12
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

Embed Size (px)

Citation preview

Page 1: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

NERC TADS Update

Andrew Slone, Engineer, Reliability Performance AnalysisWECC RPEWG MeetingMay 14, 2013

Page 2: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY2

• TADS Transition Quarterly Reporting Key Inventory Fields Bulk Electric System Alignment TADS Training/Webinars

• WECC Specific TADS Information WECC TO Direct Upload Importing TRD Data Into TADS

• WECC-FAC-501 Study Update

Agenda

Page 3: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY3

TADS Transition Timeline

Date TADS Outage Data Key Inventory DataMarch 01, 2013 TADS 2012 Annual Data Reporting

Submittal Deadline(200 kV+ Elements Only)

June 30, 2013 Element Identifier and Circuit Mileage Fields Only (200 kV+ Elements Only)

September 30, 2013 TADS 2013Q1 and 2013Q2 Data Submittal Deadline (200 kV+ Elements Only)

November 15, 2013 TADS 2013Q3 Data Submittal Deadline (200 kV+ Elements Only)

February 15, 2014 TADS 2013Q4 Data Submittal Deadline (200 kV+ Elements Only)

Update All Key Inventory Fields (200 kV+ Elements Only)

May 15, 2014 TADS 2014Q1 Data Submittal Deadline (All TADS Elements)

Element Identifier and Circuit Mileage Fields Only (Less than 200 kV Elements Only)

August 15, 2014 TADS 2014 Q2 Data Submittal Deadline(All TADS Elements)

November 15, 2014 TADS 2014 Q3 Data Submittal Deadline(All TADS Elements)

February 15, 2015 TADS 2014 Q4 Data Submittal Deadline(All TADS Elements)

Update All Key Inventory Fields(All TADS Elements)

Page 4: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY4

• TADS Changing from Annual to Quarterly Reporting Schedule• Transmission Owners Should Submit TADS Outage Data 45 Days

After Each Quarter• Data Changes for Prior Quarters:

During entry period, can update prior quarter outages Freeze Period

o After entry period ends, prior quarter outages are “frozen” and cannot be edited

o Current quarter outages, however, can be added/updated Deep-Freeze

o At end of Quarter 4 reporting, all outage and inventory data can no longer be edited

TADS Quarterly Reporting

Page 5: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY5

• TADS Changing from Summary Inventory to Individual Inventory• Inventory Forms Closely Resemble TRD, but Some Differences

Entity Unique Element ID Addedo In lieu of TO Operator name and Element ID (e.g. TOElement1)o Can be Alphanumeric, including underscoreo {Regional Entity, NCR, Element ID} combination will be unique NERC-wide

Instead of “In-service Date”, “Change/Reconfiguration Date”o Should be modified when circuit miles change to calculate proper equivalent

circuit miles Instead of “Parent Code”, “Precursor Element”

o Can input multiple Precursor Elements

TADS Key Inventory Fields

Page 6: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY6

• Common Corridor (WECC Only) Common Corridor information can be bulk uploaded into webTADS Follows TRD definitions AC Multi-Circuit Structure Miles calculated from Common Corridor

• TADS Considers Element In-service Date as 1/1/2013 if Element In-service Date is ≤ 12/31/2012

• BES Exception Field to handle new BES definition

TADS Key Inventory Fields

Page 7: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY7

• TADS to Align with New Bulk Electric System Definition in 2014• Includes the Following BES Elements:

AC Circuits DC Circuits Transmission Transformers (No GSUs) AC/DC Back to Back Converters

• Two New Voltage Classes BES 100-199 kV BES Less than 100 kV*

o *The Bulk Electric System definition has a bright-line at 100 kV, but there is an option to include Less than 100 kV Elements by special

inclusion

TADS Bulk Electric System Alignment

Page 8: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY8

• Elements > 200 kV, but excluded from BES? 2013: Continue to report in TADS 2014: Mark Element in inventory as “BES Excepted” and retire Element

as of 1/1/2014. Element is no longer TADS-reportable.• BES Exceptions Approved After 1/1/2014:

Mark Element in inventory as “BES Excepted” and retire Element as of BES Exception approval date.

Element is no longer TADS-reportable after BES Exception approval date.

TADS Bulk Electric System Alignment

Page 9: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY9

• 3 Combined Software/Data TADS Training Classes Prior to June 30 Deadline Will cover enough material for successful June 30 data submission

• Additional Training Dates TBA for July, August, and September Will cover enough material for successful September 30 data submission

TADS Training

Date Training Type

June 12, 20131 PM-3 PM ET

Combined Software/Data Training

June 19, 20131 PM-3 PM ET

Combined Software/Data Training

June 26, 20131 PM-3 PM ET

Combined Software/Data Training

Page 10: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY10

• WECC Transmission Owner Direct Upload WECC TOs will now upload to TADS directly instead of WECC DRE WECC 2012 TRD inventory data already uploaded into webTADS By June 30, WECC TOs should verify that all of their Element IDs are in

webTADS and that circuit mileage for Elements is accurate as of January 1, 2013

By September 30, WECC TOs should upload their outage data into webTADS

• Possible to Have WECC-Specific Training, if Desired

WECC Specific TADS Information

Page 11: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY11

• Trend average outage rates for the 7 sectors with more outages on lines with the standard over time

Evaluate whether average outage rates have changed since 2008

• Use outage rates per mile to see if the results are the same • Study cause code impact on the 7 sectors:

Controllable cause codeso Failed AC Substation Equipment, Human Error, Failed AC Circuit Equipment, Failed Protection System Equipmento Contamination, Foreign Interference, Power System Conditiono Vandalism (Terrorism, or Malicious Acts)o Environmental, Vegetation, Fire, Other

Uncontrollable cause codeso Lightning, Weather excluding lightning, Unknown

• Consider outage duration, start time and climate (e.g., terrain)• Consider violation records (FAC-501-1 and PRC-STD-005-1)• IPC and BPA Pre-2008 Outage Analysis

Analyzing Pre-2008 and Post-2008 Outage Data to Determine Effectiveness of WECC-FAC-501 Standard

WECC-FAC-501 Enhancements

Page 12: NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013

RELIABILITY | ACCOUNTABILITY12

Questions and Answers