Page 1: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

1 / 22

OFFSHORE & ONSHORELIQUEFIED NATURAL GAS PROJECTS

Page 2: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

2 / 22

INTRODUCTIONMajor offshore projects: Kashagan Oil Field Development Project – Offshore Civil Works and FGP-CaTRo Channel Works in Kazakshtan

Major onshore projects:

• Kashagan Oil Field Development Project – Onshore Civil Works in Kazakshtan

• Sakhalin I Chayvo Onshore Oil Processing Facility and Sakhalin II Onshore Processing Facility in Russia

Offshore management capacity: ENKA has been operating as independent ISM registered Marine organization since 2010. Most of the ENKA Marine fleet are registered to the Offshore Vessel Inspection Database (OVID) and are operated in compliance with international oil & gas industry standards.

Liquefied Natural Gas (LNG) projects: Since 2004, ENKA Group company named Cimtas Pipe has successfully been delivering over 110,000 tons of prefabricated pipe spools to several LNG projects globally. Cimtas Pipe has been providing Integrated Piping Solutions with an extensive range of LSAW pipes, fittings, and pipe spools to its top-tier customers, from a single location.

2 / 22

Page 3: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

3 / 22

Oil Field Development of Caspian Sea

PROJECT LOCATION

Kashagan - Kazakhstan

CLIENTAgip KCO

ER SAI Caspian Contractor LLP

North Caspian Operating Company N.V.

CONSTRUCTION PERIOD1998 - Current

PROJECT VALUEUS$ 2 Billion

1998 EPC construction of Bautino supply base

1998-1999 Supply of graded rock for appraisal berms

1999-2000 Expansion of OKIOC Bautino supply base

2001-2004 Infrastructure upgrade works in Bautino

2005 Construction of Cuttings Pits in Koshken

2006 Supply of High Density Rock (HDR), EPC loading & berthing facility in Saritash

2008 Supply of sheet pile materials

2015-2017 Logistic Support activities for offshore

2015-2017 Pre fabrication works for offshore installations

2017-Current Logistic Support activities for offshore

ONSHORE WORKS

2001-2004 OKIOC Contract 2000-278: Offshore Civil Works 2005-2012 Contract 2004-1372 Offshore Civil Works

D Complex ConstructionA Island Construction3 ea. EPC Islands6 ea. Berms10 ea. IPS (Ice Protection Structures)4 ea. IRG (Ice Rubble Generators)3 ea. DC Islands for Full Field Development

2015-2016 D Complex Civil Modification WorksA Island Civil Modification WorksOnshore & Trench Dredging activities

2016-2017

2017-Current

EPC-3 Topside WorksEarly Works, Site Preparation, Load-in, Installation, Hook-up, Mechanical Completion, Pre-commissioning and CommissioningCurrently, ENKA is providing Marine Operations Services and Vessel/Equipment Rental

OFFSHORE WORKS

Page 4: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

4 / 22

KASHAGANOil Field

Development

Page 5: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

5 / 22

D COMPLEX

A ISLAND

DC-01 ISLAND

DC-05 ISLAND

DC-04 ISLAND

EPC-3 ISLAND

EPC-4 ISLAND EPC-2 ISLAND

Page 6: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

6 / 22

A-island And D-island ConstructıonProjects (2015-2016)

Page 7: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

7 / 22

EPC-3 TOPSIDE WORKS (2016-2017)

Page 8: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

8 / 22

ENKA Marine Base (Bautino)ENKA Marine Base is located in Bautino Bay:

• Available 350 m Jetty

• 56,000 m2 storage area

• Weighbridge and Loading Bridge

• Passenger Transfer Office (Custom)

• Workshop for Precast Fabrication

• Marine Mechanical Workshop

• Welding Workshop

Page 9: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

9 / 22

FGP-CaTRo Channel Works of Caspian Sea

PROJECT LOCATIONProrva - Kazakhstan

CLIENTVan Oord

TenizService LLP /Chevron

CONSTRUCTION PERIODOctober 2014 – October 2018

PROJECT VALUEUS$ 103.4 Million

ONSHORE WORKS2014 - 2017 Van Oord Contract - Marine Fleet and Logistic Services

2017 - 2018 Marine Installation Works (Mooring Piles, Fenders, CommunicationPlatforms) Preparation works - onshore

