a PO Box 392 STIRLING 5152 p 83885520 w www.plotworks.com.au abn 36 614 662 892 NOTICE TO RESIDENTS TRAFFIC MANAGEMENT 9 th August, 2017 Dear Resident Plot Works Pty Ltd has been awarded the contract to complete Hallett Cove Foreshore Upgrade – Stage 5 Amphitheatre. We are writing to advise you that work will be commencing on Monday 14 th August, 2017 and anticipate completion by 30 th December 2017, during this time the traffic will be slightly impacted. Throughout this project we will maintain two-way traffic with speed restrictions to Heron Way, however in approximately the 2 nd week of September to mid October we will initiate the attached Traffic Management Plans. This will involve temporary traffic lights and a detour for traffic from the Northern end of Heron Way. The bus stop for service 683 will be closed at stop 59 and passengers will be required to use stops 58 or 60 during the course of this project. For more information or any concerns regarding the bus service interruptions please contact Lonsdale Customer Service on 81862888. We will endeavour to minimise any disruption to residents due to construction works during this time and apologise for the inconvenience works may cause. If you have any concerns or need any further information please feel free to contact our office on 83885520 or the City of Marion on 83756600. Yours sincerely Christopher Prentice Director Plot Works Pty Ltd

NOTICE TO RESIDENTS TRAFFIC MANAGEMENT

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

   a        PO Box 392 STIRLING  5152 p        83885520 w       www.plotworks.com.au abn    36 614 662 892 

    

NOTICE TO RESIDENTS TRAFFIC MANAGEMENT

9th August, 2017

Dear Resident

Plot Works Pty Ltd has been awarded the contract to complete Hallett Cove Foreshore Upgrade – Stage 5 Amphitheatre.

We are writing to advise you that work will be commencing on Monday 14th August, 2017 and anticipate completion by 30th December 2017, during this time the traffic will be slightly impacted.

Throughout this project we will maintain two-way traffic with speed restrictions to Heron Way, however in approximately the 2nd week of September to mid October we will initiate the attached Traffic Management Plans. This will involve temporary traffic lights and a detour for traffic from the Northern end of Heron Way.

The bus stop for service 683 will be closed at stop 59 and passengers will be required to use stops 58 or 60 during the course of this project. For more information or any concerns regarding the bus service interruptions please contact Lonsdale Customer Service on 81862888.

We will endeavour to minimise any disruption to residents due to construction works during this time and apologise for the inconvenience works may cause.

If you have any concerns or need any further information please feel free to contact our office on 83885520 or the City of Marion on 83756600.

Yours sincerely

Christopher Prentice Director Plot Works Pty Ltd 

Dutchman Dr

Hero

n W

ay

Heron Way

Grand Central Ave

Marin

e A

ve

Hero

n W

ay

DETOUR OVERVIEW

15m min

15m min

15m min

15m min

15m min

25PREPARE TO STOP

25PREPARE TO STOP

25PR

EPAR

E TO

STOP

25PR

EPAR

E TO

STOP

25ROADWORK AHEAD

ENDROADWORK50

25ROADWORK AHEAD

50END

ROADWORK

25

ROAD

WOR

K AH

EADE

ND

RO

AD

WO

RK

50

25

ROAD

WOR

K AH

EAD5

0E

ND

RO

AD

WO

RK

STO

PH

ER

EO

N R

ED

SIG

NA

L

STOPHEREON REDSIGNAL

DETOUR

ROAD CLOSED

ROAD CLOSED AHEAD

NOENTRY

ROAD CLOSED

WATCH

YOUR

STEP

WA

TCH

YO

UR

STE

P

DETOUR

DETOUR

DETOUR

DE

TOU

R

DETOUR

Title : The PlotRoad Repair Works

Notes :- This Traffic Management Plan was developed by competent and experienced persons and in accordance with the

requirements outlined in Australian standard - AS1742.3. Before the commencement of Routine Services or anyOrdered Works Altus will carry out a Risk Assessment and develop controls, measures and plans to identify, eliminate or mitigate any hazards.

- This Plan was developed to allow for the safe movement of vehicular and pedestrian traffic around the worksite,the protection of workers from passing traffic, the provision for access to properties located within the limits ofthe worksite, the implementation, maintenance and removal of any necessary temporary roadways and detours,the provision of traffic controllers, the installation of temporary signs, temporary road delineation, and any othersafety measures or controls such as safety barriers when required.

