Online Test and Quizzes Platform

Embed Size (px)

Citation preview

  • 7/25/2019 Online Test and Quizzes Platform

    1/27

    ONLINE TEST ND QUIZZES PLATFORM

    NOOR SYAHIDA BT. MOHD YUSOF

    This report is submitted in partial fulfillment of the requirement for the Bachelor of

    Computer Science Software Development)

    FACULTY OF INFORMATION

    AND

    COMMUNICATION TECHNOLOGY

    UNIVERSITI TEKNIKAL MALAYSIA MELAKA

    2 7

  • 7/25/2019 Online Test and Quizzes Platform

    2/27

    BSTR CT

    computerized online system will be developed for instructor in Universiti

    Teknikal Malaysia Melaka (UTeM). Online system is important in an organization in

    establishing, building, leading quality of staff and department performance. It is also

    generally acknowledged as a vital element in efficiency and effectiven ess of any large or

    small organization. The current manual and standalone system do not satisfy the

    management performance of the department. Therefore, online Test and Quizzes

    Platform was building to substitute current system. This system assists the lecturer to

    create the type of question quickly, keep student marking details safely, calculate mark

    faster and retrieve data via searching. Thi s system will be developed using PHP, A pac he

    server and My SQL as a database platform. Software Development Life C ycle (SDLC)

    methodology and waterfall model are implemented as a systematic guidance in

    developin g the system. Al l the requirements specification in the report resulted from th e

    analysis on current and proposed system. High level design describe high-level view of

    the system s structure or system interior that contain system architecture, user interface

    design and database design. Th e result of this system i s that Online Test and Quizzes

    Platform can m ade well organized management and improves the working environment

    becom e m ore efficient and easier.

  • 7/25/2019 Online Test and Quizzes Platform

    3/27

    BSTR K

    Sebuah sistem perkomputeran secara online akan dibangunkan untuk kegunaan

    tenaga pengajar Universiti Teknik al Malaysia Melaka UTeM). Sistem secara online

    penting dalam sesuatu organisasi dalam mewujudkan dan meningkatkan tahap kualiti

    pekerja dan pelaksanan sesebuah organisasi. Sistem manu al dan sistem setempat yang di

    aplikasikan sekarang tidak memenuhi kehendak pelaksanaan pengurusan organisasi.

    Oleh demikian, sistem online Ujian dan Kuiz Platform dibangunkan untuk

    menggantikan sistem yang sedia ada. Sistem ini membantu pensyarah menyediakan

    bentuk soalan lebih mudah, m enyimpan maklumat permarkahan p elajar dengan selamat,

    mengira permarkahan dengan cepat, dan memperolehi data melalui carian maklumat.

    Sistem ini dibangunkan dengan mengunakan perkak as perisian iaitu PHP, Apac he server

    dan MySQL sebagai pangkalan data. Metodologi Kitar Hayat Pembangunan Sistem dan

    w terf ll model

    di implementasikan sebagai panduan dalam membangunkan sistem

    seca ra sistematik. Semua spesifik asi keperluan sistem dala m laporan adalah hasil kajian

    daripada analisa ke atas sistem yang sedia ada dan sistem yang bakal dibangunakan.

    Rekabentuk aras tinggi menerangkan pandangan reka bentuk struktur luaran dan

    dalaman sistem yang merangkumi rekabentuk sistem, rekabentuk antaramuka pengguna

    dan rekabentuk pangkalan data. Online Ujian dan Kuiz Platform dapat meningkatkan

    tahap pengurusan dan suasana kerja tenaga pengajar and pelajar menjadi lebih mudah

    dan efisien.

  • 7/25/2019 Online Test and Quizzes Platform

    4/27

    CH PTER

    INTRODUCTION

    1 1 Project

    Background

    Information and Comm unication Technology ICT) brings a new technology to

    change and eas e the management to get the information that will more system atic and

    efficient. Becaus e of that, a computerized system that develops Online Test and Q uizzes

    Platform is proposed to developed and implem ented for instructor in education

    organization.

    he

    purpose of this system i s to help lecturer to make online question

    paper which b e uploaded by lecturer. Students need to answer the questio n paper and

    subm it it via onlin e test and quizzes platform.

