PI +
63.02
PC +96.1
8 PT +74.62PI +88.05PI +12.99PC +08.79
PT +80.73PC +83.64PT +74.96
0+00
12+36.32
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
1 H
ighw
ay T
itle
She
et.d
wg
Prin
ted:
1/1
9/20
18 7
:55
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
1 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
TITLE SHEET
NOTICE OF INTENT SUBMISSIONLENGTH OF PROJECT = 953.16 FEET = 0.18 MILES
LOCATION PLAN
SCALE IN FEET
200 0 200 400
INDEXSHEET NO. DESCRIPTION
1 TITLE SHEET
2 LEGEND AND ABBREVIATIONS
3 GENERAL NOTES
4 TYPICAL SECTIONS
5 - 7 CONSTRUCTION PLANS
8 - 10 PROFILES
11 - 13 DRAINAGE AND UTILITY PLANS
14 - 16 CONSTRUCTION DETAILS
17 - 31 BRIDGE PLANS
THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS ANDBRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 1, 2015,THE OCTOBER 2017 CONSTRUCTION STANDARD DETAILS, THE 2015 OVERHEAD SIGNAL STRUCTUREAND FOUNDATION STANDARD DRAWINGS, MASSDOT TRAFFIC MANAGEMENT PLANS AND DETAILDRAWINGS, THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS ANDHIGHWAYS WITH MASSACHUSETTS AMENDMENTS, THE 1990 STANDARD DRAWINGS FOR SIGNSAND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING,AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, WILL GOVERN.PROJECT END
STA. 14+28.16N 2860652.4338E 696837.6388
PROJECT BEGINSTA. 4+75.00N: 2860208.4644E: 696009.8813
LAWRENCE STREETIMPROVEMENTS PROJECT
N
LAWRENCE STREET
CRANBERRYMEADOW ROAD
HAMPTON ROAD
PARK STR
EET
BUSH POND
BOARD OF SELECTMENSCOTT BUGBEE, CHAIRMANJIM LEHAN, VICE CHAIRMAN
JEFF PALUMBO, CLERK
TOWN ADMINISTRATORJACK HATHAWAY
DEPARTMENT OF PUBLIC WORKSROBERT J. McGHEE, DIRECTOR
GENERAL SYMBOLSEXISTING PROPOSED DESCRIPTION
JERSEY BARRIER ON BRIDGE OR JERSEY BARRIERCATCH BASINCATCH BASIN CURB INLETFLAG POLEGAS PUMPMAIL BOXPOST SQUAREPOST CIRCULARWELLELECTRIC HANDHOLEFENCE GATE POSTGAS GATEBORING HOLEMONITORING WELLTEST PITHYDRANTLIGHT POLECOUNTY BOUNDGPS POINTCABLE MANHOLEDRAINAGE MANHOLEELECTRIC MANHOLEGAS MANHOLEMISC MANHOLESEWER MANHOLETELEPHONE MANHOLEWATER MANHOLEMASSACHUSETTS HIGHWAY BOUNDMONUMENTSTONE BOUNDTOWN OR CITY BOUNDTRAVERSE OR TRIANGULATION STATIONTROLLEY POLE OR GUY POLETRANSMISSION POLEUTILITY POLE W/ FIREBOXUTILITY POLE WITH DOUBLE LIGHTUTILITY POLE W / 1 LIGHTUTILITY POLEBUSHTREESTUMPSWAMP / MARSHWATER GATEPARKING METERSIGN AND POSTSIGN AND POST (2 POSTS)OVERHEAD CABLE/WIRECURBINGCONTOURSUNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)BALANCE STONE WALLGUARD RAIL - STEEL POSTSGUARD RAIL - WOOD POSTSCHAIN LINK OR METAL FENCEWOOD FENCEHAY BALES/SILT FENCETREE LINE OR LIMIT OF CLEARING AND GRUBBINGSAWCUT LINETOP OR BOTTOM OF SLOPELIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAYBANK OF RIVER OR STREAMBORDER OF WETLAND100 FT WETLAND BUFFER200 FT RIVERFRONT BUFFERSTATE HIGHWAY LAYOUTTOWN OR CITY LAYOUTCOUNTY LAYOUTRAILROAD SIDELINETOWN OR CITY BOUNDARY LINEPROPERTY LINE OR APPROXIMATE PROPERTY LINEEASEMENTCOMPOST FILTER TUBE
ABBREVIATIONS
GENERALAADT ANNUAL AVERAGE DAILY TRAFFICABAN ABANDONADJ ADJUSTAPPROX. APPROXIMATEA.C. ASPHALT CONCRETEACCM PIPE ASPHALT COATED CORRUGATED METAL PIPEBIT. BITUMINOUSBC BOTTOM OF CURBBD. BOUNDBL BASELINEBLDG BUILDINGBM BENCHMARKBO BY OTHERSBOS BOTTOM OF SLOPEBR. BRIDGECB CATCH BASINCBCI CATCH BASIN WITH CURB INLETCC CEMENT CONCRETECCM CEMENT CONCRETE MASONRYCEM CEMENTCI CURB INLETCIP CAST IRON PIPECLF CHAIN LINK FENCECL CENTERLINECMP CORRUGATED METAL PIPECSP CORRUGATED STEEL PIPECO. COUNTYCONC CONCRETECONT CONTINUOUSCONST CONSTRUCTIONCR GR CROWN GRADEDHV DESIGN HOURLY VOLUMEDI DROP INLETDIA DIAMETERDIP DUCTILE IRON PIPEDW STEADY DON'T WALK - PORTLAND ORANGEDWY DRIVEWAYELEV (or EL.) ELEVATIONEMB EMBANKMENTEOP EDGE OF PAVEMENTEXIST (or EX) EXISTINGEXC EXCAVATIONF&C FRAME AND COVERF&G FRAME AND GRATEFDN. FOUNDATIONFLDSTN FIELDSTONEGAR GARAGEGD GROUNDGG GAS GATEGI GUTTER INLETGIP GALVANIZED IRON PIPEGRAN GRANITEGRAV GRAVELGRD GUARDHDW HEADWALLHMA HOT MIX ASPHALTHOR HORIZONTALHYD HYDRANTINV INVERTJCT JUNCTIONL LENGTH OF CURVELB LEACH BASINLP LIGHT POLELT LEFTMAX MAXIMUMMB MAILBOXMH MANHOLEMHB MASSACHUSETTS HIGHWAY BOUNDMIN MINIMUMNIC NOT IN CONTRACTNO. NUMBERPC POINT OF CURVATUREPCC POINT OF COMPOUND CURVATUREP.G.L. PROFILE GRADE LINEPI POINT OF INTERSECTIONPOC POINT ON CURVEPOT POINT ON TANGENTPRC POINT OF REVERSE CURVATUREPROJ PROJECTPROP PROPOSEDPSB PLANTABLE SOIL BORROWPT POINT OF TANGENCYPVC POINT OF VERTICAL CURVATURE
