NOEV_ShopFab_DataSheet

Embed Size (px)

Citation preview

  • 7/28/2019 NOEV_ShopFab_DataSheet

    1/2

    Clarification

    No ITEM Key Word Description Vendor confirmation results

    1 Common MaterialPlease confirm that the material of the type 304 is suitable for the fablication.

    2 Common Baffles

    Information issue schedule

    (1) Agitator's size, number of impeller blade

    (2) baffle

    (3) Assembly sequences of agitator impeller blade and shaft

    (4) Nozzle load (Static load, Torque, Vertical down, Bending moment) for N4 to be provided from

    Agitator Supplier

    (5) Tolerance of nozzles for vertically mounted agitator

    (6) Informaiton for the vibration check as below.

    - Motor Frequency

    - Rotating speed of blade

    - Q'ty of baffles

    3 Common Knuckle

    Knuckle radius:

    Vendor to confimr whether the current knucle radius shown in data sheet is suitable or not.

    4 Common Knuckle

    Please confirm the knuckle part fabrication procedure.

    - Press machine capacity

    - Availability of Dye of pressing (Newly fabricate for each item? )

    - Whose scope of forming? By sub-vendor or By vessel vendor?

    - Experience of pressing (or forming)

    5 CommonShell /

    Conical

    Even though it's non-code vessel, shell and conical thickness shall be designed and calcuated as per

    ASME VIII Div1 Appendix-9. Due to pressurizing inside steam coil, shell and conical will be stressed

    from external. Please confirm and follow the above requirement.

    6 Common Jacket Coil

    Following requirement to consider:

    The Jacket coil shall be welded with full penetration after V-bevel edge preparation. Further, all

    welding seam shall be NDE examined by PT or MT.

    7 Common Fabrication

    Vessel fabrication procedure shall be finalized in consideration of the imppeller blade size, baffle size

    and agitator assembly sequence.

    The points of procedure are:

    - Blade installation method

    - Tolerance for shaft verticality

    - Timing of installation

    - Who will install

    - How to take the agitator parts in vessel, and from where

    - Required inspection after agitator installation

    - Temporary support for transportation (if required)

    8 Common

    Agitator

    Mount

    Nozzle

    - Vendor to verify whether a RIB supports and additional rainforcing around Agitator Mount nozzle is

    reuired or not

    - Vendor to recommended how much nozzle projection will be required.. (We guess 150mm nozzle

    projection is too short)

    9 CommonMotor

    Type

    Please confimr if the Motor of Agitator can be located on top roof.

    V-410 / V-430 / V-431 / V-510 / V-511

    1/2 141252711.xls.ms_office

  • 7/28/2019 NOEV_ShopFab_DataSheet

    2/2

    Clarification

    No ITEM Key Word Description Vendor confirmation results

    V-410 / V-430 / V-431 / V-510 / V-511

    10 Common

    Stiffener

    Beam

    below the

    top roof(1)

    Please incorporate the scope of design and analysis of Vibration and reinforcement design of top

    roof.

    The vibration would caused by agitator due to resonance. And also need confirm whose scope of top

    roof design to avoid vibration.

    Stiffener beam shall be designed in consideration of not only the loading data from Agitator Supplier

    but also the sympathetic vibration between tank and agitator.

    11 Common

    Stiffener

    Beam

    below the

    top roof

    (2)

    To avoid vibration and to reinforce support beams, the additional ribs inside STEEL channel are

    required. (As per Taganito PJ Lesson Learned)

    12 CommonNozzle

    Projection

    The following nozzle projection to be recommended by vendor.

    N2 , N7 A/B/C, N8 A/B/C (those are attached on the jacket coil)

    13 Common

    Fabrication

    of Coil

    Jacket(2)

    Please confirm the fabrication procedure and sequence of coil jacket with vessel vendor. The

    attachment is one of typical fabrication sequence.

    When vendor follow the above typical sequence, please confirm the following points;

    - Experience

    - Coil bending procedure and sub-vendor

    14 Common

    Bolt Circle

    Diameter

    of setting

    bolt

    Vendor to advice the B.C.D. and Lugs location.

    15 CommonLoading

    Data

    Loading data shall be calculated by vendor.

    16 V-430/V-431Support

    Lug design

    Vendor to cofirm whether a lug support is sufficient for V-430, V-410.

    Attachment-1(Fab sequence).pd

    2/2 141252711.xls.ms_office