    Th is system is build for institute or education organization. The system and data

    not limited becau se this system can support many d ata in one time. This system develops

    for lecturer to m ake them easily produce question paper and m ark answ ers immediately.

  • 7/25/2019 Online Test and Quizzes Platform

    5/27

    1 2

    Problem Statement s)

    Mostly in institute or education organization are using less computerized system

    and still using manual system. Th is system is mainly to help instructor to organ ize their

    question paper for test and quizzes. The problem that bring to developing of the O nline

    Test and Quizzes Platform are as started below:

    All the question papers were kept in files. This will require a big space for filling

    the papers.

    The instructors do not have time to m ake the question and mark the answer paper

    for each student.

    The instructors need a lot of blank paper to print out the question paper. All of

    the questions must be print before they can give to the students.

    The usage of paper-base in the current system will surely bring up the risk of

    losing the question paper.

    1 3

    Objective

    This project is carried out with the following objective. There are three

    fundamental objective of this project:

    To decrease the usage of the paper because instructors do not have to print out

    the questions.

  • 7/25/2019 Online Test and Quizzes Platform

    6/27

    T o help the instructors save their time because they no need to mark one by o ne

    question paper of student.

    T o help lecturer manage their multiple classes.

    1 4 Scope

    Th is Online Test and Quizzes Platform will be buildin g for a Universiti Teknikal

    Malaysia Melaka UTeM). The user is lecturer and student in that organization only. The

    system is available for the hold sem ester. The types of q uestion are objective, true false

    and fill in the blank. Th e ratio instructor per class is

    1: l

    Th e module that cover are:

    User Registration Module

    Th e test and quizzes online has user register syste m that is uniquely for

    Online Test and Q uizzes Platform only. This system w ill provide levels

    of security to enter the system. After the instru ctors have registered, they

    have their own

    ID

    and password.

    =

    Question Categorizations

    Th e categor ies of question are produce, so that it helps the instructor to

    retrieve the que stions easily. The categories a divided depend at the

    seme ster and cou rse of student.

  • 7/25/2019 Online Test and Quizzes Platform

    7/27

    Auto Generate Grade

    Th is system is able t o generate grade automatically. The system can show

    semi auto result calculation and analysis mark h is he r result of grade for

    the students.

    Th e modules that not cover are:

    Exam question paper

    Th is system not covers for the exam qu estion paper.

    Subject non academic

    For the non academ ic subject such

    as

    co-curriculum are not covers. For

    example there are som e

    o

    the co-curriculum su bjects having their test for

    each student.

    G PA (Grade Point Average)

    Th e GPA for each student also not covers in this system. Because this

    part is cover by academ ic department.

    1 5 Project significance

    Each system that is built based o n their functionality that the user need. In this

    context, the system that i s built will h elp instructor in many w ays. Th is web-based

    system will reduce the instructor s time in search ques tions via w eb, not manually a s in

    the current system. This system will b ring a new concept in retrieving question for test

    and quizzes.

  • 7/25/2019 Online Test and Quizzes Platform

    8/27

    Each question will be categorized based on seve ral levels. Thus categorization

    will help instructors to search question that are needed without knowin g much about the

    questions itself. The instructor also should be provided with an integrated question

    centralized to he lp them search and archive question faster and user-friendly.

    Th e significance project also is important for student. This is because it can solve

    the entire problem difference with the current system. Th is system is a m ore efficient

    and systema tic web-based system. Th e student does not have to prepare their own

    stationary to answ er the question during test or qu iz session.