ABBREVIATIONS (cont.)GENERAL
PVI POINT OF VERTICALINTERSECTION
PVT POINT OF VERTICAL TANGENCYPVMT PAVEMENTPWW PAVED WATER WAYR RADIUS OF CURVATURER&D REMOVE AND DISPOSERCP REINFORCED CONCRETE PIPERD ROADRDWY ROADWAYREM REMOVERET RETAINRET WALL RETAINING WALLROW RIGHT OF WAYRR RAILROADR&R REMOVE AND RESETR&S REMOVE AND STACKRT RIGHTSB STONE BOUNDSGC SLOPED GRANITE CURBSHLD SHOULDERSMH SEWER MANHOLEST STREETSTA STATIONSSD STOPPING SIGHT DISTANCESHLO STATE HIGHWAY LAYOUT LINESW SIDEWALK
T TANGENT DISTANCE OFCURVE/TRUCK %
TAN TANGENTTEMP TEMPORARYTC TOP OF CURBTOS TOP OF SLOPETYP TYPICALUP UTILITY POLEVAR VARIESVERT VERTICALVC VERTICAL CURVEWCR WHEEL CHAIR RAMPWG WATER GATEWIP WROUGHT IRON PIPEWM WATER METER/WATER MAINX-SECT CROSS SECTION
TRAFFIC SIGNALCAB. CABINET
CCVE CLOSED CIRCUIT VIDEOEQUIPMENT
DW STEADY DON'T WALKFDW FLASHING DON'T WALKFR FLASHING CIRCULAR REDFRL FLASHING RED LEFT ARROWFRR FLASHING RED RIGHT ARROWFY FLASHING CIRCULAR AMBERFYL FLASHING AMBER LEFT ARROWFYR FLASHING AMBER RIGHT ARROWG STEADY CIRCULAR GREENGL STEADY GREEN LEFT ARROWGR STEADY GREEN RIGHT ARROW
GSL STEADY GREEN SLASH LEFTARROW
GSR STEADY GREEN SLASH RIGHTARROW
GV STEADY GREEN VERTICALARROW
OL OVERLAPPED PEDESTRIANPTZ PAN, TILE, ZOOMR STEADY CIRCULAR REDRL STEADY RED LEFT ARROWRR STEADY RED RIGHT ARROWTR SIG TRAFFIC SIGNALTSC TRAFFIC SIGNAL CONDUITW STEADY WALKY STEADY CIRCULAR AMBERYL STEADY AMBER LEFT ARROW
JBCB
FPGPMB
WELLEHH
GGBHL #MW #TP #
MHB
TPL or GUY
UFBUPDLULTUPL
WGPM
PAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
DOTTED WHITE LINE
DOTTED YELLOW LINE
DOTTED WHITE LINE EXTENSION
DOTTED YELLOW LINE EXTENSION
DOUBLE WHITE LINE
DOUBLE YELLOW LINEDBYL
DBWL
BWL
SWL
CW
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
TRAFFIC SYMBOLS
EXISTING PROPOSED DESCRIPTION
CONTROLLER PHASE ACTUATED
TRAFFIC SIGNAL HEAD (SIZE AS NOTED)
WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED)
VIDEO DETECTION CAMERA
MICROWAVE DETECTORPEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW ASSHOWN) AND SADDLEEMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT
VEHICULAR SIGNAL HEAD
VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED
FLASHING BEACONPEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED)
RAILROAD SIGNALSIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)
MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)
HIGH MAST POLE OR TOWER
MAST ARM WITH LUMINAIRE
OPTICAL PRE-EMPTION DETECTORCONTROL CABINET, GROUND MOUNTED
CONTROL CABINET, POLE MOUNTED
FLASHING BEACON CONTROL AND METER PEDESTAL
LOAD CENTER ASSEMBLYPULL BOX 12"x12" (OR AS NOTED)
ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)
TRAFFIC SIGNAL CONDUIT
20'
20'
1
M
*
RRSG
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
2 Le
gend
& A
bbre
viat
ions
.dw
g P
rinte
d: 1
/19/
2018
2:2
0 P
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
2 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
LEGEND AND ABBREVIATIONS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
1. THE WORK UNDER THIS PROJECT INCLUDES BUT IS NOT LIMITED TO PAVEMENT RESURFACING, FULL DEPTH ROADWAY RECONSTRUCTION, SIDEWALK CONSTRUCTION, INSTALLATION OF DRAINAGESTRUCTURES AND PIPES, PLACEMENT OF PAVEMENT MARKINGS, GUARDRAIL, PROTECTION OF EXISTING UTILITIES TO REMAIN, GRADING, INSTALLATION OF TRAFFIC SIGNS, AND TRAFFICMAINTENANCE DURING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL CONFLICTS BETWEEN THE EXISTING UTILITIES AND PROPOSED WORK. THE ENGINEER RESERVES THE RIGHT TO MODIFY THE DESIGN TOREALIGN PIPING AND STRUCTURE LOCATIONS AND INVERTS TO SUIT ACTUAL FIELD CONDITIONS ENCOUNTERED AT NO ADDITIONAL COST TO THE TOWN.
