Upload
ellen-goodwin
View
215
Download
0
Embed Size (px)
Citation preview
No. 6 Winze
Water Level7100 Level - Existing
Waste Pass
Winze Bottom
Water below 7400 L
New drift development with drill stations
Drilling-Geotechnical
Water level 7400 level
7400 level - Existing
7100 level
No. 6 Winze
Water below 7400l, Drilling, Dev.
7100 level
7400 level
7700 level
Water level below 7700 level
New drift development
Drilling - Geotechnical
Water below 7700L, Drilling, Dev.
7400L slashing complete
Water pumped out and Dev.
7100L drift complete
7400L – New drift development
7700L – New drift development
7100L - complete
7400L drift complete
7700L - complete
Vent Raise
Air filtration and coolingUtilities Wash and change
Equipment/wash Cafeteria/Refuge
Core Homestake Underground Lab.
7100L
7400L
7700L
Refuge station
Lab.
Emergency drifts
Ramp
No.6 Winze
Addition of first Detector Experiment
7100L
7400L 7700LFuture drift development
Future Lab.
No.6 winze Future Lab.
Refuge station
Future Development