Objective SAF11

ESSIP Plan 2013

Ingrid FEIJTDSS/EIPR

13.09.2013

Page 2: Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

ESSIP Plan 2013 / Objective SAF11 2

Comprehensive Explanation

Implementation of the recommendations and guidance materials contained in the European Action Plan for the Prevention of Runway Excursions (EAPPRE) with the aim of reducing the rate of runway excursions and the runway excursion risk incumbent upon them.

Based on the Study of Runway Excursions from an European Perspective.

Study findings made extensive use of lessons from more than thousand accident and incident reports.

Page 3: Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

Supporting Material

European Action Plan for the Prevention of Runway Excursions (EAPPRE)

ESSIP Plan 2013 / Objective SAF113

Page 4: Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

Objective Coordinator’s Analysis, Recommendations, Tips & Tricks

SLoAs are generic so “Progress” is not enough

Need to add LAs specifying actions taken/planned: Oversight activities arrangements established, e.g. audit plans, audit

report published including corrective actions if applicable. Or make reference to national document dealing with this.

ESSIP Plan 2013 / Objective SAF11 4

Page 5: Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

Contacts

Objective Coordinator: FEIJT, Ingrid +32 2 729 5044

[email protected]

DNM Objective Expert(s): LAWRENCE, Richard +32 2 729 3029

[email protected]

ESSIP Plan 2013 / Objective SAF11 5