3. ALL EXISTING STREET NAME, REGULATORY, GUIDE, AND WARNING SIGNS, INCLUDING POSTS, WITHIN THE LIMITS OF WORK ARE TO BE RETAINED UNLESS OTHERWISE NOTED.
4. THE CONTRACTOR SHALL RETAIN AND PROTECT ALL CURBS, FENCES, WALLS, TREES, SHRUBS, POSTS, LANDSCAPE FEATURES, AND OTHER MISCELLANEOUS ITEMS WITHIN ABUTTING PROPERTIESUNLESS OTHERWISE NOTED. WHEN RETAINING THOSE ITEMS IS NOT PRACTICAL IN THE OPINION OF THE ENGINEER, THE CONTRACTOR SHALL REMOVE, STOCKPILE, PROTECT AND RESET THEITEMS. THE CONTRACTOR SHALL REPLACE ITEMS DAMAGED DURING REMOVAL, STOCKPILING, OR RESETTING DUE TO NEGLIGENCE, CARELESSNESS, OR MISHANDLING WITH EQUIVALENT NEW ITEMSAT NO COST TO THE TOWN. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING TREES NOT CALLED OUT IN THE PLANS TO BE REMOVED. THE COSTS FOR PROTECTION SHALL BEINCIDENTAL TO THE CONTRACT.
5. CONTRACTOR SHALL NOT PARK OR STORE CONSTRUCTION EQUIPMENT, MATERIALS OR VEHICLES UNDER THE DRIPLINE OF ANY TREE.
6. THE CONTRACTOR SHALL PROVIDE ALL SAFETY CONTROL (SIGNS, REFLECTORIZED DRUMS, ETC) FOR CONSTRUCTION OPERATIONS IN ACCORDANCE WITH THE TRAFFIC MANAGEMENT PLANSINCLUDED HEREIN AND THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. PROVIDING SAFETY CONTROLS SHALL BE INCLUDED IN THE COST OF ITEM 851.2, TRAFFIC CONTROLS FORCONSTRUCTION. PAYMENT FOR ADJUSTING, REPOSITIONING AND REMOVING SAFETY CONTROLS SHALL BE INCLUDED IN ITEM 851.2.
7. ALL LANDSCAPED AREAS BETWEEN THE PROPOSED EDGE OF PAVEMENT AND SLOPE LIMITS, INCLUDING BUT NOT LIMITED TO LAWNS, BARK MULCH, PLANTING BEDS, ETC., SHALL BE REPLACED INKIND.
8. THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES PRIOR TO THE START OF WORK.
9. MAILBOXES SHALL BE SET IN ACCORDANCE WITH MASSDOT STANDARD DETAIL E 504.1.0., PARALLEL TO CURB WITH LETTER SLOT FACING TRAFFIC.
10. ALL GRATES, FRAMES AND COVERS OF STRUCTURES TO BE REMOVED OR ABANDONED SHALL BE DELIVERED BY THE CONTRACTOR TO THE TOWN OF NATICK AND STACKED AT A LOCATIONDESIGNATED BY THE TOWN.
11. ALL UTILITIES AND THEIR APPURTENANCES SHALL BE RETAINED AND PROTECTED UNLESS OTHERWISE NOTED.
12. THE TOWN SHALL REMOVE TREES WITHIN THE PROJECT LIMITS AS INDICATED ON THE CONSTRUCTION PLANS. THE CONTRACTOR SHALL THEN REMOVE THE TREE STUMPS THAT REMAIN.
13. THE CONTRACTOR SHALL CLEAR BRUSH AND TREES THROUGH THE LIMITS SHOWN ON THESE PLANS, AS NEEDED AND WHEN APPROVED BY THE ENGINEER TO FACILITATE THE CONSTRUCTION OFTHE PROJECT OR AS OTHERWISE DIRECTED BY THE ENGINEER. THE COST OF THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE WORK UNDER THIS CONTRACT AND SHALL NOT BE PAIDSEPARATELY.
1. THE EXISTING CONDITIONS SHOWN ON THIS BASE MAP ARE THE RESULT OF AN ON THE GROUND INSTRUMENT SURVEY PROVIDED BY UNITED CONSULTANTS.
2. THIS DRAWING WAS PREPARED SOLELY FOR AND IS INTENDED FOR THE WORK ASSOCIATED WITH THIS PROJECT. THE USE OR REUSE OF THESE DRAWINGS FOR OTHER PURPOSES OR BY PARTIESNOT DIRECTLY CONTRACTED TO THIS PROJECT IS PROHIBITED WITHOUT PRIOR WRITTEN PERMISSION FROM THE TOWN OF NORFOLK.
3. HORIZONTAL DATUM IN MASSACHUSETTS STATE PLANE (2001) U.S. SURVEY FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
4. EXISTING DRAINAGE AND EXISTING WATER LINES ARE BASED ON WATER MAIN IMPROVEMENTS AND APPURTENANT WORK PLAN TOWN OF NORFOLK, MA DATED 3/2008.