    1 6

    Expected Output

    Th is system will give advantag e to the instructor and student to produce a formal

    question paper based on the specific format that sets in the system. The syste m can

    create the question paper w ith easily and faster. It also ca n help th e instructor to.manag e

    the multiple classes and can handle the multiple type of question. Beside that the system

    can limit each test durin g test or quiz zes session. Al l result could be semi-automatically

    calculated.

    1 7 onclusion

    s

    a conclusion this chapter explains about the introduction phase of Online

    Test and Quizzes P latform. That als o define the problem statem ent that occurred in

    current system that need to be solv e when build up the new system. Th is chapter also

    elaborates objectives that must achieve. Beside that the chapter also contain scope of

  • 7/25/2019 Online Test and Quizzes Platform

    9/27

    this system project significant and expected output that must be ach ieve when the

    system is com plete.

    The next chapter is Literature Review and Project Methodology. It will review

    other project and make comparisons with the new system Online Test and Q uizzes

    Platform. Beside that the next chapter also explains about the m ethodology that will be

    used in this project.

  • 7/25/2019 Online Test and Quizzes Platform

    10/27

    CHAPTER I

    LITERATURER VI W AND PROJECT M ETHODOLOGY

    2 1 Introduction

    In this chapter the literature review is focuses on th e research of the current

    system and the new system that is develop. T he purpose of a literature review i s convey

    the reader about the knowledge and what are the strengths and weaknesses.

    This section is started by fact and finding. It will d iscuss and review about

    approached and related research reference related this system. Beside that it also states

    other approaches. In project methodology section selected approach or methodology

    will be described every stage of activities d o it. All the requirements in this system will

    be explained with project schedule and milestone.

  • 7/25/2019 Online Test and Quizzes Platform

    11/27

    2 2 Fact and findings

    2 2 1

    Domain

    Th is system is used at departm ent in an organization by instructor. They used this

    system to m anage and get new information about test and quizzes. It is also to allow

    instructor and student im proved ac cess information. S o, each test and quizzes that will

    be produce by us ing this system, it will be more organized, com puterized, and easy to

    locate or research and find ing process. The Internet provides an effective aven ue for

    testing students on knowledg e and attitudes. More and m ore certification examinations

    are available online, offered through com puter-based testing centers. Researchers report

    that tests conducted ove r the Internet yield similar results to standard paper-and-pencil

    tests in a traditional classroom, leading to the conclusion that onlin e tests can be as valid

    and reliable as any other kind of exam. (Rice (2003). The Role of Assessment in Web-

    Based Learning Journal of Ad ven tist Education. Bi1.31)

    2 2 2 Existing System

    ase Study 1:

    This web-based is developed by N CS Pearson. Th e website is giving

    som e advantage for their user to get the som e information using this system. In this site

    have more func tion offers such a s test taker services, test program information, test

    delivery solution, become a test center, purchase vouchers, about u s and contact. (NCS

    Pearson.(1996-2007). The

    leading computer-based testing provider PEAR SON

    WE

    Retrieved o n May 200 7 from http://www.VUE.com)

  • 7/25/2019 Online Test and Quizzes Platform

    12/27

    7

    m E d F - r m h *

    ow

    : :

    F 9

    lnnhenews- r nq urn-

    2 1 y.12007 14 -2007

    Cnrnz

    Evpandr

    T e r ~ m

    ppnnurmel lor

    Crlrlr

    b q m s tern- web Perrron

    WE

    r

    Cmdldrr-r Thm,qh Pmner ~h lp

    r

    Pcarrnn

    WE.

    3 2 7

    The A ~ ~ r a i r dnrrrrute b n n r tern-

    11

    b 2 0 0 7

    W

    P ~ W S C C UE

    Prrmcsrnv

    m

    Pewran

    vU o D r ~ l a o d

    Adnannrrer

    x a m s

    for

    the

    Warhlnpton

    3

    kd 2 7

    Dc~arrment Ftnanra.1 Inmtunonr .

