Station Renovation

with the inauguration

of the “Ueno-Tokyo Line”

• Takuji Ito • Manager, East Japan Railway Company, Japan • 2-B Design1

Page 3: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Contents

Part 1 Outline of the Ueno-Tokyo Line

Part 2 Station Renovations

・Tokyo Station

・Shimbashi Station

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 3

Page 4: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Outline of Ueno-Tokyo line

4

【Outline of Ueno-Tokyo Line】 ・Line added between Ueno and Tokyo stations ・Construction start: May 2008 Line opened: March 2015

【Purpose】 ・Alleviation of congestion ・Reduction of travel time

Direct through services of Tokyo Metropolitan Area

Tokyo Metropolitan

Area

Ueno-Tokyo line

Shinkansen

Ueno-Tokyo Line

(opened Mar. 2015)

Shonan- Shinjuku Line

(opened Dec. 2001) Direct through-services with Rinkai Line

(opened Dec.2002)

Ueno

Tokyo

Shinagawa

Shinjuku

Akabane

Kita-senju

Chiba

Omiya

Tachikawa Hachioji

Yokohama

Kawasaki

Ebisu Shin-kiba

Tsuchiura

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Ikebukuro

Page 5: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Outline of Ueno-Tokyo line

5

Tokaid

o

【Outline 】 ・Takasaki /Utsunomiya Lines ⇒Direct through-service

of Tokaido Line

・Joban Line

⇒Direct though-service

for Shinagawa station Change of passenger flow

at stations Passengers transfer at different stations(Ueno ⇒Tokyo,Shimbasi)

【Station Renovation】

■Tokyo station ・Enlargement of North Concourse ・Development of new commercial area

■Shimbashi station ・Concourse improvement ・Construction of large train cover 【Before】 【After】

Shimbashi

Shinagawa

Yurakucho

Hamamatucho

Tamachi

Akihabara

Ueno

Tokyo

Shimbashi

Shinagawa

Yurakucho

Hamamatucho

Tamachi

Akihabara

Congestion

Ueno

Tokyo

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 6: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Tokyo station

6

Sou

th c

on

cou

rse

Cen

tral

co

nco

urs

e

Concourse inside ticket gates

shop

shop shop

Unused space (embankment)

ラチ外コンコース

Development Area 2012~2020

Subject

・Congestion of North Concourse

・Development of unused space

North concourse

Outline of Tokyo station ・Average daily passengers : 420,000/day ・Opened: 1914 ・Lines: Conventional lines/ 9 Platforms 18 Lines Shinkansen/ 5 Platforms 10 Lines

Concourse inside ticket gates (Shinkansen)

Concourse inside ticket gates

Station staff room

Concourse outside ticket gates

Narrow space

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 7: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Tokyo station

7

ラチ内コンコース

新幹線コンコース

店舗

before after

Development of

new commercial area

Development of ground floor

(first phase)

shop shop

shop

Widening of north concourse

6.8 m ⇒ 12m

Concourse inside ticket gates

Concourse inside ticket gates

Concourse inside ticket gates (Shinkansen)

Concourse outside ticket gates

Station staff room

Unused space (embankment)

stairs

added

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 8: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Tokyo station

8

Development of underground B1 floor (second phase)

shop

Development of new commercial area

(10,600㎡)

Unused space (embankment)

Concourse inside ticket gates

Station staff room

Station staff room

Station staff room

Concourse inside ticket gates

Unused space (embankment)

Unused space (embankment)

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 9: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Tokyo station

9

Image after completion

(underground)

Image after completion(North Concourse)

Construction

Construction

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 10: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Shimbashi station

10

Outline of Shimbashi station

・Average daily passengers: 250,000/day ・Opened: 1872 ・Lines: Conventional lines / 4 Platform 8 Lines

shop

Concourse inside ticket gates

(Planned)

Before

Concourse inside ticket gates

Station staff room

Concourse outside ticket gates

Concourse outside ticket gates

Station staff room

Concourse outside ticket gates

After

Outline of Improvement

・Integrated north and south concourses into one single concourse ・Enlarged platforms for Tokaido Line ・Installed stairs and elevators to improve accessibility

Current photo

Image after completion

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 11: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Shimbashi station

11

Congestion on Tokaido platforms

東海道新幹線

東海道下り

東海道上り

京浜南行

京浜北行

山手(外)

山手(内)

Enlarged platforms(max 0.8m)

東海道新幹線

東海道下り

東海道上り

京浜南行

京浜北行

山手(外)

山手(内)

Outline of Improvement

・Enlarged platform for Tokaido Line ・Construction of big train shed

Before

After

Image after completion

Construction of large train cover

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”

Page 12: New Station Renovation with the inauguration · 2017. 12. 6. · Station Renovation with the inauguration of the “Ueno-Tokyo Line” • Takuji Ito • Manager, East Japan Railway

Shimbashi station

12

Slide construction of large train cover

Step 1 Step 2

Step 3 Step 4

Step 0 gantry Large train cover

slide

Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line”