1. THE CONTRACTOR IS HEREBY MADE AWARE THAT EXISTING UTILITIES, INCLUDING BUT NOT LIMITED TO EXISTING WATER AND DRAIN PIPES; DRAINAGE AND SEWER STRUCTURES; GAS LINES,COMMUNICATION LINES AND UTILITY POLES, MAY NEED TO BE PROTECTED AND/OR SHORED UP DURING THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS UNDER THIS PROJECT. THE COSTOF THE WORK REQUIRED FOR THE PROTECTION, MAINTENANCE AND SUPPORT OF THESE OR OTHER EXISTING ABOVE GROUND OR UNDERGROUND UTILITIES IN THE VICINITY OF THE PROPOSEDWORK SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO THE WORK UNDER THIS CONTRACT.
2. THIS PLAN WAS PREPARED IN CONFORMANCE WITH AMERICAN SOCIETY OF CIVIL ENGINEERS STANDARD CI/ASCE 38-02 "STANDARD GUIDELINE FOR THE COLLECTION AND DEPICTION OF EXISTINGSUBSURFACE UTILITY DATA", QL"C". REFER TO UTILITY QUALITY LEVEL INFORMATION INDEX. ACCURACY OF UTILITY LOCATIONS IS NOT GUARANTEED.
3. BELOW GROUND STRUCTURES, UNLESS DIMENSIONED, ARE SYMBOLIC ONLY.
4. PRIOR TO THE START OF ANY WORK ON THE SITE, THE CONTRACTOR SHALL VERIFY THE ACTUAL LOCATION OF ALL UTILITIES, SHOWN OR NOT SHOWN ON THIS PLAN. CONTACT DIG-SAFE AT1-888-344-7233 (1-888-DIG-SAFE) AT LEAST 72 HOURS PRIOR TO THE START OF EXCAVATION. NORFOLK DEPARTMENT OF PUBLIC WORKS ALSO NEEDS TO BE CONTACTED AT 508-528-4990.
GENERAL NOTES
PLAN NOTES
UTILITY NOTES CONTINUED
UTILITY QUALITY LEVEL INFORMATION INDEX (SEE ASCE/CI 38-02):
UTILITY QUALITY LEVEL A:PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF PREVIOUSLYEXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT.MINIMALLY INTRUSIVE EXCAVATION EQUIPMENT IS TYPICALLY USED TO MINIMIZE THE POTENTIAL FOR UTILITY DAMAGE. A PRECISEHORIZONTAL AND VERTICAL LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS SHOWN ON PLAN DOCUMENTS. ACCURACY ISTYPICALLY SET TO 15-MM VERTICAL AND TO APPLICABLE HORIZONTAL SURVEY AND MAPPING ACCURACY AS DEFINED OR EXPECTEDBY THE PROJECT OWNER. INFORMATION IS ONLY VALID WITHIN THE VISIBLE LIMITS OF THE TEST HOLE.
UTILITY QUALITY LEVEL B:INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THEEXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL B DATA SHOULD BE REPRODUCIBLEBY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCESDEFINED BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS.
UTILITY QUALITY LEVEL C:INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONALJUDGMENT IN CORRELATING THIS INFORMATION TO QUALITY LEVEL D INFORMATION.
UTILITY QUALITY LEVEL D:INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS.
1. ALL REINFORCED CONCRETE (RCP) PIPE SHALL BE CLASS III UNLESS OTHERWISE NOTED.
2. ALL DUCTILE IRON PIPE (DIP) SHALL BE THICKNESS CLASS 52 OR GREATER.
3. TEST PITS ARE SPECIFIED ON THE PLANS. THE CONTRACTOR SHALL, AT A MINIMUM, PERFORM TEST PITS AT THE DESIGNATEDLOCATIONS TO VERIFY EXISTING UTILITIES. ADDITIONAL TEST PITS SHALL ONLY BE PERFORMED WHEN APPROVED BY THEENGINEER.
4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL CONFLICTS BETWEEN THE EXISTING UTILITIES AND THE PROPOSEDWORK. AT LEAST 48-HOURS NOTICE MUST BE PROVIDED. THE ENGINEER RESERVES THE RIGHT TO MODIFY THE DESIGN TOREALIGN THE PIPE AND STRUCTURE LOCATIONS AND INVERTS TO SUIT ACTUAL FIELD CONDITIONS ENCOUNTERED.
5. ALL OFFSETS TO THE CATCH BASINS ARE TO THE CENTER BACK OF THE GRATE. THE LOCATION AND ORIENTATION OF THE BELOWGRADE STRUCTURE SHALL BE FIELD COORDINATED BY THE CONTRACTOR TO AVOID CONFLICTS WITH EXISTING UTILITIES.
6. ALL EXISTING AND PROPOSED CATCH BASINS SHALL HAVE INLET PROTECTION DURING ALL CONSTRUCTION ACTIVITIES.
7. ALL EXISTING DRAIN PIPES UNDER THE PROPOSED ROAD OR SIDEWALK SHALL BE RETAINED UNLESS OTHERWISE NOTED. IF THEEXISTING PIPE IS TO BE REMOVED OR ABANDONED AND IT EXTENDS OUTSIDE THE PROPOSED ROADWAY OR SIDEWALK LIMIT ITSHALL BE CUT AND CAPPED AT THE RESPECTIVE LIMIT AT NO ADDITIONAL COST. REMOVAL AND DISPOSAL OF THESE PIPES ISINCIDENTAL TO THE DRAINAGE ITEMS.