    Tn. A m c r ~ c u ~

    oard

    of R adaolan

    EDC < Cram

    r q , m a t 3 3 n

    6.h Pea son

    03

    I 007 duF

    H m J l r r * r . n s . ~

    0 -

    4

    C ~ C S S ~ Y M ~

    n

    161----...n&--

    4r_l~opoul~~-. . . j

    p , p n d l e

    l:sUI

    Figure

    2.1:

    Main menu

    W E PE RSON

    page

    Benefits:

    -

    The website is secured All users want to access these sites have to register

    first

    All data about the user registration is secretes

    All users in world can used this system Not specified on one place only

    Users can take the test in different place through online system They also

    take the result using this system

    System Constraints:

    This web based has several constraints to fix The scope of user is overall All

    users can access and use this site when they register They also can choose many

  • 7/25/2019 Online Test and Quizzes Platform

    13/27

    catego ries of course s they need alth ough they not take this course before. Th ey system

    not filter users follow their level o r courses. To take test using this system, the users

    have paid first the fees of subject th e need to take.

    s

    a sum mary all constrains that have been in previous sy stem study can m odify

    in Online Test and Qu izzes Platform. In the system can also provide the application form

    that can be used by th e instructor and student. It also can

    ix

    the sco pe of users; it is

    because this Online Test and Qu izze s Platform will be building for users in Universiti

    Teknikal Malaysia Melaka (UTeM).

    Case

    tudy :

    These quizzes were created with H alf-Baked Software that offers such as class

    help, student work, more on history, other information, fun, talk to me and site map.

    (Half-Baked Software. (2005). Mrs. Newm ark's page of American History,

    Government, and Politics . Retrieved o n May 20 07 from

    http://home.att.netl betsynewmarWQuizzesva~e.

    tml)

  • 7/25/2019 Online Test and Quizzes Platform

    14/27

    Y l - 1 b c n 6 Y n r . ) . x 4 - 1 ~ > 1 m n l y

    =PI

    1 Wllm- .=,.I *: l*:. I W l - " ,RL*w(P* It.

    Jsr j.,.: ml v.*:rr ~ ~ n n r - n v r - ~1 ir

    4 lab

    Figure

    2.2

    List

    of

    question page (Online Test)

    Benefits:

    Did not have to register first. All users can access this site.

    -

    This system not have instructor it is because this system can auto generate

    the mark when the user submitted the answer.

    In this site user can reset the Times-Visited Counter. When users start answer

    the question the times can start count the duration and stop it when the time

    UP.

    This page is updated. The question of test always updated in every monthly.

    System Constraints

    This web based has several constraints to fix. This system not provides user

    register which not giving the instructor to add the new question and all users can use

    this system to practice through online system or internet.

  • 7/25/2019 Online Test and Quizzes Platform

    15/27

    sa sum mary all constrains that have been in previous system study can modify

    in Test and Quiz zes Online system. In the Test and Q uizzes Onlin e can provide the

    application fo rm that can be used by the instructor. If they want to create or modify the

    question they need to register first. It is sa me for the stud ent; they should register first

    before answer the question.

    Case tudy :

    Th is web-based i s developed by Pulitzer Prize that offers such as Islamic

    theology, human relation, selected disciplines and comparative religion. In categories

    Islamic theology sessio n has the part for test online for users use.( Pulitzer Prize. (1994).

    IslamlOl . Retrieved on May

    2 7

    from

    http://www.Islam101.com/onlineTests/lltest1.htm

  • 7/25/2019 Online Test and Quizzes Platform

    16/27

    ~ I s l a m l O lcom

    Level 1 Test 1 Fundamentals

    HontPot8ket wmt:

    Figure 2 3: List of question page Online Test)

    Benefits:

    All users can access this site easily.

    This system does not have instructor it is because this system can auto

    generate the mark when the user submitted the answer

    System Constraints

    This web based also has several constraints to fix. This system not provides user

    register. They can be answering the question and submitted with type they name for get

    their result or grade.