OFFSHORE WORKS

2014 - 2017 Van Oord Contract - Marine Fleet and Logistic Services

2017 - 2018 Marine Installation Works (Mooring Piles, Fenders, Communication Platforms)

Page 10: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

10 / 22OFFSHORE MANAGEMENT CAPACITY

Page 11: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

11 / 22

Accommodation Vessels

F/H “NAVRUZ”Non-self propelled Accommodation Vessel

Dimensions : 112 x 13.8 m

Max. draft : 3.10 m

POB : 300 person

SPV “SAKARYA”Special Purpose Vessel

Dimensions : 49.9 x 9.56 m

Max. draft : 3.20 m

POB : 74 person

Page 12: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

12 / 22

Supply Vessel “YAGUAR”Dimensions : 54.86 x 12.19 m

Max. draft : 3.20 m

POB : 42 person

Fuel: 173 m3

Fresh Water: 169 m3

Sewage: 141 m3

Supply Vessel “FIRAT”

Dimensions : 52.65 x 11.58 m

Max. draft : 3.30 m

POB : 42 person

Fuel: 460 m3

Fresh Water: 131 m3

Sewage : 141 m3

Ballast Water: 200 m3

Oily bilge water: 8.1 m3

Dirty Oil tank: 1.3 m3

Clear deck Space: 276 m2

Deck Crane: 1 pcs IRON FIST, BLUE STEEL S.R.L. (PAGO VEIANO-BN-- ITA ) -SWL 2.2 Tons- 17.5mtr, 5.75 Tons- 7.2 mtr

Ballast Water: 320 m3

Oily bilge water: 20.9 m3

Dirty Oil tank: 4.35 m3

Clear deck Space: 335 m2

Deck Crane : 1 pcs, IRON FIST, BLUE STEEL S.R.L. (PAGO VEIANO-BN– ITA) - SWL 2.2 Tons- 17.5 mtr, 5.75 Tons- 7.2 mtr

Supply Vessels

Page 13: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

13 / 22

m/v "ASI"Dimensions : 18.77 x 8.0 m

Max. draft : 2.20 m

Main Engine : 2 X 447 KW

BP: 10 Ton

Deck Crane : 1 pcs, “EFFER” Hydraulic Knuckle Crane. Model:65000-35-L (SWL 8 Ton / 7,3 m )

m/v "SURVEYOR"Dimensions : 23.5 x 10.0 m

Max. draft : 1.60 m

Main Engine : 3 X 164 KW

BP : 10.7 ton

Deck Crane : 2 pcs,

Heila 140-3S (Forward, 10 Ton / 12,17 m), Heila 3500-3S (Aft 2,8 Ton / 11,3 m)

m/v "GOKSU"Dimensions : 20.1 x 8.0 m

Max. draft : 2.40 m

Main Engine : 2 X 441 KW

BP : 14.7 ton

Deck Crane : 1 pcs, “EFFER” Knuckle Boom ship deck crane, Model:80000SL 3S (SWL 7.5 Ton / 11 m)

Multicats

Page 14: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

14 / 22

Dimensions: 18.49 x 6.0 m

Draft : 1.20 m

Equipment :

GPS Receiver & Antenna

Motion Sensor

Gyro Compass

Multibeam Head

Multibeam Sonar Processor

Radio Telemetry

Bathymetric Survey Vessel “Coastal Assistant”

Page 15: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

15 / 22

M/S "ATASH"Special service / Personnel carrier

Dimensions : 31.4 x 7.3 m

Max. draft : 1.65 m

Main Engine : 3 X 559 KW

Clear deck Space : 54.6 m2

POB : 70 (Day Pax)

M/S "NURIA"Dimensions : 14.74 x 13.0 m

Main Engine : 2 X 320 KW

Number of crew for safe operation / passengers 3 at twelve hours shift / 20

M/S "MEMO"Dimensions : 24.70 x 5.6 m

Max. draft : 1.50 m

Main Engine : 2 X 655 KW

Number of crew for safe operation / passengers 4 at twelve hours shift / 66

Crew Boats

Page 16: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

16 / 22

Spud Barge “CORUH”

