    BOS IV&V Monthly Status Report

    Deliverable 5.4.2.4Reporting Period:

    September 1 October 31, 2013

    www.pcgtechnologyconsulting.com

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    3/15

    BOS Monthly Status ReportTopics

    Project Summary

    IV&V Activities Summary

    IV&V Risks Summary

    Planned Activities for Next Reporting Period

    BOS IV&V Monthly Status Report 2

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    4/15

    IV&V Project Summary

    BOS IV&V Monthly Status Report 3

    This section provides the consolidated status of IV&V and Quality Assurance activities in the table

    below:Project Area* Risk

    Status

    IV&V Observations

    Project Planning and

    Administration

    IV&Vs ability to assess vendor project planning and administration activities has been

    constrained by the lack of visibility into these activities. While IV&V, Xerox and the SSHIX

    staff attended bi-weekly Steering Committee meetings, many of these formal status meetings

    were significantly abbreviated during this reporting period in order for Xerox to address

    critical project concerns. IV&Vs access to project documentation has been minimal and

    participation in ad hoc meetings limited.

    Although Xerox presented an updated project schedule during this reporting period, most

    critical milestones were not met and project delays occurred.

    Requirements Specification /

    Validation & Requirements

    Specification Document

    Significant failures occurred during integration testing which indicated a lack of coordination

    between BOS and HCR-EE requirements definition, resulting in additional coding, testing,

    and frequent builds.

    In August, Xerox agreed to provide system extracts and update system documentation to

    provide additional requirements traceability information to IV&V, which has yet to occur. As a

    result, IV&V could not trace the BOS requirements to any of the testing results as of the date

    of this report.

    Data Retention Recovery

    Protection and Management Plan

    No change: IV&V Data Retention Recovery Protection and Management Plan review

    completed; no risks identified at this time.

    Hosting Plan No change: Hosting Plan review completed; no risks identified at this t ime.

    * Project areas assessed depend on the deliverables that are available for review per the DD&I project schedule.

    M

    NA

    NA

    M

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    5/15

    IV&V Project Summary (Continued)

    BOS IV&V Monthly Status Report 4

    Project Area Status IV&V Comments

    Project Management Plan

    (PMP)

    IV&V has identified multiple risks (see IV&V Assessment workbook) in this area, which the State has

    chosen to accept. IV&V continues to keep these risks open, however, to track the overall affect to the

    project.

    Risk Management IV&V continues to experience limited insight into formal risk management practices performed on behalf

    of the project and believes that the project is not implementing best practices in relation to identifying,

    tracking and mitigating project risks.

    Implementation IV&V participated in BOS implementation meetings 3-times per week leading up to implementation,

    which provided IV&V additional insight into the project.As 10/1/13 approached, concerns arose over the projects ability to go live on time. As a result, the NV

    Governors Office stepped in to monitor the project. In one of the meetings, alternatives were presented

    to delay implementation, which was rejected by the Governors Office. The BOS went live on 10/1/13

    with (known) missing functionality, undefined business processes and incomplete testing, (including

    CMS Blueprint testing). After implementation many critical defects were identified that required multiple

    production builds. In the coming days / weeks IV&V believes that the project needs to prioritize defects

    to be fixed, outstanding functionality to be implemented, and develop a schedule for doing so.

    M

    NA

    H

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    6/15

    IV&V Project Summary (Continued)

    BOS IV&V Monthly Status Report5

    Project Area Status IV&V Comments

    Test Management

    User Acceptance Testing

    Xerox completed wave testing as required by CMS and IV&V submitted the States Attestation Letter in

    accordance with CMS regulations. BOS did not fully complete end-to-end testing by 10/1/2013 and

    therefore IV&V was unable to fully assess if testing was successful during this reporting period.

    The project did not complete Blueprint testing by 10/1/31 (with CMS approval), which has yet to be

    scheduled as of the date of this report.

    As IV&V had limited insight into the BOS User Acceptance Testing (UAT) process, IV&Vs assessment

    in this area is based on the results of wave testing and defect reporting.

    Interfaces Delayed design and development of interfaces created delays in testing and coordinated mapping ofdata. Since implementation, the project continues to identify data errors in the interfaces which could

    not be identified before implementation due to the delays in interface development.

    Release Management While IV&V completed its assessment of Xeroxs Release Management Plan several months ago,

    release management is not scheduled to start until the BOS is in full production.

    Defect Management BOS & HCR-EE are co-managing defects identified during testing. Teams do not share a defect

    repository but are executing a process to ensure defects are recorded in each tool to ensure

    coordination of identified defects.

    Status has been updated to high due to the fact that a number of high magnitude critical defects

    continue to occur.

    Configuration Management No change: Configuration Management Plan released.

    NA

    NA

    H

    M

    H

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    7/15

    IV&V Project Summary (Continued)

    Project Area Status IV&V Comments

    Change Management No change: Change Management assessment completed.

    Performance and Scalability

    Plan

    IV&Vs system assessment of Performance and Scalability has been delayed to allow project resources

    to focus on development of the BOS.

    Security Management Single sign-on (SSO) functionally is still in development. The BOS has escalated this problem for

    resolution. Lack of SSO negatively affecting testers ability to successfully complete testing. Should

    SSO functionality not be feasible, workarounds will be required.

