Officer in Charge of Construction Marine Corps Installations West. 144 Active MILCON/M2R2 projects for $1.1B MCB Camp Pendleton: 68 projects ~ $677M MCAS Pendleton: 6 projects ~ $19.4M MCAGTFTC Twentynine Palms: 31 projects ~ $184M MCAS Miramar: 14 projects ~ $85.6M - PowerPoint PPT Presentation

Citation preview

Page 1: Officer in Charge of Construction  Marine Corps Installations West

1 OICC MCIWEST

Officer in Charge of Construction Marine Corps Installations West

Page 2: Officer in Charge of Construction  Marine Corps Installations West

2 OICC MCIWEST

Page 3: Officer in Charge of Construction  Marine Corps Installations West

3 OICC MCIWEST

OICC MCIWEST “In Box”

144 Active MILCON/M2R2 projects for $1.1B• MCB Camp Pendleton: 68 projects ~ $677M

• MCAS Pendleton: 6 projects ~ $19.4M• MCAGTFTC Twentynine Palms: 31 projects ~ $184M• MCAS Miramar: 14 projects ~ $85.6M• MCAS Yuma: 17 projects ~ $74.4M• MCLB Barstow: 6 projects ~ $14.5M• MCLB Bridgeport: 2 Projects ~$3.5M

Page 4: Officer in Charge of Construction  Marine Corps Installations West

4 OICC MCIWEST

OICC MCIWEST Programs

Grow the Force - $3,000,000,000

(That’s $3.0 Billion)

Bachelor Enlisted Quarters – 49 BEQs $1.7B

Page 5: Officer in Charge of Construction  Marine Corps Installations West

5 OICC MCIWEST

West Project Laydown FY0942 Projects $1.1B

1 Project @ $19M

4 Projects @ $146M

8 Projects @ $120M

26 Projects @ $800M

09

09 09 09

09 09 09 09 09

09 09 09 09 09

1 Project @ $8M

BEQ Project

Other MILCON Project

09

09 09 09 09 09

09 09 09 09

Page 6: Officer in Charge of Construction  Marine Corps Installations West

6 OICC MCIWEST

West Project Laydown FY1052 Projects $1.5B

2 Projects @ $29M

21 Projects @ $536M

3 Projects @ $80M

2 Project @ $36M

10

22 Projects @ $1105M

10 10

BEQ Project

Other MILCON Project

102 Projects @ $7M

MCMWTC Bridgeport

Page 7: Officer in Charge of Construction  Marine Corps Installations West

7 OICC MCIWEST

Grow The Force Initiative

Page 8: Officer in Charge of Construction  Marine Corps Installations West

8 OICC MCIWEST

BEQ Initiative• The Old:

– 1950’s BEQs

– Open Bays, Gang Heads

Page 9: Officer in Charge of Construction  Marine Corps Installations West

9 OICC MCIWEST

Best of BreedExterior• Positive, home-like appearance• Building masses broken up into smaller

portions, creating more of a campus like and community feel

• Breezeways• Sports courts, BBQs• Complies with BEAP

Interior• Hotel-like lobby at the entrance to the

building• Maximize natural ventilation in sleeping

rooms• Maximize storage space• Telephone, cable and satellite TV• Enhanced activity centers with gaming,

internet, big screen TV, laundry rooms• Ceiling fans, color schemes

BEQ Initiative• The New:

Page 10: Officer in Charge of Construction  Marine Corps Installations West

10 OICC MCIWEST

Buildings• LEED Silver Certification required for all FY09 new construction projects or renovation > 50% PRV

• 3 LEED Silver Certified projects to be completed by summer 2009

• MCCS Temporary Lodging Facility 14% more efficient than Title 24 requirements, 30% water use reduction

Wastewater• P-002 Southern Region Tertiary Treatment Plant – capable of treating 5 MGD

• MCB P-110 Wastewater and Reclaimed Water Conveyance Systems saving 100 MGY using recycled water for irrigation

Green Initiatives

Page 11: Officer in Charge of Construction  Marine Corps Installations West

11 OICC MCIWEST

Water• MCAS Miramar is saving 30 million gallons of potable water per year by using recycled water for irrigation, dust control, construction use

• Irrigation accounts for 60% of water load at Miramar. Converting to a central irrigation control system which monitors and accounts for rain fall has cut irrigation expense by half

Power• Installation of 23kW PV array to reduce net power consumption

• Solar powered speed limit sign installation in housing areas

• Installation of 5KV photovoltaic system to gym facility offsets power requirements from grid

Green Initiatives

Page 12: Officer in Charge of Construction  Marine Corps Installations West

12 OICC MCIWEST

Green Initiatives

Wind Turbine• 1.5MW • $6.1M / $1.5M SCE rebates

Photovoltaic Lights• 50 PV Lights on Base