NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin Multipoint Thomson Scattering (MPTS) Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI KBSI KAIST POSTECH ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec George Labik M. Denault, H. Feder , M. Smith Princeton Plasma Physics Laboratory NSTX Upgrade Project Final Design Review LSB, B318 June 22-24, 2011

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

Embed Size (px)

Citation preview

Page 1: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1

NSTXNSTX Supported by

College W&MColorado Sch MinesColumbia UCompXGeneral AtomicsINELJohns Hopkins ULANLLLNLLodestarMITNova PhotonicsNew York UOld Dominion UORNLPPPLPSIPrinceton UPurdue USNLThink Tank, Inc.UC DavisUC IrvineUCLAUCSDU ColoradoU IllinoisU MarylandU RochesterU WashingtonU Wisconsin

Multipoint Thomson Scattering (MPTS)

Culham Sci CtrU St. Andrews

York UChubu UFukui U

Hiroshima UHyogo UKyoto U

Kyushu UKyushu Tokai U

NIFSNiigata UU Tokyo

JAEAHebrew UIoffe Inst

RRC Kurchatov InstTRINITI

KBSIKAIST

POSTECHASIPP

ENEA, FrascatiCEA, Cadarache

IPP, JülichIPP, Garching

ASCR, Czech RepU Quebec

George LabikM. Denault, H. Feder , M. Smith

Princeton Plasma Physics LaboratoryNSTX Upgrade ProjectFinal Design Review

LSB, B318June 22-24, 2011

Page 2: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS CSU

2

•The MPTS is a multi-time, multi-spatial point Thomson Scattering diagnostic for measuring the electron temperature and density profiles on the National Spherical Torus Experiment (NSTX) ST research facility. In 2009 the US Department of Energy approved the initiation of a project to upgrade the NSTX for approved performance. As a result, a new larger Center stack (CS) is being designed to provide enhanced operating capabilities. It is necessary to upgrade the MPTS to accommodate the new CS and provide MPTS coverage of NSTX Upgrade plasma operation.

The vacuum boundaries closest to the vacuum vessel (VV) define the extent of this design review . Vacuum boundaries include torus interface valves, vacuum windows and blank covers. The Bay L port includes a number of diagnostics vacuum interfaces besides MPTS since they impact the port design but are not themselves part of this review.

The VV interfaces cost is estimated at $967 K .The installation is to be completed in mid 2013. The cost and schedule details are covered in the project summary elsewhere.

A successful PDR was conducted on 9 May 2011.

The MPTS VV FDR is planned for late August 2011.

Page 3: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS CSU 3

The ex vessel components which define the remainder of MPTS is a separate job. The work approval form has been submitted for management review and approval.

The MPTS vacuum vessel modification at Bay L resulted in a design incorporating reinforcement of the VV at Bay JKLA, the MPTS FDR will include the optimization of the Bay L vacuum vessel reinforcement required to mitigate stresses from the upgrade enhanced operation. The optimization is proceeding in response to a chit from the PDR concerning the effect of the reinforcement on the Resistive Wall Mode (RWM) coils performance.

Page 4: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – System and Collecting Optics 4

Page 5: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Isometric View- Vessel Section 5

•Laser

•Laser input •Vacuum interface

•Collection Optics•Box

•Bay F

•Bay L

•Background CHERS•Field of View

•FIReTIP

•TIV

•Bellows

•Ceramic •Break

Page 6: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

NSTX Test Cell 6

•N•Bay L

•Bay F

•Laser Optics Box

•Laser Dump

Page 7: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – X Section 1 of VV – Overlay New and Existing Laser Centerlines 7

•Existing Lasers Path

•New Lasers Path

Page 8: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS-X Sect 2 VV – Overlay New and Existing Laser Centerlines 8

Page 9: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS-X Sect 3 VV-Overlay of New and Existing Laser Centerlines 9

Page 10: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS _ Test Cell and Vacuum Vessel 10

•Laser flight tube

•Bay L TIV and Structural Support

•Laser Optics Box

Page 11: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS-Test Cell looking South West_ Laser Dump 11

• MPTS – View Looking South _ Bay L and Laser External Dump

•Bay L

•Laser dump

•Machine vacuum

•Vacuum window

•Remote ly Operable•Laser Mirrors

Page 12: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Laser input _ VV Interface 1 12

•Lasers VV Interface

•Calibration probe •VV Interface

•Collection Optics Box

•Fiber Bundles

•Fiber Array

•Vacuum Window•And Aperture

•Bay F

Page 13: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Laser VV Interface 2 13

•Elliptical Plug •1.5 Inch Thk.

•Fiber Array •Adjustment and Support

Page 14: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Vessel Laser Input and Calibration Probe Port 14

Page 15: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS _ Vacuum Vessel Cross Section _ Laser Input 15

Page 16: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS _ Laser and Background CHERS 16

•Background CHERS •Field of view

•Bay L •VV Interface

•Upgrade Center Stack

Page 17: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Laser Spacing 17

•RWM Coils •Vertical Members

•1.5 inches additional toroidal space provided

Page 18: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS _ Bay L Port 18

Page 19: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Bay L 19

•MPTS•High K •scattering

•Back•CHERS

•FIReTIP

•TIV

•El Break

•Bellows

•SPRED

•XEUS

•12 inch OD•Tube

Page 20: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Bay L 20

•Laser dump tube

•Steering•Mirror

Page 21: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – VV Mid Plane X Section 21

Page 22: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

22

•Typical i/2 inch thick plate •On vessel shell

•Reinforcement components

•Typical cutout for PF coils

•L

•K

•J

•A

•Existing •FIDA Diagnostic

•Bridging Bar •3 x 4 inches

Page 23: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

23

•Reinforcement components

•L•K •A

•J

•Typical ½ thick plate •On vessel shell

Page 24: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

24

Page 25: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

25

Page 26: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

26

Page 27: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS – Bay L Platform 27

Page 28: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS-Bellows 28

Page 29: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

MPTS _ Mitered 90 Degree Ell _ Steering Mirror 29

Page 30: NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL

NSTX Upgrade Project – Final Design Review June 22 - 24, 2011

NSTX VV Typical Port Weld Detail 30