1
OMAN NORTH AIRBASE - PHASE II, OMAN Facts Project Description The works are located in the vicinity of Musannah on the road between Muladdah and Rustaq. The works comprise the civil, electrical and mechanical works for the construction of the Musannah Airbase. Construction of runway and parallel taxiway with different types of pavement and different thickness. Concrete pavement for both ends of runway and aprons, flood water channel, airfield lighting, communication and electrical work. CAT4E-Runway 4,600 m x 75 m Excavation: 4,683,804 m³ Filling including sub-grade: 4,294,916 m³ Pavement: granular sub-base: 183,159 m³ Aggregate base course: 130,293 m³ Concrete pavement: 129,684 m³ EXCAVATION: Cargo apron & arm/disarm pads 18 931 m³ Road works 8 564 m³ Below & adjacent to the runway 1 042 017 m³ Flood water drainage channel 3 614 292 m³ Total 4 683 804 m³ FILLING INCLUDING SUB-GRADE: Cargo apron & arm/disarm pads 845 291 m³ Flood water drainage channel 3 449 625 m³ Total 4 294 916 m³ PAVEMENT: Granular sub-base 183 159 m³ Aggregate base course 130 293 m³ Crushed aggregate base course 59 563 m³ Intermediate asphalt course 83 520 t Surface asphalt course 148 480 t Concrete pavement 129 684 m³ AGL Works City/Country Musannah / Oman Client Ministry of Defence, Sultanate of Oman, Muscat Contract Value € 80,51 Mio. Construction Period 8/2007 - 12/2009 (27 months) .

OMAN NORTH AIRBASE - PHASE II, OMAN NORTH AIRBASE - PHASE II, OMAN Facts Project Description The works are located in the vicinity of Musannah on the road between Muladdah and Rustaq

  • Upload
    vokhanh

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

OMAN NORTH AIRBASE - PHASE II,OMAN

Facts Project DescriptionThe works are located in the vicinity of Musannah on the road between Muladdah andRustaq. The works comprise the civil, electrical and mechanical works for the constructionof the Musannah Airbase. Construction of runway and parallel taxiway with different typesof pavement and different thickness. Concrete pavement for both ends of runway andaprons, flood water channel, airfield lighting, communication and electrical work.

CAT4E-Runway 4,600 m x 75 mExcavation: 4,683,804 m³Filling including sub-grade: 4,294,916 m³Pavement: granular sub-base: 183,159 m³Aggregate base course: 130,293 m³Concrete pavement: 129,684 m³

EXCAVATION:Cargo apron & arm/disarm pads 18 931 m³Road works 8 564 m³Below & adjacent to the runway 1 042 017 m³Flood water drainage channel 3 614 292 m³Total 4 683 804 m³FILLING INCLUDING SUB-GRADE:Cargo apron & arm/disarm pads 845 291 m³Flood water drainage channel 3 449 625 m³Total 4 294 916 m³PAVEMENT:Granular sub-base 183 159 m³Aggregate base course 130 293 m³Crushed aggregate base course 59 563 m³Intermediate asphalt course 83 520 tSurface asphalt course 148 480 tConcrete pavement 129 684 m³AGL Works

City/Country

Musannah / Oman

Client

Ministry of Defence, Sultanate of Oman,Muscat

Contract Value

€ 80,51 Mio.

Construction Period

8/2007 - 12/2009 (27 months)

.