UTILITY NOTES
DRAINAGE NOTES
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
3 G
ener
al N
otes
.dw
g P
rinte
d: 1
/19/
2018
2:2
7 P
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
3 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
GENERAL NOTES
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
4 Ty
pica
l Sec
tions
.dw
g P
rinte
d: 1
/19/
2018
3:4
8 P
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
4 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
TYPICAL SECTIONS
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
BEGIN FULL DEPTHPAVEMENT RECONSTRUCTIONSTATION: 5+00.00
PROJECT BEGINMILL AND OVERLAYSTATION: 4+75.00N: 2860208.4644E: 696009.8813
N
23
45
6
7
PC +93.15
PT +54.20
PROP. MILL AND OVERLAY
PROP. SLOPE LIMIT
PROP. FULL DEPTHPAVEMENT RECLAIMATION
PROP. HMA WALK
(REM.)
(RET.)
R&D EXIST. GUARDRAIL
(RET.)
6.00
'
8.00
'
PROP. LOAM &SEED (TYP.)
PROP. LOAM & SEED
N 37° 27' 05" E 493.15'
L=161.05' R=410.00'
=22° 30' 20"
(RET.)
PROP. COMPOST FILTER TUBE
PROP. HMAWATERWAY
PROP. HMA BERM,TYPE A-MODIFIED
(RET.)
(RET.)
(RET.)(R&R-B.O.)
R&D EXIST. PAVEMENT
(R&D)
CO
NTI
NU
ED
ON
SH
EE
T N
O. 6
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
5 C
onst
ruct
ion
Pla
ns.d
wg
Prin
ted:
1/1
9/20
18 8
:10
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
5 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PLANS 1
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
PROPOSED GUARDRAIL NOTES
STA. 5+35 LT (TRAILING ANCHORAGE)STA. 5+44 TO 6+50 LT (GUARDRAIL, TL-2 (SINGLE FACED))STA. 5+35 TO 5+72 RT (GUARDRAIL TANGENT END TREATMENT, TL-2)STA. 5+72 TO 10+66 RT (GUARDRAIL, TL-2 (SINGLE FACED))
N
7 8 9 10 11
12
PC +18.59PT +54.20
PT +84.46
PROP. SLOPE LIMIT
PROP. MODIFIED ROCK FILL
(RET.)
PROP. 6' WALKWAY(SEE SIDEWALK PLAN SHEET 34)
PROP. BRIDGE (N-13-008 (BU5))
(R&D)
(RET.)
(R&R-B.O.)PROP. GUY
(REM.)
(R&R-B.O.)
(R&R-B.O.)
(R&R-B.O.)
8.00
' 8.00
'
(REM.)(REM.)
(RET.)
L=161.05' R=410.00'=22° 30' 20" N 59° 57' 25" E 464.39' L=65.87' R=335.00'
=11° 15' 56"
(R&R-B.O.)
(RET.)(RET.)(RET.)
PROP. COMPOST FILTER TUBE
PROP. HMA BERM,
TYPE A-MODIFIED
R&D EXIST. GUARDRAIL
R&D EXIST. GUARDRAIL
PROP. FULL DEPTHPAVEMENT RECLAIMATION
PROP. FLOATING SILT FENCE
PROP. FLOATING SILT FENCE
(REM.)(REM.)
CO
NTI
NU
ED
ON
SH
EE
T N
O. 7
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
5 C
onst
ruct
ion
Pla
ns.d
wg
Prin
ted:
1/1
9/20
18 8
:10
AM
CO
NTI
NU
ED
ON
SH
EE
T N
O. 5
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
6 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PLANS 2
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
PROPOSED GUARDRAIL NOTES
STA. 5+50 TO 10+66 RT (GUARDRAIL, TL-2 (SINGLE FACED))STA. 10+66 TO 11+00 RT (TRANSITION TO BRIDGE RAIL)STA. 11+16 TO 11+49 RT (TRANSITION TO BRIDGE RAIL)STA. 11+49 TO 12+38 RT (GUARDRAIL, TL-2 (SINGLE FACED))STA. 12+38 RT (TRAILING ANCHORAGE)
PROJECT ENDSTATION: 14+28.16N: 2860652.4338E: 696837.6388END FULL DEPTH PAVEMENTRECONSTRUCTION
N
11
12
1314
PC +18.59
PC +69.70PT +84.46
PT +96.5314+40.18
(RET.)
PROP. HMA BERM, TYPE A-MODIFIED
PROP. HMA WALK
(REM.)
(RET.)
R&R. SLOPEDGRAN. EDGING
PROP. HMA BERM,TYPE A-MODIFIED
(R&R-B.O.)PROP. GUY
(R&D)
(R&R-B.O.)PROP. BRIDGE
(R&D)
8.00
'
5.00
'
PROP. LOAM & SEED (TYP.)
PROP. LOAM & SEED(TYP.)
(REM.)(REM.)
(REM.)(REM.)
(REM.)
L=65.87' R=335.00'=11° 15' 56" N 71° 13' 21" E 85.24'L=126.83' R=820.00'
=8° 51' 44"
N 80° 05' 05" E 43.65'
(RET.)
(R&R-B.O.)
(RET.)
(RET.)
PROP. 4' GRASS STRIP
5.00
'
8.00'(RET.)
(REM.)
(RET.)
(RET.)
PROP. COMPOSTFILTER TUBE
(R&R-B.O.)
(RET.)
R&D EXIST. GUARDRAIL
R&D EXIST.GUARDRAIL PROP. SAWCUT AND
MATCH EXISTING
202
203
204
C +
46.3
2
PT +
81.1
8
STA. 14+40.18 LAWRENCE STREET B =STA. 202+47.55 PARK STREET B
LL
PROP. SAWCUT
(R&D)(RET.)
PROP. FULL DEPTHPAVEMENT RECLAIMATION
(RET.)