  • 7/25/2019 Online Test and Quizzes Platform

    17/27

    sa summ ary all constrains that have been in prev ious system study will be

    modify in Test and Q uizzes Online system. In the Test and Quizze s Online will be

    provide the application form that can be used by the instructor.

    2 2 3

    nalysis and Findings

    After do the review from othe r existing system each system come out with the

    extra features in order to ove rcome the m anual system. All the process flow is iden tical

    only the implementation and a ppearance in different.

    Comparison the proposed system with current system is not more different. The

    sco pe proposed system i s specified for that the education organization in M alaysia only.

    Different with the current system that not specified user usage the test or quizzes in all

    country. The sco pe is s o big and overall.

  • 7/25/2019 Online Test and Quizzes Platform

    18/27

    Table 2 1: Comparison between existing and proposed system

    VUE PEARSON

    Interface

    Security

    Technology

    Objective

    Access

    Function

    User Friendly

    Secured

    Online System

    The test can access easily and the user can

    take the test through online from the centre.

    The system can manage test and class

    All user is register

    Easy to use and systematic

    Half Baked Software

    User friendly

    Not Secured

    Online System

    Help student to do practice and

    exercise.

    All user

    Simply to use

    User friendly

    Not Secured

    Online System

    Help student to do practice and

    exercise and access easily

    All user

    Simple and easy to use

  • 7/25/2019 Online Test and Quizzes Platform

    19/27

    2.3

    Project Methodology

    Th e methodology that use in this system is SD LC System Development Life

    Cycle). Th is methodology is a conceptua l model. Various SD LC methodologies have

    develo p to guide the processes involved, including the waterfall model which wa s the

    original SD LC method); rapid application development RAD);joint application

    development JAD); the fountain model; the spiral model; build and

    fix;

    and

    synchronize-and-stabilize. Frequently, several models are combined into som e sort of

    hybrid methodology.

    The figure

    2 9

    show s SDL C. It consists several of phases included planning

    phase, analysis phase, design ph ase, testing and closing with im plementation phase.

    Phase :

    Phase :

    Phase

    3:

    Phase 4:

    Phase :

    Planning

    v

    Analysis

    Design

    Testing

    v

    Implementation

    Figure

    2.4:

    System Development Life ycle

    Phase :Preliminary project begins with g roup discussion. Thi s part is to define what

    the system w ill contain.

    A

    good plan must be a flexible and revisable document. W e

    have decided to break the syste m dow n into more manageable task. Th e plan is include:

  • 7/25/2019 Online Test and Quizzes Platform

    20/27

    i.

    A

    description of the organization of the project, sho wing wh o the personnel are

    and their roles and responsibilities

    ii.

    A

    description of the system to be produce, with their completion and quality

    criteria.

    iii. A description of the individual work packages for team m embers.

    iv. An analysis of the risks involved in the project.

    Phase :

    A

    detailed exam ination will be applied for the analysis phase. This i s a heading

    that really include s the study for the system: what the sys tem can d o and cannot do. Each

    work flow for e ach functions will be discover in the analysis part.

    Phase 3: The design of the system whic h consists of conceptua l design, logical design

    and physical design.

    Phase

    4:

    Th e system will be testing before implement it. If any is found m issing then it

    should g o to the previous phase to make sure wha t the missing is.

    Phase 5: Th e system i s implemented to sho w the successful of the project. M aintenance

    is not covered in our project.

    2 3 1 Waterfall odel

    Th e waterfall model is a popular version of the Sys tem s Development L ife Cycle

    SDLC) model for softw are engineering. Often considered the classic approach to the

    system s development life cycle, the waterfall model describes a development method

    that is linear and sequential. Waterfall development has distinct goals for ea ch phase of

    development. On ce a phase of development is completed, the development proceeds to

    the next phase and there is no turning back.

  • 7/25/2019 Online Test and Quizzes Platform

    21/27

    The advantage of waterfall development is that it allows for departmentalization

    and managerial control. Development moves from concept, through design,

    implementation, testing, installation, troubleshooting, and ends up at operation and

    maintenance. schedule can be set with deadlines for each stage of development and a

    product can proceed through the development process and theoretically, be delivered on

    time. Each phase of development proceeds in strict order, without any overlapping or

    iterative steps.

