Objective ATC 17

ESSIP Plan 2013

Luca DELL’ORTODSS/EIPR

13.09.2013

Page 2: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

2

Comprehensive Explanation

Target Date: 12/2018 SCOPE: ECAC – All States except SK

Electronic dialogue as automated assistance to controller during coordination and transfer addresses the facilities and processes between ATC components serving ATC units.

ATC17 complements ITY-COTR. Purpose:

Co-ordination prior to the transfer of flights from one ATC unit to the next;

Transfer of communication from one ATC unit to the next ATC unit of such flights;

Support the exchange of OLDI messages related to the Basic procedure and, if applicable, SSR Code Assignment Message.

ESSIP Plan 2013 / Objective ATC17

Page 3: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

3

What is new or has changed for ESSIP Plan ed. 2013

Change in the applicability area: removal of SK

ESSIP Plan 2013 / Objective ATC17

Page 4: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

4

Link to European ATM Master Plan and/or Interim Deployment Programme (IDP)

Eur. ATM Master Plan:[CM-0201] – Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue - ESSENTIAL

IDP:WP 5.2

ESSIP Plan 2013 / Objective ATC17

Page 5: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

5

Most important SLoA(s)

All

Note: whereas this objective is defined with an ECAC scope, it will be the decision of the individual ATS Provider to: define its local applicability in terms of relevant ATSUs, and identify the processes to be implemented (refer to ATC17 SLoAs and in

particular, their finalisation criteria, for the complete list of processes).

ESSIP Plan 2013 / Objective ATC17

Page 6: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

6

Finalisation Criteria and Closed Questions

For REG01: Formal acceptance by NSA of the proposed changes

For ASP01: Deliver safety arguments for all changes related to implementation of electronic

dialogue for Coordination and Transfer.

For ASP02/3/4 (important to clearly identify ATSUs involved and which processes are implemented):

Ground systems updated Technical File with evidences of compliance to EC Declaration of Verification; Functions (form the list in it he individual SLoAs) documented and in operational use.

For ASP05: Training plans updated and training package developed by the ANSP for the use of

electronic dialogue procedure.

ESSIP Plan 2013 / Objective ATC17

Page 7: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

7

Supporting Material

EUROCONTROL-Specification for On-Line Data Interchange (OLDI) Edition 4.2 (OJEU Reference 2011/C 146/05)

EUROCONTROL-System Supported Coordination (SYSCO) Implementation Guidelines

ESSIP Plan 2013 / Objective ATC17

Page 8: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

8

ESSIP Report 2012

Objective introduced in the ESSIP Plan in 2012. No ANSPs have reported it as completed; 6 reported it partially

completed (functionalities available and ATCOs trained but not implemented operationally). This requires agreement with neighbouring ACCs where the same functionalities must be available.

From the reported ANSP plans, the current estimate for achievement is 12/2016 for 80% of the applicable area.

ESSIP Plan 2013 / Objective ATC15

Page 9: Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

9

Links and contacts

Objective Coordinator: Dell’Orto Luca, +32 2 729 3325

[email protected]

EUROCONTROL Objective Expert:

Stephen Morton, +32 2 729 3492

[email protected]

ESSIP Plan 2013 / Objective ATC17