PROP. FLOATING SILT FENCE
PROP. FLOATINGSILT FENCE
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
5 C
onst
ruct
ion
Pla
ns.d
wg
Prin
ted:
1/1
9/20
18 8
:10
AM
CO
NTI
NU
ED
ON
SH
EE
T N
O. 6
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
7 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PLANS 3
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
PROPOSED GUARDRAIL NOTES
STA. 5+50 TO 10+66 RT (GUARDRAIL, TL-2 (SINGLE FACED))STA. 10+66 TO 11+00 RT (TRANSITION TO BRIDGE RAIL)STA. 11+16 TO 11+49 RT (TRANSITION TO BRIDGE RAIL)STA. 11+49 TO 12+38 RT (GUARDRAIL, TL-2 (SINGLE FACED))STA. 12+38 RT (TRAILING ANCHORAGE)
NAVD 88BASE ELEV170.00
180
190
200
210
220
170
180
190
200
210
220
GR
AD
E B
RE
AK
STA
= 4
+75.
00
ELE
V =
183
.12
LOW POINT ELEV = 177.44LOW POINT STA = 6+65.16
PVI STA = 5+85.16PVI ELEV = 177.89
A.D. = 4.20%K = 38.12160' VC
PV
C: 5
+05.
16E
LEV
: 181
.69
PV
T: 6
+65.
16E
LEV
: 177
.44
218.6' HSD
-4.75%
3+00 4+00
181.
93
5+00
179.
82
178.
36
6+00
177.
56
3+00 4+00 5+00 6+00
BEGIN PROJECTSTA. 4+75.00
CO
NTI
NU
ED
ON
SH
EE
T N
O. 9
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
6 P
rofil
es.d
wg
Prin
ted:
12/
28/2
017
11:0
2 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
8 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PROFILES 1
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
4 4 8
0
0
20
NAVD 88BASE ELEV160.00
170
180
190
200
210
160
170
180
190
200
210
-0.55%1.50%
LOW POINT ELEV = 177.44LOW POINT STA = 6+65.16
PVI STA = 5+85.16PVI ELEV = 177.89
A.D. = 4.20%K = 38.12160' VC
PV
T: 6
+65.
16E
LEV
: 177
.44
218.6' HSD
LOW POINT ELEV = 178.14LOW POINT STA = 10+12.50
PVI STA = 11+35.00PVI ELEV = 179.98
A.D. = 5.85%K = 41.88245' VC
PV
C: 1
0+12
.50
ELE
V: 1
78.1
4 221.7' HSD
LOW POINT ELEV = 176.54LOW POINT STA = 8+49.26
PVI STA = 8+85.00PVI ELEV = 176.23
A.D. = 2.05%K = 75.49155' VC
PV
C: 8
+07.
50E
LEV
: 176
.66
PV
T: 9
+62.
50E
LEV
: 177
.39
1167.1' HSD
177.
56
177.
25
7+00
176.
97
176.
708+00
176.
54
176.
71
9+00
177.
21
177.
95
10+00
178.
87
7+00 8+00 9+00 10+00
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
0
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
6 P
rofil
es.d
wg
Prin
ted:
12/
28/2
017
11:0
2 A
M
CO
NTI
NU
ED
ON
SH
EE
T N
O. 8
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
9 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PROFILES 2
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
4 4 8
0
0
20
NAVD 88BASE ELEV160.00
170
180
190
200
210
160
170
180
190
200
210
3.45%
7.35%
GR
AD
E B
RE
AK
STA
= 1
4+28
.00
ELE
V =
198
.28
HIGH POINT ELEV = 197.65HIGH POINT STA = 14+10
PVI STA = 13+45.00PVI ELEV = 195.41
A.D. = -3.90%K = 33.33130' VC
PV
C: 1
2+80
ELE
V: 1
90.6
3 PV
T: 1
4+10
ELE
V: 1
97.6
5341.7' SSD
LOW POINT ELEV = 178.14LOW POINT STA = 10+12.50
PVI STA = 11+35.00PVI ELEV = 179.98
A.D. = 5.85%K = 41.88245' VC
PV
C: 1
0+12
.50
ELE
V: 1
78.1
4
PV
T: 1
2+57
.50
ELE
V: 1
88.9
8
221.7' HSD
178.
87
180.
37
11+00
182.
46
185.
15
12+00
188.
44
192.
04
13+00
195.
04
197.
29
14+0011+00 12+00 13+00 14+00
EXISTINGBRIDGE
END PROJECTSTA. 14+28.00
PARKSTREET
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
6 P
rofil
es.d
wg
Prin
ted:
12/
28/2
017
11:0
2 A
M
CO
NTI
NU
ED
ON
SH
EE
T N
O. 9
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
EA
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
10 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION PROFILES 3
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
4 4 8
0
0
20
BEGIN FULL DEPTHPAVEMENT RECONSTRUCTIONSTATION: 5+00.00
PROJECT BEGINMILL AND OVERLAYSTATION: 4+75.00N: 2860208.4644E: 696009.8813
WG
N
23
45
6
7
PC +93.15
PT +54.20(R&D)
PROP. FLARED ENDSECTION WITH STONEFOR PIPE ENDSINV.=175.27'
PROP. HMAWATERWAY
R&R GUY (B.O.)
R&R UTILITYPOLE (B.O.)
PROP. MECHANICALLYRESTRAINED CAP (B.O.)
PROP. 12" GATEVALVE & BOX (B.O.)
PROP. 12" DICL PIPE(B.O.)
PROP. 1/64 BEND (B.O.)
PROP. 1/64 BEND (B.O.)
PROP. 1/64 BEND(B.O.)
