FY11-week 22:

FY11-week 23:

FY11-week 24:

FY11-week 25:

FY11-week 26:

0

24

48

72

96

120

144

168

6142

31

79

12

5

3159

36

29

11

30

38

9

37155 56

3451 48

35

4

3

3

MARCH 2011

HO

UR

S

FY11-week 27:

FY11-week 28:

FY11-week 29:

FY11-week 30:

0

24

48

72

96

120

144

168

8477

68

2 21

5

40

3331

9 37

33 33 38

20

APRIL 2011

HO

UR

S

Page 2: operations

0.0%0.5%1.0%1.5%2.0%2.5%3.0%3.5%4.0%

LINAC_VACUUM

PS_AGS

PPS_AGS

RadMonPermitPull

CntrlsSftwr

CntrlsHdRHIC

Water_RHIC

HumanError

ESHQ

QLIQuenchProtect

CRYO_RHIC

Rf_RHIC

PS_RHIC

PPS_RHIC

ES&FD_AtR

ES&FD_Exp

sum< 1 hr

INTEGRATED FAILURES (GREATER THAN ONE HOUR) BY SYSTEM --APRIL 2011PS_AGS

UPS for RHIC QD systemRADMON_pulls Permit link8XControlsSoftwarereload firmware in QD fecsHuman ErrorBBQ locked on wrong tunes Op-erator procedsESHQPhenix gas leakQLI2 beam induced quenchesQuenchProtectY9d-qpsw bad connectorCryo RHICLead flow interlocks - card in ringRf_RHIC9 MHz tripped off - failed.PS_RHICbo11-tq6, bo3-tq6ES&FD_AtRpsuarc8 breakerES&FD_EXPPhenix Vertex Detector Cooling