C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18
6HX . D O B : 07/03/1983
C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18
6HX . D O B : 07/03/1983
C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18
6HX . D O B : 07/03/1983
BUS STOP
BUS STOPBUS STOP
BUS STOP
TAXI
TAXISTAXIS
BUS STOP
DISABLED
CS6
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
CS6
CS6
North-South Cycle Superhighway (CS6)Section 1 - Farringdon Street
A
PP
Santander Cycle Hire docking station
Signalised pedestrian or pedestrian/cycle crossing
Contrasting coloured surface at informal crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Development not part of consultation
Existing road markings
Existing kerbline removed
Key:
Bus stop
New cycle parkingP
A
Section A-A
ST. BRIDE STREET
HARP ALLEY
OLD FLEET LANE
BEAR ALLEY
FARRINGDON STREET
FARRINGDON STREET
NEWCASTLE CLOSE
TURNAGAIN LANE
STONECUTTER STREET
Loading /disabled bay
Stonecutter Street closed for traffic. Area impacted by another development - not part of this consultation
Consulate parking bay Bus stop bypass for cyclists
Existing loading /disabled bay
Existing taxi parking bay
Relocated motorcycle parking
Relocated taxi parking bay
Stepped cycle track
Stepped cycle track
Existing disabled bay Signalised cycle crossing
Continued on Section 2
Nor
th -
Sout
h C
ycle
Sup
erhi
ghw
ay c
ontin
ues
sout
h to
Ele
phan
t & C
astle
(in
cons
truc
tion)
CS6
CS6
CS6
Direction of Cycle SuperhighwayCS6
HOLB
ORN V
IADU
CT
LOAD
ING
ONLY
MM
KT1
BUS STOPBUS STOP
BUS STOPBUS STOP
BUS STOPBUS STOP
BUS STOPBUS STOP
CLEAR
KEEP
W
W
North-South Cycle Superhighway (CS6)Section 2 - Farringdon Street
Signalised pedestrian or pedestrian/cycle crossing
Area overrunable by traffic
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Development not part of consultation
Existing road markings
Existing kerbline removed
Key:
Bus stop
New cycle parkingP
Contrasting coloured surface at informal crossing
P
Smithfield Market
PLUM
TREE
COUR
T
FARRINGDON STREET
SHOE LANE
FARRINGDON ROAD
CHARTERHOUSE STREET
CHARTERHOUSE STREET
WEST SMITHFIELD
SNOW HILL
HOLB
ORN VI
ADUCT
Relocated taxi bay New bus stop bypassfor cyclists
New bus stop bypassfor cyclists
Waiting areas for right turning cyclists
Early release signals for cyclists on all arms
Loading bay removed
Banned right turn into Charterhouse Street (West)
New signalised pedestrian crossingsacross all arms
Cyclists run with ahead traffic to maximise green time.Turning traffic held back
Loading / disabled bay Parking bay removed
Gaps in segregation to allow connection with Central London Grid, on West Smithfield
Stepped cycle tracksLoading / disabled bay
Continued on Section 3
Connection to proposed Central London Grid- not part of this consultation
Con
tinue
d on
Sec
tion
1
Direction of Cycle SuperhighwayCS6
CS6
CS6
BUS STOP
BUS STOP
BUS STOP
BUS STOP
BUS STOP
BUS STOP
CS6
CS6
BUSLANE
CS6
CS6
CS6
CAR
CLUB
ONL
Y
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
SOLO MOTORCYCLES ONLY
CAR
CLUB
ONL
Y
LOADING
ONLY
FARRINGDON ROAD
SAFFRON HILL
KIRBY STREET
FARRINGDON ROAD
COWCROSS STREET
GREVILLE STREET
LILY PLACE
ST CROSS STREET
GREVILLE STREET
GREVILLE STREET
North-South route continues northboundon Saffron Hill via Greville Street
Segregated cycle tracks
Area impacted by Farringdon Crossrail development - not part of this consultation
Greville Street closed for traffic between Saffron Hill and Farringdon Road
Stepped cycle track
Loading bay removed
New toucan crossing for pedestrians and cyclists
Motorcycle and parking bays relocated to west side
Short section of St Cross Street converted to one-way eastbound
Increased waiting and loading restrictions
Greville Street and Saffron Hill vehicle access only to reduce through traffic
Reverse one-way direction of Kirby Street to northbound
New loading bay
Con
tinue
d on
Sec
tion
2C
ontinued on Section 4C
ontinued on Section 4
Junction priorities changed
CS6
CS6
CS6
CS6
Direction of Cycle SuperhighwayCS6
CS6
CS6
Signalised pedestrian or pedestrian/cycle crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Existing road markings
