Procedures # 1441/PA11 and 1441/PA6 are not updated, they contain data related with AWS forms not updated QC4-89 : Paragraphs 3.8 and 3.2 and 3.2(4) Review and upgrade “certified welder” procedure, (1441/PA-06) in (5.6.1), (5.6.2), (5.7) and (5.3.2) paragraphs that include the current AWS forms, also in the procedure (1441/PA-11) certify welder program administration in (5.3.3) responsibilities, paragraph. Likewise undertake the implementation of any

NCR- ATF accredited testing facility.docx

Embed Size (px)

Citation preview

Page 1: NCR- ATF accredited testing facility.docx

Procedures # 1441/PA11 and 1441/PA6 are not updated, they contain data related with AWS

forms not updated

QC4-89 : Paragraphs 3.8 and 3.2 and 3.2(4)

Review and upgrade “certified welder” procedure, (1441/PA-06) in (5.6.1), (5.6.2), (5.7) and (5.3.2) paragraphs that include the current AWS forms, also in the procedure (1441/PA-11) certify welder program administration in (5.3.3) responsibilities, paragraph. Likewise undertake the implementation of any notification from AWS.

Page 2: NCR- ATF accredited testing facility.docx

Preventive actions related with NCR # 090711-1 were not implemented as planned (actions implemented only for some WPS’s).QC4-89-3,2,1(6) arrangements for timely feedback and corrective actions whenever non-conformances are detected.

Review and upgrade, 1441/PA-06 in (3.0) politics, and (5.0) welding procedure specification (WPS) paragraphs., indicate that previously to be prepared by test supervisor, all WPS and PQR welding procedures must be reviewed, stamped and approved by quality assurance manager.

Page 3: NCR- ATF accredited testing facility.docx

Base and filler metal is checked on receipt, but the inspections is not effective: data on records are not accurate and complete (heat number of last base metal purchased is not recorded; in one case, heat number of filler metal in the tag on product is different to heat number in test report…)-See QC4:89-paragraph 3.7-

Upgrade inspection form (1441/F0-09) in wich it make reference to mtrs, HT and add dimensional measurements information. Also must to assign a unique number of incoming for each (HT) or (lot) using a marker, to ensure the traceability. Materials that not show traceability evidence, must be segregated and confined according to the “non-conforming” procedure and can´t be used in CW programs.

Page 4: NCR- ATF accredited testing facility.docx

Management review is not conducted on the routine basis established in QAM (6 months), it is conducted once to year.

Upgrade the QA manual (1441/MC-01) (3.2-2) paragraph to establish the frequency of a minimum once a year as is stipulated in the standard QC4-89 in (3.2.2) paragraph.

Page 5: NCR- ATF accredited testing facility.docx

Purchase orders do not define the application or the proper acceptance standards (for RT); RT of contractor procedures do not define the acceptance standards for AWS D1.1 and ASME BPVC applications (Welder performance testing /-Please see QC4-89, paragraph 3.2.1. (8).

Upgrade (1441/PA-06) “certified welder” procedure in (5.3.8) paragraph in which includes nondestructive test and personnel certification procedure to assurance that all documents are update with standard applying. Upgrade the form 1441/F0-84 including criteria.