DRAINAGE STRUCTURE TABLE
NAME/TYPE
PROP. DI 3
PROP. DMH 1-1
PROP. DMH 2-1
PROP. WQS DMH 1-2
PROP. WQS DMH 2-2
STATION
10+58.86
5+47.58
11+56.75
5+53.14
11+63.44
OFFSET
10.8 L
15.1 L
19.6 L
7.5 L
13.7 L
RIM ELEV.
178.89
179.79
182.44
179.56
183.00
INCOMING PIPES
I=175.78' PROP. BYPASS DMH 1-3I=175.62' PROP. WQS DMH 1-2
I=177.28' PROP. BYPASS DMH 2-3I=177.14' PROP. WQS DMH 2-2
I=175.77' PROP. BYPASS DMH 1-3
I=177.29' PROP. BYPASS DMH 2-3
OUTGOING PIPES
I=175.52'
I=177.04'
I=175.67' PROP. DMH 1-1
I=177.19' PROP. DMH 2-1
DRAINAGE STRUCTURE TABLE
NAME/TYPE
PROP. BYPASS DMH 1-3
PROP. BYPASS DMH 2-3
PROP. CB 1-1
PROP. CB 1-2
PROP. CB 2-1
PROP. CB 2-2
PROP. DI 1
PROP. DI 2
STATION
5+42.68
11+57.33
5+36.58
5+36.79
11+37.41
11+37.51
7+99.34
8+47.90
OFFSET
3.8 L
7.6 L
10.9 L
11.0 R
10.9 L
11.0 R
10.9 L
10.9 L
RIM ELEV.
180.02
182.68
180.21
180.10
181.66
181.68
176.48
176.32
INCOMING PIPES
I=175.91' PROP. CB 1-1I=175.91' PROP. CB 1-2
I=177.43' PROP. CB 2-1I=177.43' PROP. CB 2-2
OUTGOING PIPES
I=175.88' PROP. DMH 1-1I=175.81' PROP. WQS DMH 1-2
I=177.38' PROP. DMH 2-1I=177.33' PROP. WQS DMH 2-2
I=175.98' PROP. BYPASS DMH 1-3
I=176.01' PROP. BYPASS DMH 1-3
I=177.57' PROP. BYPASS DMH 2-3
I=177.61' PROP. BYPASS DMH 2-3
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
5
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
8 D
rain
age
And
Util
ity P
lans
.dw
g P
rinte
d: 1
/17/
2018
3:5
0 P
M
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
3
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
11 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
DRAINAGE AND UTILITY PLANS 1
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
N
7 8 9 10 11
12
PC +18.59PT +54.20
PT +84.46
MA
WAY
R&R UTILITYPOLE (B.O.)
(REM. GUY POLE - B.O.)
R&R UTILITY POLE,PROP. GUY POLE (B.O.)
R&R UTILITYPOLE (B.O.)
PROP. FLARED END SECTIONWITH STONE FOR PIPE ENDS
INV.=176.81'
R&R UTILITYPOLE (B.O.)
R&R UTILITYPOLE (B.O.)
PROP. 12" DICL PIPE (B.O.)
PROP. 1/64 BEND (B.O.)
PROP. 1/8 BEND (B.O.) (TYP.)
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
6
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
8 D
rain
age
And
Util
ity P
lans
.dw
g P
rinte
d: 1
/17/
2018
3:5
0 P
M
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
4
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
12 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
DRAINAGE AND UTILITY PLANS 2
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
PROJECT ENDSTATION: 14+28.16N: 2860652.4338E: 696837.6388END FULL DEPTH PAVEMENTRECONSTRUCTION
N
11
12
1314
PC +18.59
PC +69.70
PT +84.46PT +96.53
14+40.18
202
203
204
PC
+46
.32
PT +
81.1
8
PROP. FLARED END SECTIONWITH STONE FOR PIPE ENDS
INV. =176.81'
REM. GUY POLE(B.O.)
R&R UTILITY POLE,PROP. GUY POLE (B.O.)
R&R UTILITY POLE,PROP. GUY POLE (B.O.)
R&R UTILITYPOLE (B.O.)
PROP. 12" DICL PIPE (B.O.)
PROP. 12" MECHANICALLYRESTRAINED TRANSITIONINSULATED COUPLING (B.O.)
PROP. 1/8 BEND (B.O.) (TYP.)
PROP. 1/8 BEND (B.O.) (TYP.)
DRAINAGE STRUCTURE TABLE
NAME/TYPE
PROP. BYPASS DMH 1-3
PROP. BYPASS DMH 2-3
PROP. CB 1-1
PROP. CB 1-2
PROP. CB 2-1
PROP. CB 2-2
PROP. DI 1
PROP. DI 2
STATION
5+42.68
11+57.33
5+36.58
5+36.79
11+37.41
11+37.51
7+99.34
8+47.90
OFFSET
3.8 L
7.6 L
10.9 L
11.0 R
10.9 L
11.0 R
10.9 L
10.9 L
RIM ELEV.
180.02
182.68
180.21
180.10
181.66
181.68
176.48
176.32
INCOMING PIPES
I=175.91' PROP. CB 1-1I=175.91' PROP. CB 1-2
I=177.43' PROP. CB 2-1I=177.43' PROP. CB 2-2
OUTGOING PIPES
I=175.88' PROP. DMH 1-1I=175.81' PROP. WQS DMH 1-2
I=177.38' PROP. DMH 2-1I=177.33' PROP. WQS DMH 2-2
I=175.98' PROP. BYPASS DMH 1-3
I=176.01' PROP. BYPASS DMH 1-3
I=177.57' PROP. BYPASS DMH 2-3
I=177.61' PROP. BYPASS DMH 2-3
DRAINAGE STRUCTURE TABLE
NAME/TYPE
PROP. DI 3
PROP. DMH 1-1
PROP. DMH 2-1
PROP. WQS DMH 1-2
PROP. WQS DMH 2-2
STATION
10+58.86
5+47.58
11+56.75
5+53.14
11+63.44
OFFSET
10.8 L
15.1 L
19.6 L
7.5 L
13.7 L
RIM ELEV.