Existing kerbline removed
Key:
Underground station
Bus stop
National Rail Station
New cycle parkingP
Development not part of consultation
North-South Cycle Superhighway (CS6)Section 3 - Farringdon Road and Saffron Hill
Farringdon Station
Pub
P
For detailed changes to parking, waiting and loading restrictions see accompanying text
CS6
BUSLANE
CS6
BUS
BUS STOP
BUS STOP
BUS STOP
BUSSTOP
STOP
SOLO MOTORCYCLES ONLYDISABLED
PERMIT HOLDER ONLY
CAR
CLUB
ONL
Y
CAR
CLUB
ONL
Y
B
B
CLEARKEEP
CLEARKEEP
FARRINGDON ROAD
ONSLOW STREET
SAFFRON HILL
FARRINGDON ROADFARRINGDON ROAD
HERBAL HILL
ST CROSS STREET
SAFFRON STREET
HATTON WALL
CLER
KENW
ELL R
OAD
CLER
KENW
ELL R
OAD
CLER
KENW
ELL R
OAD
SAFFRON STREET
Relocated bus stop
Footway narrowed
Stepped cycle track
Stepped cycle track
Stepped cycle track
Southbound bus lane removed
Waiting areas for turning cyclists
Early release signals for cyclists on all arms
Banned left turn into Clerkenwell Road (east) except cyclists
Banned left turn into Farringdon Road (north) except cyclists
Relocated bus stop
Relocated bus stop
Zebra crossing removed
Wider footway with cycle-only junction bypass
Loading/ disabled bayshortened by 16 metres
Cont
inue
d on
Sec
tion
3
Continued on Section 5
Continued on Section 5
Connection to proposed Central London Grid- not part of this consultation
Removed parkingCS6
CS6
CS6
CS6
Direction of Cycle SuperhighwayCS6
Signalised pedestrian or pedestrian/cycle crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Existing road markings
Existing kerbline removed
Key:
Bus stop
Bus stop removed or relocated
North-South Cycle Superhighway (CS6)Section 4 - Farringdon Road and Saffron Hill
New signalised junction with pedestrian crossing raised to footway level
Early release signals for cyclists
Section B-B
For detailed changes to parking, waiting and loading restrictions see accompanying text
CS6
CLEARKEEP
CS6
CS6
CS6
North-South Cycle Superhighway (CS6)Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
RAY STREET BRIDGE
RAY STREET
WARNER STREETWARNER STREET
CRAWFORD PASSAGE
HERBAL HILL
FARRINGDON LANE
FARRINGDON LANE
FARRINGDON ROAD
FARRINGDON ROAD
FARRINGDON ROAD
PEAR
TREE
COUR
T
BOWL
ING G
REEN
LANE
BAKER’S ROW
EYE STREET HILL
BACK HILL
Footway widened
Trader parking bay relocated west
Removed parking bay
Herbal Hill raised to footway level
Footway widened
Parking bay lengthened
Parking shortened by 1 metre
Ray Street converted to one way westbound with cycle contraflow
Ray Street Bridge converted to one-way eastbound
Section of Farringdon Lane converted to one-way northbound
Pedestrian crossing relocated 32 metres south and incorporatedinto new signalised junction
Northbound and southbound cyclists join at this point to continue north
Mandatory cycle lanes
Motorcycle parkingSignalised pedestrian or pedestrian/cycle crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Existing road markings
Existing kerbline or speed hump removed
Key:
Santander Cycle Hire docking station
Pub
Continued on Section 6
For detailed changes to parking, waiting and loading restrictions see accompanying text
Increased waiting and loading restrictions
Cont
inue
d on
Sect
ion
4
Cont
inue
d on
Sect
ion
4
CS6
CS6
CS6
Direction of Cycle SuperhighwayCS6
CS6
New signalised junction with controlled pedestrian crossings
Stepped cycle track
PERMIT HOLDERS ONLY
CS6CS6
CS6 CS6
Raised tables replace speed cushions
Parking relocated to allow placement of new raised table
Round top road humps replaced with raised table
Junction priorities changed
Round top road humps replaced with raised table
British Postal Museum and ArchiveCo
ntin
ued
on S
ectio
n 5
Con
tinue
d on
Sec
tion
7
Con
tinue
d on
Sec
tion
6b b
elow
Con
tinue
d on
Sec
tion
6a a
bove
North-South Cycle Superhighway ExtensionSection 6a - Warner Street
Section 6b - Phoenix Place
PHOENIX PLACE
WARNER STREET
MOUN
T PLE
ASAN
T
ROSEBERRY AVENUE
MOUN
T PLE
ASAN
T
PHOENIX PLACE
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Existing tree
Existing road markings
Existing kerbline or speed hump removed
Key:
Direction of Cycle SuperhighwayCS6