Dimensions : 54.0 x 11.0 m

Max. draft : 2.20 m

4 leg, 16 m long, Dia.609 mm

Spud Barge “EB-105“

Dimensions : 85.2 x 16.60 m

Max. draft: 2.60 m

4 leg, Length 16.9 m, Dia.610 mm

Spud Barge “CEYHAN“

Dimensions : 54.0 x 11.0 m

Max. draft : 2.20 m

4 leg, Length 16 m, Dia.609 mm

Spud / Spreader Barge “EB-106“

Dimensions : 85.2 x 16.60 m

Max. draft: 2.60 m

2 leg, Length 16.9 m, Dia.610 mm

4 Point mooring anchor system, rated pull: 55 Ton, 10 m/min. (each, 4

Ton Delta Flipper anchors, 44 mm wires, Length 500 m)

Spud and Spreader Barges

Page 17: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

17 / 22

Cargo Barge “EB 103“

Dimensions : 85.60 m x 16.6 m

Draft (max): 2.60 m

Deadweight: 2500 t

Deck Capacity: 14 t/m2

Concrete Plant Barge“EB-102“

Dimensions : 85.60 x 16.6 m

Draft (max): 2.60 m

Deadweight: 2500 t

Deck Capacity: 14 t/m2

Concrete Plant;

Capacity : 30 m3/h, Cement Silo Capacity : 50 tones, Water tank at deck 50 m2

Cargo Barge “CEVIK -1”

Dimensions : 63.20 m x 16.40 m

Max. draft : 2.93 m

Deadweight: 2271 t

Deck Capacity : 10 t/m2

Cargo Barge “EB-104“

Dimensions : 85.60 m x 16.6 m

Draft (max): 2.60 m

Deadweight: 2500 t

Deck Capacity: 14 t/m2

Cargo and Concrete Plant Barges

Page 18: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

18 / 22

Dimensions : 28.16 x 9.5 m

Draft : 2.60 m

Main Engine : 2 X 1014 KW

Bow Thruster : 160 KW

BP : 27.8 ton

Deck Crane : 1 pcs, HEILA / HLRM 140-3S -SWL 10 Ton / 12.25 m

Multi Purpose Tugboat “Meric”

Page 19: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

19 / 22

Sakhalin II Onshore Processing Facility (OPF)

PROJECT LOCATION

Sakhalin - Russia

CLIENTSakhalin Energy Investment Co.

CONSTRUCTION PERIODMay 2003 - July 2009

PROJECT VALUEUS$ 1.1 Billion

PROJECT DESCRIPTIONThe Sakhalin II Onshore Processing Facility, located in the Nogliki district, 7 km inland in the north-east of Sakhalin Island, is the first combined oil & gas processing facility built in Russia and the largest of its kind globally. It is the key element of the Sakhalin II integrated oil and gas field development project, producing oil and gas from two major offshore fields located on the northeastern shelf of Sakhalin Island in the Okhotsk Sea.

The scope of work included the design and construction of buildings, multi-discipline fabrication, construction and erection works and provision of commissioning and start-up assistance for the whole facility; and also procurement of bulk materials; material management; transportation and logistics of all process equipment and materials sourced worldwide and free-issued by the client.

Page 20: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

20 / 22

PROJECT LOCATION

Sakhalin Island - Russia

CLIENTExxon Neftegas Ltd.

CONSTRUCTION PERIODJune 2005 - October 2006

PROJECT VALUEUS$ 94 Million

PROJECT DESCRIPTIONIn May 2005, ENKA was awarded the contract for the installation of the mechanical and piping systems for the Onshore Processing Facility by Fluor Daniel Eurasia Inc. the EPCM Contractor, on behalf of Exxon Neftegas Limited.

ENKA scope comprised the erection and installation of various static and rotating process equipment including compressors, generators, heat exchangers, boilers and pumps; field erection of 40,000 tons of prefabricated modules weighing between 900 and 2,500 tons and field erection of 4,100 tons of steel as well as 40,000 m of field piping, including fitting, welding, pressure tests, painting and insulation. ENKA also performed all scaffolding and winterization works for all disciplines at the Onshore Processing Facility Site & Orlan Platform during the project and provided commissioning and start-up support to the client.

ENKA not only performed the hook up of these prefabricated modules, but also a substantial amount of stick built site erection work during very harsh two winters, including required field modifications to prefabricated modules and erection of their loose delivered parts, erection of freestanding equipment, various stick built pipe racks and all interconnecting piping works. ENKA also provided plant commissioning and startup assistance to the client.