    IV&V reviewed 3rdparty vendor security assessment to determine if vendor fulfilled contractual

    obligations. No issues identified. IV&V is monitoring security related artifacts and has offered

    assistance, if needed.

    Detailed System Design Xeroxs second version of the SDD did not address significant issues/concerns that were raised in the

    initial reviews of the draft documentation. IV&V rejected this version of the SDD and recommended that

    the State do the same. IV&Vs assessment cannot be completed with the limited information provided

    in this document. The SDD does not follow standard guidelines for acceptable design documentation. If

    a well-documented and more complete version of the SDD is not delivered, the State will be unable to

    determine if the BOS was built as designed.

    NA

    NA

    L

    M

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    8/15

    IV&V Project Summary (Continued)

    BOS IV&V Monthly Status Report 7

    Project Area Status IV&V Comments

    Contingency Planning: The State should define contingency workarounds/processes and stakeholder communications based

    on limited functionality available for 10/1/2013 implementation date. Work efforts should be coordinated

    with HCR-EE to ensure all issues are resolved before implementation.

    Status has been updated to medium. The BOS was implemented with multiple workarounds (i.e. paper

    applications) due to missing functionality. The State has not provided updated contingency plans to

    IV&V for review.

    Risk Assessment Rating Legend

    Not Applicable Low Medium High CompletedL M HNA C

    M

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    9/15

    IV&V Activities Summary (Continued)

    BOS IV&V Monthly Status Report8

    IV&V activities completed in the current reportingperiod:

    Participated in Exchange Steering Committee Meetings

    Attended conference calls and webinars with CMS/CCIIO as appropriate

    Participated in test planning including UAT, BluePrint, and joint HCR-EE / BOS testing

    meetings

    Testing ongoing and attestation letters submitted as required by CMS

    Monitoring UAT testing progress

    Attended daily defect meetings

    Attended daily BOS programmer status meetings

    Attended UAT progress meetings

    Attended Governors Aide status meeting

    Attended defect prioritization planning meetings

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    10/15

    BOS IV&V Monthly Status Report9

    Contractors Project Management

    e-pm.51122 Scope Management

    e-pm.51235 Schedule (Time) Management

    e-pm.51237 Contingency Planning

    e-pm.52054 Implementation Communication Logistics e-pm.52067 Business Continuity Plan Lacks Business Operations

    Representation

    e-pm.52068 Command Center Model/Communications Difficulties

    e.pm.52069 Implementation Activities/Objectives

    e.pm.52070 Exchange Business Readiness

    Testing

    e-te.52073 UAT Defect Management

    Security

    b-se.52061 System Security Plan and Safeguards Procedure Report

    IV&V Risks

    A recap of the risks listed in the Monthly IV&V Assessment Workbook is provided

    below:

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    11/15

    BOS IV&V Monthly Status Report10

    IV&V Assessment Metrics

    The IV&V assessment metrics provide a summary of the risks and findings reported

    in the IV&V Assessment Workbook.

    Base Risk Metrics:

    Total Open22

    Total Closed1

    Total Accepted0

    Total Updated8

    Total Closed (30-day) 0

    Total Open (30-day) 0

    Note: 30-day period since last status

    update

    Total Open71%

    Total Closed

    3%

    TotalAccepted

    0%

    TotalUpdated

    26%

    Total Closed(30-day)

    0%

    Total Open(30-day)

    0%

    Risks

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    12/15

    BOS IV&V Monthly Status Report11

    IV&V Assessment Metrics

    The IV&V assessment metrics provide a summary of the risks and findings reported

    in the IV&V Assessment Workbook.

    Project Management11

    Requirements0

    Quality0

    Operating Environment 0

    Design & Development 0

    Testing 8

    Data Management 0

    Security1

    Open Risks by Section:

    0

    2

    4

    6

    8

    10

    12

    No.ofR

    isks

    Risk Sections

    Open Risks by Section

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    13/15

    BOS IV&V Monthly Status Report12

    IV&V Assessment Metrics

    The IV&V assessment metrics provide a summary of the risks and findings reported

    in the IV&V Assessment Workbook.

    Total Open79

    Total Closed240

    Total Accepted0

    Total Updated 0

    Total Closed (30-day) 0

    Total Open (30-day) 1

    Base Findings Metrics:

    Note: 30-day period since last status update Total Open25%

    Total Closed75%

    Total Accepted0%

    Total Updated0%

    Total Closed

    (30-day)0%

    Total Open(30-day)

    0%

    Findings

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    14/15

    IV&V Planned Activities

    BOS IV&V Monthly Status Report13

    The following activities are planned for the next reporting period:

    Continue participation in Exchange Steering Committee Meetings

    Continue onsite presence when required

    Participate in BOS daily status meeting

    Initiate IV&V system assessments

    Continue IV&V testing validations

    Continue with Xerox deliverable reviews

    Monitor defect resolution and Fast Follow development

  • 8/12/2019 Nevada Silver State Exchange // Status report 10.31.13

    15/15

    BOS IV&V Monthly Status Report14

    Public Consulting Group Technology Consulting

    2150 River Plaza Drive, Suite 380 Sacramento, CA 95833

    (916) 565-8090 www.publicconsultinggroup.com