source was removed

• The affected source reformulated such that the regulated HAPs were no longer used

Once-In-Always-In MACT Policy

Page 13: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The EPA in a recent applicability determination (May 18, 2012) addressed once-in always-in for a company subject to the Pharmaceutical MACT (Subpart GGG).

The facility ceased manufacturing and removed all affected equipment in 2008.

No HAPS used at the facility subsequently. The facility wishes to operate new process with a HAP

PTE for HCL of 6.5 tpy ( <10 tpy)

Once-In-Always-In MACT Policy

Page 14: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The EPA concluded that since the facility did not use or emit any HAP after 2008 it no longer met the applicability requirements for the particular MACT (Subpart GGG)

The new project would be considered on its own merits (i.e. new source vs. an existing source and an area source

Once-In-Always-In MACT Policy

Page 15: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Take Home Points• This EPA determination is consistent with DAQs use of the

once-in-always-in policy.

• No significant departures

• There are no changes anticipated with respect to the once-in-always-in policy as implemented by the DAQ.

Once-In-Always-In MACT Policy

Page 16: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

NEW TOPIC

NEW TOPIC

Page 17: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Facilities affected: a. Currently have 112(j)-subject boiler, andb. Will still be HAP-Major on May 20, 2019

The 112(j) end date is May 19, 2019. MACT Subpart DDDDD takes over on May 20.

112(j) Case-by-Case MACT For Boilers

Transition to MACT Subpart DDDDD

Page 18: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

When a permit with a 112(j)-subject boiler is renewed, DAQ will add an end date for the 112(j) stipulation and a new stipulation for MACT Subpart DDDDD No change in requirements until the end date

of 112(j). This process is not expected to delay the

permit issuance. Other applications not affected.

112(j) Case-by-Case MACT For Boilers

Transition to MACT Subpart DDDDD

Page 19: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

If no relevant application is received by January 1, 2019, DAQ will initiate a “Reopen for Cause” application. No cost to facility Minimal effort from facility

112(j) Case-by-Case MACT For Boilers

Transition to MACT Subpart DDDDD

Page 20: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

How will MACT Subpart DDDDD be different from 112(j)? Overall requirements should be similar.

e.g. Boilers with tune-up requirements will still have those requirements

Call your DAQ contact to learn about changes specific to your facility.

112(j) Case-by-Case MACT For Boilers

Transition to MACT Subpart DDDDD

Page 21: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

NEW TOPIC

NEW TOPIC

Page 22: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

15A NCAC 02Q .0700 – Toxic rules applicability.

.0702 (27) (A), (B), and (C): exempt certain sources from the permit that are subject to various MACT/GACT/NESHAPS regs..

Examples: internal combustion engines, boilers.

N.C. Toxics Implementation

However…

Page 23: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

North Carolina S.L. 2012-91 requires us (NCDAQ) to ensure that net emissions increases from the addition or modification of emission sources will not pose an unacceptable risk to the public.

N.C. Toxics Implementation

Page 24: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

So, what is NCDAQ’s approach going to be to ensure that there is not an unacceptable risk?

The best way to understand NCDAQ’s multifaceted approach to this requirement is by way of an example.

Consider a facility with a chemical process and one emergency generator.

These sources have both been modeled previously, the engine for formaldehyde only.

N.C. Toxics Implementation

Page 25: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

In this case it doesn’t matter if the facility is major for HAPS or not because the chemical process and the engine do not share common pollutants and the engine is subject to a Part 63 emission standard in either case.

The facility submits a permit application to add a second engine emitting all the same pollutants as the first engine.

N.C. Toxics Implementation

Page 26: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Step One: For the pollutants whose emissions are increasing, add the potential emissions from the new engine to the actual emissions from the existing engine and compare to the appropriate TPERs.

For those pollutants below their respective TPERs, the conclusion is that there is no unacceptable risk to human health, and the permit is issued.

N.C. Toxics Implementation

Page 27: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Step Two: For those pollutants above their respective TPERs (most likely formaldehyde since it was previously modeled), there are several factors to consider.

What is the ratio of the existing unit’s actual to potential emissions (the ones likely previously modeled). In all likelihood the answer is a low number.

What will the percentage increase in formaldehyde emissions be from the new unit? Will it be 1%, 15%, 100%?

N.C. Toxics Implementation

Page 28: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

What was the percentage of the AAL impact from the previously modeled existing unit? Was it 5%, 25%, 95%?

Step Three: DAQ uses it’s engineering judgment If all the aforementioned numbers are relatively

low, DAQ can safely conclude that the addition of the new emission source will not pose an unacceptable risk to the public, and the permit is issued.

N.C. Toxics Implementation

Page 29: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

The very unlikely Step Four: If some of the aforementioned numbers are relatively high, e.g. original modeling very near the AAL, existing source operating near its PTE, or the new source adding considerably to existing emissions, DAQ may consider remodeling the facility to ensure that no unacceptable risk exists

Based on our experience over the past four years, and a number of new tools in the revised air toxics rules this step really is very unlikely

N.C. Toxics Implementation

Page 30: NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) 707-8469 Permitting

Allows the use of actual emissions from existing sourcesA new TPER table has been created for sources with only unobstructed, vertical stacks for affected sourcesThis table typically allows higher emission rates before an unacceptable health risk might be expectedPlease note that DAQ’s Air Quality Analysis Branch is available to assist with and, in some cases, perform modeling for North Carolina facilities.

N.C. Toxics Implementation

Nuances