Sakhalin I Chayvo Onshore Oil Processing Facility

Page 21: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

21 / 22

EgeGaz Aliaga LNG Terminal

PROJECT LOCATION

İzmir – Turkey

CLIENTEgeGaz Inc.

CONSTRUCTION PERIODMarch 2000 – September 2001

PROJECT DESCRIPTION

Mechanical Erection (Steel Works) of tanks was performed by CİMTAŞ (a subsidiary of ENKA). The very unique feature of the project is the lifting operation of the tank roofs. Following the ground assembly, the tank roof with a single piece weight of 800 tons and a diameter of 80 m has been lifted to its final position at +35 m by means of compressed air blowing.

• Capacity: 2 x 140,000 m³

• Height: 31 meters

• Diameter: 82 meters

• Materials: A553 Type 1 (9% Ni)

• Concrete, carbon-steel-lined outer wall and dome roof, an ASTM A 553 type 1 9%Ni steel tank, a suspended aluminium deck type ASTM B 209 5083 and stainless steel piping and stairs

• Designed by: CB&I as per API 620 and have a total steel weight of 7,000 tons

• Inner tank steel material being ASTM A553 Type 1 requiring advanced welding technology

Page 22: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

22 / 22

Project Location Client Tonnage PlantCapacity Business Lines Year

Sabine Pass LNG Terminal (Stage 6) U.S.A. Bechtel OG&C Houston 7,537 4.5 mtpa Engineering, LSAW Pipe, Fitting, Pipe Spool 2020

Croatian LNG Terminal Croatia OMV INDOIL 186 1.9 mtpa LSAW Pipe 2020

Croatian LNG Terminal Croatia TPK Armatura 71 1.9 mtpa LSAW Pipe 2020

Corpus Christi Liquefaction Project (Stage 3) U.S.A Bechtel OG&C Houston 7,567 4.5 mtpa LSAW Pipe, Fitting, Pipe Spool 2019

Kitimat LNG Project Canada Erciyas Boru 270 10 mtpa LSAW Pipe 2019

Marmara Ereglisi LNG Terminal Project Turkey GEN Group 10 5.9 mtpa Fitting 2017

Sabine Pass LNG Terminal (Stage 5) U.S.A Bechtel OG&C Houston 6,809 4.5 mtpa Fitting, Pipe Spool 2017

Corpus Christi Liquefaction Project (Stage 1&2) U.S.A Bechtel OG&C Houston 13,823 9 mtpa Fitting, Pipe Spool 2017

Marmara Ereglisi LNG Terminal Project Turkey GEN Group 80 5.9 mtpa LSAW Pipe 2017

Sabine Pass LNG Terminal (Stage 3&4) U.S.A Bechtel OG&C Houston 13,670 9 mtpa Pipe Spool 2015

Angola LNG Project / Additional Scope Angola Bechtel OG&C Houston 1,300 5.2 mtpa Pipe Spool 2015

Sabine Pass LNG Terminal (Stage 1&2) U.S.A Bechtel OG&C Houston 14,269 Pipe Spool 2014

Australia Pacific LNG Project Australia Bechtel OG&C Houston 6,800 9 mtpa Pipe Spool 2014

Santos GLNG Australia Bechtel OG&C Houston 13,200 7.8 mtpa Pipe Spool 2014

BG Queensland LNG Project Australia Bechtel OG&C Houston 9,800 8.5 mtpa Pipe Spool 2013

Angola LNG Project Angola Bechtel OG&C Houston 7,200 5.2 mtpa Pipe Spool 2011

Equatorial Guinea LNG Project EquatorialGuinea Bechtel OG&C Houston 2,500 3.7 mtpa Pipe Spool 2006

Egyptian LNG Project Egypt Bechtel OG&C Houston 5,500 7.2 mtpa Pipe Spool 2004

CIMTAS PIPE FEATURED LIQUEFIED NATURAL GAS (LNG) PROJECTS

Page 23: OFFSHORE & ONSHORE LIQUEFIED NATURAL GAS PROJECTS

23 / 22

İNŞAAT VE SANAYİ A.Ş.Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul

Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69e-mail: [email protected] web: https://www.enka.com