CS6
CS6
ACCESSKEEP CLEAR
CS6
CS6
CS6
CS6
CS6
CS6
ONLY
COACHES
Width restriction reconstructed
Section of Pakenham Street closed for traffic to facilitate new two way cycle track
Coach bay raised to footway level
Junction priorities changed
Footway widened
Junction raised to footway level
Footway widened and junction raised to footway level
Footway widened and existing informal crossing replaced with new zebra crossing
Existing round top road humps removed
Existing road humps removedExisting road humps removed
Continued on Inset A
Continued on Section 7b belowC
ontin
ued
on S
ectio
n 6
Continued on Section 8
Continued on Section 7a above
For detailed changes to parking, waiting and loading restrictions see accompanying text
CUBITT STREET
CUBITT STREET
PAKENHAM STREET
PHOENIX PLACE
CUBITT STREET
FLEE
T SQU
ARE
SEDD
ON ST
REET
CALTHORPE STREET
CALTHORPE STREET
CUBITT STREET
WREN STREET
Section 7b - Pakenham Street and Cubitt Street
North-South Cycle Superhighway (CS6)Section 7a - Pakenham Street and Calthorpe Street
Inset A
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island New road markings
Trees
Existing road markings
Existing kerbline or speed hump removed
Key:
New cycle parkingP
Direction of Cycle SuperhighwayCS6
P
CS6
CS6
CS6
CS6
SOLO MOTORCYCLES ONLYSOLO MC/S ONLY
LOOK BOTH WAYS
LOOK
BOTH
WAY
S
LOOK BOTH WAYS LO
OK B
OTH
WAY
S
LOOK BOTH WAYS
LOOK BOTH WAYS
DISABLED DISABLED
BATHURST STREET
Existing round humps replaced with raised pedestrian crossing points
Parking bay length reduced by 3 metres
Existing cycle only facility widened
Early release signal for cyclists
Existing parking bays raised to footway level
Width restriction reconstructed with simple layout and cycle bypassesin both directions
Existing refuge islands removed
New informal crossing
Footway narrowed slightly Footway widened
Westminster Kingsway College
Con
tinue
d on
Sec
tion
9
For detailed changes to parking, waiting and loading restrictions see accompanying text
CS6
CS6 CS6
CS6
CS6
CS6
REGE
NT SQ
UARE
REGENT SQUARE
SIDMOUTH STREET
WES
TKIN
G PL
ACE
SEAF
ORD
STRE
ET
AMPTON STREET
AMPT
ON PL
ACE
GRAY
’S IN
N RO
AD
CUBIT
T STR
EET
SIDMOUTH STREET
SIDMO
UTH
MEW
S
TAVISTOCK PLACE WAKE
FIELD
STRE
ET
WAKE
FIELD
STRE
ET
North-South Cycle Superhighway (CS6)Section 8a - Ampton Street and Sidmouth Street
Section 8b - Sidmouth Street and Tavistock Place
Con
tinue
d on
Sec
tion
7
Con
tinue
d on
Sec
tion
8b b
elow
Con
tinue
d on
Sec
tion
8a a
bove
Signalised pedestrian or pedestrian/cycle crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic islandNew road markings
Trees
Existing road markings
Existing kerbline or speed hump removed
Key:
Santander Cycle Hire docking station
New cycle parkingP
Direction of Cycle SuperhighwayCS6
CS6
CS6
P
ENTRY
NO
DISABLEDDISABLED
DISABLED
CS6
CS6
CS6
CS6
CS6
CS6
CS6
CS6
Zebra crossing relocated south and junction raised to footway level
CSNS route continues on Judd Street
Early release signals for cyclists
Whole junction raised to footway level
Pelican crossing replaced with new zebra crossing
RNIB
For detailed changes to parking, waiting and loading restrictions see accompanying text
HUNTER STREET
TAVISTOCK PLACE
TAVISTOCK PLACE
LEIGH STREET
JUDD STREET
JUDD STREET
EUSTON ROAD
BIDBOROUGH ROAD
BIDBOROUGH ROAD
HASTINGS STREET
HASTINGS STREET
CROMER STREET
CROMER STREET
WAKEFIELD MEWS
Continued on Section 9b below
Continued on Section 9a above
Continued on Section 8
North-South C
ycle Superhighway
meets M
idland Road/ Euston Road
scheme -
subject to separate consultation
P.BOX
WO
LOADING
Signalised pedestrian or pedestrian/cycle crossing
New footway or traffic island
North-South Cycle Superhighway
Existing footway or traffic island
New road markings
Trees
Existing road markings
Existing kerbline or speed hump removed
Key:
Santander Cycle Hire docking station
North-South Cycle Superhighway (CS6)Section 9a - Judd Street & Tavistock Place
Section 9b - Judd Street
Link to Euston Road and Midland Road proposed as part of the Central London Grid (see separate consultation)
Direction of Cycle SuperhighwayCS6
CS6
CS6