1 Environmental Satellite Processing System (ESPC) Critical Infrastructure Protection (CIP) Fail-over Update Office of Satellite Products and Operations National Oceanic and Atmospheric Administration NOAA Satellite and Information Service 1 4/28/2010 1:22 PM

Office of Satellite Products and Operations National Oceanic and Atmospheric Administration

Embed Size (px)

DESCRIPTION

Environmental Satellite Processing System (ESPC) Critical Infrastructure Protection (CIP) Fail-over Update. Office of Satellite Products and Operations National Oceanic and Atmospheric Administration NOAA Satellite and Information Service. 4/28/2010 1:22 PM. 1. CIP Project Overview. - PowerPoint PPT Presentation

Citation preview

1

Environmental Satellite Processing System (ESPC) Critical Infrastructure

Protection (CIP) Fail-over Update

Office of Satellite Products and OperationsNational Oceanic and Atmospheric Administration

NOAA Satellite and Information Service

1

4/28/2010 1:22 PM

2

CIP Project Overview

• ESPC/CIP) is a phased implementation:– Phase 1 – CEMSCS (POES)– Phase 1.5 – Metop– Phase 2 – SATEPS (GOES)– Phase 3 – SATEPS, Fail-over Test, Documentation

• Product Priority:– Phase 1 and 1.5:

• Critical Products determined by users• Priority 1 = 24 hour RTS• Priority 2 = 48 hour RTS• Priority 3 = No CIP Requirement

– Phase 2 and 3:• Critical Products determined by Products Group• Priority 0 = 2 hour RTS• Priority 1 = 24 hour RTS• Priority 2 = 48 hour RTS• Priority 3 = No CIP Requirement

3

Critical Infrastructure Protection (CIP) Failover Testing

– ESPC-CIP proof of concept test March 2010- Completed

– Planned ESPC-CIP failover test May 2010- Delayed due to customer impact on products not included in CIP and technical issues

– Efforts Underway to ensure user concerns are addressed prior to executing failover:

– Identified path forward for the operational implementation of IASI and ACSAT at CIP (end of June 2010)

– Identifying alternative data sources for products not supported by CIP

– Technical Issues:

– Bandwidth Measurements indicate a communications upgrade will required (August/September)

– ESPC Management to review the detailed test plans when delivered (end of May)

– Work with customers to identify target dates (Aug/Sep)

– ORR and CR will occur following successful fail-over

4

NESDIS Consolidated Products List (Operational)

5

Critical Products Not Supported at CIP

– NOAA Satellite Data/Products• IASI*• ASCAT*• Product Archive System• Volcano Products

– NON-NOAA Satellite Data/Products• EOS• MODIS• AIRS• AMSR-E• Okeanos (SEAWIFS)

– Other Data/Products• OSEI• TOMS• Tropical Cyclone Formation Potential (Genesis Parameter)• ETraP• OMI/SO2• CATTS BRAMM• GOES/POES Blended

*Plans underway to add IASI and ASCAT to the CIP by end of July 2010