- Altus Traffic does not accept responsibility for compliance of this plan when implemented or monitored by externalparties. On request Altus Traffic will provide people, materials, resources and systems to properly perform theservices related to the implementation of the traffic management plan.

- Altus Traffic Controllers will wear high-visibility outer garments and the appropriate Personal Protective Equipmentcomplying Australian OH&S Standards. All vehicles used in traffic control operations will be equipped with theappropriate vehicle mounted warning devices, first aid kits and fire extinguishers.

- This plan is not to scale and is a representation only after a worksite traffic management checklist is completed on site changes may be made by accredited persons. All amendments will be outlined and recorded in a worksite diary.

Company: The PlotSite Contact: Evelyne Abrahams

Phone No: 0438 181 374

Works commence:

Onsite:Completed by:

Traffic Controllers will be onsiteto assist motorists and pedestrians

when required.

Pedestrian signage will be usedwhenever the worksite extends

to footpaths

Date : 08/08/2017

Sheet No.: 1 of 1Revision:Drawing No.:

Reference:

Author: Santosh Rochlani

Location: Heron Way, Hallett Cove SA

LegendWork Area

Cone

Parawebbing

Bollard

Water Filled Barrier

www.invarion.com

Dutchman Dr

Hero

n W

ay

Heron Way

Grand Central Ave

Marin

e A

ve

Hero

n W

ay

DETOUR OVERVIEW

15m min

15m min

15m min

15m min

15m min

25PREPARE TO STOP

25PREPARE TO STOP

25PR

EPAR

E TO

STOP

25PR

EPAR

E TO

STOP

25ROADWORK AHEAD

ENDROADWORK50

25ROADWORK AHEAD

50END

ROADWORK

25

ROAD

WOR

K AH

EADE

ND

RO

AD

WO

RK

50

25

ROAD

WOR

K AH

EAD5

0E

ND

RO

AD

WO

RK

STO

PH

ER

EO

N R

ED

SIG

NA

L

STOPHEREON REDSIGNAL

DETOUR

ROAD CLOSED

ROAD CLOSED AHEAD

NOENTRY

ROAD CLOSED

WATCH

YOUR

STEP

WA

TCH

YO

UR

STE

P

DETOUR

DETOUR

DETOUR

DE

TOU

R

DETOUR

Title : The PlotRoad Repair Works

Notes :- This Traffic Management Plan was developed by competent and experienced persons and in accordance with the

requirements outlined in Australian standard - AS1742.3. Before the commencement of Routine Services or anyOrdered Works Altus will carry out a Risk Assessment and develop controls, measures and plans to identify, eliminate or mitigate any hazards.

- This Plan was developed to allow for the safe movement of vehicular and pedestrian traffic around the worksite,the protection of workers from passing traffic, the provision for access to properties located within the limits ofthe worksite, the implementation, maintenance and removal of any necessary temporary roadways and detours,the provision of traffic controllers, the installation of temporary signs, temporary road delineation, and any othersafety measures or controls such as safety barriers when required.

- Altus Traffic does not accept responsibility for compliance of this plan when implemented or monitored by externalparties. On request Altus Traffic will provide people, materials, resources and systems to properly perform theservices related to the implementation of the traffic management plan.

- Altus Traffic Controllers will wear high-visibility outer garments and the appropriate Personal Protective Equipmentcomplying Australian OH&S Standards. All vehicles used in traffic control operations will be equipped with theappropriate vehicle mounted warning devices, first aid kits and fire extinguishers.

- This plan is not to scale and is a representation only after a worksite traffic management checklist is completed on site changes may be made by accredited persons. All amendments will be outlined and recorded in a worksite diary.

Company: The PlotSite Contact: Evelyne Abrahams

Phone No: 0438 181 374

Works commence:

Onsite:Completed by:

Traffic Controllers will be onsiteto assist motorists and pedestrians

when required.

Pedestrian signage will be usedwhenever the worksite extends

to footpaths

Date : 08/08/2017

Sheet No.: 1 of 1Revision:Drawing No.:

Reference:

Author: Santosh Rochlani

Location: Heron Way, Hallett Cove SA

LegendWork Area

Cone

Parawebbing

Bollard

Water Filled Barrier

www.invarion.com