    The disadvantage of waterfall development is that it does not allow for much

    reflection or revision. Once an application is in the testing stage, it is very difficult to go

    back and change something that was not well-thought out in the concept stage.

    Alternatives to the waterfall model include joint application development JAD), rapid

    application development RAD), synch and stabilize, build and fix, and the spiral model.

    Design

    Implementation

    Verification

    Maintenance

    Figure

    2 5:

    Waterfall process

    To follow the waterfall model, one proceeds from one phase to the next in a

    purely sequential manner on show in figure

    2 5

    When the requirements are fully

    completed, one proceeds to design. This design should be a plan for implementing the

    requirements given. When the design is fully completed, an implementation of that

  • 7/25/2019 Online Test and Quizzes Platform

    22/27

    design is made by coders. Towards the later stages of this implementation phase,

    disparate software components produced by different teams are integrated.

    After the implementation and integration phases are complete, the software

    product is tested and debugged; any faults introduced in earlier phases are removed here.

    Then the software product is installed, and later maintained to introduce new

    functionality and remove bugs. Thus the waterfall model maintains that one should

    move to a phase only when it is preceding phase is completed and perfected. Phases of

    development in the waterfall model are thus discrete, and there is no jumping back and

    forth or overlap between them.

    So, for the Online Test and Quizzes Platform, it is suitable to use the SDIC

    System Development Life Cycle) and the waterfall model. This is because, all phase

    and steps should be complete before preceding the other steps.

    2 4 Project Requirements

    2 4 1 Software Requirement

    a. Equipment/development tools

    Rational Rose Enterprise Edition and Microsoft Visio is current

    equipment that used as tools to modeling the diagrams. Microsoft Project

    also current equipment that used mainly to develop Gantt charts. PHP

    will be used as server-side scripting language to develop web. PHP

    Hypertext Preprocessor PHP) is a freeware or open source product.

    Dreamweaver also tools that used to design the web pages and it is

    current equipment.

  • 7/25/2019 Online Test and Quizzes Platform

    23/27

    b. Operating system/sewer eg: OSlWeb server/App Sewer)

    Microsoft Window

    X

    Professional vision 2002 Services pack 2 gold

    Reloaded Edition)

    Apache H ITP Sewer version 2.3

    c. Database system eg: OracleNS SQL Sewer/MySQL)

    MySQL is an open source license that enables to efficiently store, search,

    sort and retrieve data.

    2 4 2 Hardware Requirement

    Personal Computers

    PCs)

    o Processor Pentium

    4,3.00

    GHz)

    o

    Memory

    512MB)

    o CD-ROM drive 80GB)

    o

    Input devices mouse and keyboard)

    o Output devices printer)

    2 4 3 Other Requirement

    Labs IT MK

    o This lab is used for testing the system during the project is

    developed.

  • 7/25/2019 Online Test and Quizzes Platform

    24/27

    2 5 Project Schedule and Milestones

    This table is show this system application; project schedule and milestone are

    created for viewing PS M I activities duration.

    Table 2 2: PSM

    I

    activities

    ctivity

    Briefing to students and

    start completing project

    title and choosing

    supervisor.

    Submit complete

    proposal to supervisor

    for approval

    Design and com pleting

    introduction chapter

    (chapter I , literature

    review and project

    methodology (chapter

    2 -

    Submit Chapter and

    Chapter 2 to language

    supervisor.

    End Date

    11/05/2007

    (Week2)

    25/05/2007

    (Week3)

    01/06/2007

    (Week 4)

    Start

    Date

    7/05/2007

    (Weekl)

    14/05/200

    7

    (Week 2)

    281051200

    7

    (Week

    4

    Output

    List of project

    title.

    Complete project

    proposal form.

    Introduction,

    Literature review

    and

    Methodology

    Project Report.