178.89
179.79
182.44
179.56
183.00
INCOMING PIPES
I=175.78' PROP. BYPASS DMH 1-3I=175.62' PROP. WQS DMH 1-2
I=177.28' PROP. BYPASS DMH 2-3I=177.14' PROP. WQS DMH 2-2
I=175.77' PROP. BYPASS DMH 1-3
I=177.29' PROP. BYPASS DMH 2-3
OUTGOING PIPES
I=175.52'
I=177.04'
I=175.67' PROP. DMH 1-1
I=177.19' PROP. DMH 2-1
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\0
8 D
rain
age
And
Util
ity P
lans
.dw
g P
rinte
d: 1
/17/
2018
3:5
0 P
M
CO
NTI
NU
ED
ON
SH
EE
T N
O. 1
5
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
13 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
DRAINAGE AND UTILITY PLANS 3
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
20
SCALE: 1" = 20'
0 50 100
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\1
3 C
onst
ruct
ion
Det
ails
.dw
g P
rinte
d: 1
/12/
2018
11:
19 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
14 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION DETAILS 1
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\1
3 C
onst
ruct
ion
Det
ails
.dw
g P
rinte
d: 1
/12/
2018
11:
19 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
15 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION DETAILS 2
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\1
3 C
onst
ruct
ion
Det
ails
.dw
g P
rinte
d: 1
/12/
2018
11:
19 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
DMF
DMF
LB
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
16 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONSTRUCTION DETAILS 3
LAWRENCE STREETIMPROVEMENTS PROJECT
NOTICE OF INTENT SUBMISSION
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\01
KE
Y P
LAN
, GE
N P
LAN
, PR
OFI
LE.d
wg
Prin
ted:
1/2
9/20
18 1
0:12
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
17 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
INDEX, KEY PLAN, AND LOCUS MAP
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\02
BR
IDG
E G
EN
ER
AL
NO
TES
.dw
g P
rinte
d: 1
/29/
2018
10:
15 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2048
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
18 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
BRIDGE GENERAL NOTES
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
.
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\03
BO
RIN
G L
OG
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:17
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
19 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
BORING LOGS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\04
GE
NE
RA
L P
LAN
AN
D E
LEV
ATI
ON
.dw
g P
rinte
d: 1
/29/
2018
10:
20 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
20 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
GENERAL PLAN AND ELEVATION
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\05
DE
MO
LITI
ON
PLA
N A
ND
SE
CTI
ON
.dw
g P
rinte
d: 1
/29/
2018
10:
23 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
21 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
DEMOLITION PLAN AND SECTION
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\06
AB
UTM
EN
T D
ETE
RIO
RA
TIO
N M
AP
PIN
G.d
wg
Prin
ted:
1/2
9/20
18 1
0:26
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
22 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
ABUTMENT DETERIORATION MAPPING
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\07
CO
NC
RE
TE R
EP
AIR
DE
TAIL
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:29
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
23 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
CONCRETE REPAIR DETAILS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
11
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\09
AB
UTM
EN
T P
LAN
AN
D E
LEV
ATI
ON
.dw
g P
rinte
d: 1
/29/
2018
10:
33 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
24 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
ABUTMENT PLAN AND ELEVATION
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\10
AB
UTM
EN
T D
ETA
ILS
.dw
g P
rinte
d: 1
/29/
2018
10:
35 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
25 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
SUBSTRUCTURE DETAILS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\XX
SID
EW
LK F
RA
MIN
G P
LAN
.dw
g P
rinte
d: 1
/29/
2018
10:
51 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
26 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
SIDEWALK PLAN
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\13
SH
EE
TIN
G D
ETA
ILS
.dw
g P
rinte
d: 1
/29/
2018
10:
45 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
27 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
TYPICAL SECTIONS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\11
(S3-
TL4
RA
IL D
ETA
ILS
).dw
g P
rinte
d: 1
/29/
2018
10:
37 A
M
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
28 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
S3-TL4 RAIL DETAILS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\13
HIG
HW
AY
GU
AR
DR
AIL
TR
AN
SIT
ION
DE
TAIL
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:43
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
29 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
HWY. GUARDRAIL TRANSITION DETAIL
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\12
BR
-2 R
AIL
ING
DE
TAIL
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:40
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
30 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
BR-2 RAIL DETAILS
NOTICE OF INTENT SUBMISSION
LAWRENCE STREETIMPROVEMENTS PROJECT
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\12
BR
-2 R
AIL
ING
DE
TAIL
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:40
AM
F:\P
roje
cts\
2015
\150
78\d
wg\
Cur
rent
Des
ign\
NO
I Pla
ns\B
RID
GE
\15
BR
-2 T
ER
MIN
US
DE
TAIL
S.d
wg
Prin
ted:
1/2
9/20
18 1
0:48
AM
NO. REVISIONS
SCALE: DESIGNED BY:
DRAWN BY:
CHECKED BY:PROJECT NO. 15078
AO
AO
BK
AS NOTED
DATE: 1/31/2018
PREPARED BY:
TOWN OF NORFOLKPREPARED FOR:
1 LIBERTY LANENORFOLK, MA 02056
PROJECT:
DATE OF
SHEET NO.
31 31
DRAWING TITLE:
DESIGN SUBMISSION:
Civil and Structural Engineers (978) 923-0400Westford, Massachusetts GreenIntl.com
GREEN INTERNATIONAL AFFILIATES, INC.
BR-2 TERMINUS DETAILS
NOTICE OF INTENT SUBMISSION