16
Jimmy Winkler SRNS Senior Technical Advisor Briefing for the DOE EM Robotics Team December 8, 2015 Nuclear Materials Management H Canyon and HB Line Processing K Area Plutonium Storage L Area Spent Fuel Storage

Nuclear Materials Management

Embed Size (px)

Citation preview

Page 1: Nuclear Materials Management

Jimmy WinklerSRNS Senior Technical Advisor

Briefing for the DOE EM Robotics Team

December 8, 2015

Nuclear Materials Management

H Canyon and HB Line Processing

K Area Plutonium Storage

L Area Spent Fuel Storage

Page 2: Nuclear Materials Management

2

Agenda

• Overview of facilities and possible application for advanced robotics

– H Canyon

– HB Line

– L Area

– K Area

Page 3: Nuclear Materials Management

3

Savannah River Site

SRNS – Savannah River Nuclear SolutionsSRR – Savannah River RemediationMOX – Mixed Oxide

• 310 square miles

• Major site contractors: SRNS, SRR

• Located on site: – Savannah River National Laboratory

– 5 reactor areas (not operational)• Materials Storage Facility (K Area)

• Spent Fuel Storage (L Area)

– 2 chemical separations facilities (1 operational)• H Canyon

• HB Line

– 2 waste storage tank areas

– 2 waste processing facilities

– Tritium facility

– MOX Fuel Fabrication Facility

• Many facilities were constructed in the 1950’s

Page 4: Nuclear Materials Management

Nuclear Materials Disposition Process

4FRR – Foreign Research Reactor DRR – Domestic Research Reactor WIPP – Waste Isolation Pilot Plant AFS – Alternate Feed StockSNF – Spent Nuclear Fuel MOX – Mixed Oxide

Page 5: Nuclear Materials Management

5

H Canyon

• Built between 1951 and 1954

And began operating in 1955.

• Recovers uranium from spent

reactor fuels.

• Also has recovered Neptunium

and Plutonium.

• About 1000’ x 120’ x 75’ .

• Two canyons – Hot and warm

each divided into 18 sections.

• No entry permitted into the Hot Canyon due to radiation rates and limited entries into the Warm Canyon.

• All work in canyons performed by overhead cranes.

• Use of nitric acid in processing has degrade concrete in some areas.

Page 6: Nuclear Materials Management

6SRNS – Savannah River Nuclear Solutions

H Canyon Cross Section

10-23-0101E03053-38

CANYON CROSS SECTION

AIROUT

GANGVALVES

CELL COVER

HOT CANYON

CRANE

CAB

SAMPLEAISLE

AIRIN

ELECTRICAL

CONTROL ROOM

COLDFEEDTANKS

COLD PIPING

MISC EQUIPMENT& STORAGE

SAMPLEAISLE

AIRIN

AIR OUT

GANGVALVES

WARM CANYON

CRANE

CAB

Page 7: Nuclear Materials Management

7

Warm Canyon with Cell Covers Removed

Page 8: Nuclear Materials Management

8

Hot Canyon Crane

Crane Control Room

Hot Crane just outside of the crane maintenance area

Page 9: Nuclear Materials Management

9

H Canyon Process Air Exhaust Tunnel – looking west

Page 10: Nuclear Materials Management

10SRNS – Savannah River Nuclear SolutionsDOE – Department of Energy

Potential Robotics Applications in H Canyon

• Removal of concrete degradation products from canyon cells and sumps and in-cell repair of concrete walls.

• Inspection and repair of canyon structures such as the Canyon Air tunnel or exhaust stack.

• Size reduction of failed canyon equipment to reduce waste volume.

• Transfer of high dose material from shipping drums into fuel tubes.

• Inspect and repair piping in difficult to access locations such as confined spaces.

• Interior inspection of piping.

• Waste drum movements and assay.

• Emergency response to chemical and/or radiological solution spills.

Page 11: Nuclear Materials Management

11

HB Line

• Built in early 1980’s and began

operating in 1955.

• Recovers neptunium and

plutonium from solution.

• Sits atop H Canyon

• Most operations are hands-on

Inside glove boxes with little

potential for application of robotics.

Page 12: Nuclear Materials Management

12

K Area Complex Plutonium Storage

• Originally built as a production reactor, it was refurbished at the

end of the cold war to store excess Pu.

• It also contains one glovebox to examine

Pu storage containers to ensure

continued safe storage.

• Provides plutonium metal feed to HB Line

for conversion to oxide. Plutonium oxide

Is then shipped back to K Area.

Pu Storage containers

Page 13: Nuclear Materials Management

13

Potential Robotics Applications in K Area

• Movement and stacking of drums in the material storage area to improve safety and reduce radiation dose to workers.

• Semi-autonomous inspection and scanning of building structures and components.

• Unpacking high-risk plutonium storage drums.

• Movement of drums of heavy water.

Heavy water drum storage

Page 14: Nuclear Materials Management

14

L Area Spent Fuel

SRNS – Savannah River Nuclear Solutions

• Originally built as a production reactor, now only the fuel basin is used to receive and store US origin spent nuclear fuel from both foreign and domestic research reactors.

• Also ships fuel to H Area for dissolution and recovery of uranium.

Fuel bundle being placed in a storage rack(all work is done underwater for shielding)

Page 15: Nuclear Materials Management

15

Potential Robotics Applications in L Area

Cask decontaminationand surveying

• Fuel integrity inspections during storage

• Fuel inspections before opening a transportation package (enter package through vent/drain ports)

• Building inspections similar to K Area including underwater

• Nuclear Material Accountability of dry fuel storage area

• Underwater Cask lid bolt removal

• Inspection of Basin water filtration system

• Emergency response radiological events.

Page 16: Nuclear Materials Management

16

Summary

• Many applications of robotics in H, K and L Areas

• Remove personnel from hazardous environments

• Perform repetitive tasks to reduce human error