    Evaluate

    student s English

    usage

    ctivity

    Briefing to students

    and start

    completing project

    title and choosing

    supervisor.

    Submit complete

    proposal to

    supervisor for

    approval

    Design and

    completing

    introduction chapter

    (chapter

    I ,

    literature review

    and project

    methodology

    (chapter 2).

    Submit Chapter

    and Chapter 2 to

    language

    supervisor.

  • 7/25/2019 Online Test and Quizzes Platform

    25/27

    Requirement analysis

    and co mpletin g report

    analysis (Chapter 3 and

    progress evaluation.

    Preliminary design and

    completing Design

    report (Chapter 4 and

    progress evaluation.

    Performance evaluation

    and project progress

    Completing and submit

    PS M I report

    PSM I Presentation

    Completing and

    submission of detail

    design report (Chapter

    4 and progress

    evaluation.

    04/06/200

    7

    (Week 5

    11/06/200

    7

    (Week 6

    18/06/200

    7

    (Week 7

    251061200

    7

    (Week 8

    09/07/200

    7

    (Week 1

    08/06/2007

    (Week 5

    15/06/2007

    (Week 6

    22/06/2007

    (Week 7

    29/06/2007

    (Week8)

    03/08/2007

    (Week 4

    Repo rt Analysis.

    Analysis

    progress report.

    Evaluate

    student s English

    usage.

    Preliminary

    Design report.

    Preliminary

    Design progress

    report.

    Evaluate

    student s English

    usage

    Define student

    status

    Three copies of

    PSM I report

    Final Report

    PSM I

    Detail Design

    Report.

    Progress

    Evaluation

    report.

    Requirement

    analysis and

    completing report

    analysis (Chapter 3

    and progress

    evaluation.

    Preliminary design

    and completing

    Design report

    (Chapter 4 and

    progress evaluation.

    Performance

    evaluation and

    project progress

    Completing and

    submit PSM I

    report

    PSM I Presentation

    Completing and

    submission of detail

    design report

    (Chapter 4 and

    progress evaluation.

  • 7/25/2019 Online Test and Quizzes Platform

    26/27

    2 5 1

    Gantt Chart

    Refer to appendix A

    Completing

    implementation and

    testing phase Chapter 5)

    and progress evaluation.

    Completing testing

    phase systeduser

    integration) Chapter 6)

    and progress evaluation.

    Completing and submit

    complete report draft)

    PSM I presentation and

    evaluation

    Complete report

    of

    implementation

    and result of

    testing unit and

    progress

    evaluation report.

    Testing report

    and progress

    evaluation report.

    Three copies of

    complete PSM I

    report

    PSM I output

    and evaluation

    06/08/200

    7

    Week 5)

    10/09/200

    7

    Week 10)

    241091

    2007

    Week 12)

    15/10/200

    7

    Week 15)

    Completing

    implementation and

    testing phase

    Chapter 5) and

    progress evaluation.

    Completing testing

    phase systeduser

    integration)

    Chapter 6) and

    progress evaluation.

    Completing and

    submit complete

    report draft)

    PSM I presentation

    and evaluation

    07/09/2007

    Week 9)

    281091

    2007

    Week 12)

    12/10/2007

    Week 14)

    19/10/2007

    Week 15)

  • 7/25/2019 Online Test and Quizzes Platform

    27/27

    2 6

    onclusion

    In this chap ter has discussed about test and quizzes and web-based application.

    s

    for the project methodology the prototyping methodology wa s chosen. Choosing the

    correct approach is vital in the dev elopment of a n application as it is hoped that by using

    the ap proach to prototyping methodology c an aid the process of the development of this

    project.

    Th e initial software requirement development tools/equipment operating

    system/server and database have been listening out this chapter. Project schedule and

    milestone has been established in th is chapter as well. Good managem ent of time and

    process and i s a way of assuring the project can be undertaken smoothly. The next

    activities a re to make analysis for this project.