CMD 18-H6.62 File / dossier: 6.01.07 Date: 2018-05-07 Edocs: 5529678 Oral Presentation Submission from Greenpeace In the Matter of Ontario Power Generation Inc., Pickering Nuclear Generating Station Exposé oral Mémoire de Greenpeace À l’égard de Ontario Power Generation Inc., centrale nucléaire de Pickering Request for a ten-year renewal of its Nuclear Power Reactor Operating Licence for the Pickering Nuclear Generating Station Demande de renouvellement, pour une période de dix ans, de son permis d’exploitation d’un réacteur nucléaire de puissance à la centrale nucléaire de Pickering Commission Public Hearing – Part 2 June 2018 Audience publique de la Commission – Partie 2 Juin 2018

Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

CMD 18-H6.62

File / dossier: 6.01.07 Date: 2018-05-07

Edocs: 5529678

Oral Presentation Submission from Greenpeace In the Matter of Ontario Power Generation Inc., Pickering Nuclear Generating Station

Exposé oral Mémoire de Greenpeace À l’égard de Ontario Power Generation Inc., centrale nucléaire de Pickering

Request for a ten-year renewal of its Nuclear Power Reactor Operating Licence for the Pickering Nuclear Generating Station

Demande de renouvellement, pour une période de dix ans, de son permis d’exploitation d’un réacteur nucléaire de puissance à la centrale nucléaire de Pickering

Commission Public Hearing – Part 2 June 2018

Audience publique de la Commission – Partie 2 Juin 2018

Page 2: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request
Page 3: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

1

IntolerableRisk:TimetoClosePickering

PreparedbyShawn-PatrickStensilSeniorEnergyAnalystGreenpeaceCanada

May7,2018

Page 4: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

2

1.PreparingforPickering’sEndofLife1.1NojustificationforPickering’scontinuedoperation1.1.1TheNeedforcontingencyplanningandaclosureplan1.1.2LearningfromGentilly-2’sclosure1.2NeedforAStrategicEnvironmentalAssessmentonclosureoptions1.2.1ContingencyPlanningforlong-termwasteStorage1.2.2ConsiderationofalternativestoOPG’spreferredclosurestrategy1.2.3StrategicImpactAssessmentunderthenewImpactAssessmentAct2.IntolerableRisk:TimetoClosePickering2.1OPG’sPeriodicSafetyReview–insufficienttransparency2.2Ariskylocation–thePickeringsite&decliningsafetymargins2.3Emergencypreparedness–provincialmalpractice3.Disclaimer

Page 5: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

3

Recommendations

• GiventhereisnojustificationforPickering’scontinuedoperationfromOPG’sshareholder,theCommissionshouldcategorizeOPG’sapplicationas“anunreasonablerisk”undersection9(i)oftheNuclearSafetyandControlAct.

• IntheeventthattheCommissionapprovestheoperationofPickeringuntil2024,

theCommissionshouldalsoincludearequirementforOPGandCNSCstafftodevelopandpublishcontingencyplanforanearlierclosure,includingworkertransitionplans,beforetheendof2018.

• TheCommissionshouldrequireOPGtopublishplansonhowitwillmitigatethe

negativesocialandcommunityimpactsofPickering’sclosureasrequestedbyDurhamRegion.

• Inlinewithitsmandateundersection9(i)oftheNuclearSafetyandControlAct,

theCommissionshouldrequireOPGtodevelopproposalsformorerobustradioactivewastestoragefacilitiestoensureadequateprovisionismadetoprotectCanadiansandtheenvironmentbeforeitappliesforadecommissioninglicence.PlansformorerobustradioactivewastestoragefacilitiesshouldbeavailableforpublicreviewduringanenvironmentalassessmentbeforeOPGappliesforadecommissioninglicence.

• TheCommissionshouldensureapublicassessmentofalternativestoOPG’s

preferreddelayeddecommissioningstrategy—includingcontingencyplansforlong-termwastemanagementatthesite—takesplacebeforeOPGisallowedtoapplyforadecommissioninglicence.

• TheCommissionshouldrequesttheMinisteroftheEnvironmentandClimate

ChangeconductaStrategicImpactAssessmentofdecommissioningstrategies,includinglong-termwastemanagementstrategies,forthePickeringnuclearstationundersection95oftheproposedImpactAssessmentAct.

• TheCommissionshouldrejectOPG’srequestforanunprecedented10-year

licenceandapproveonlya5-yearlicenceinordertobetteroverseePickering’send-of-operations.

• TheCommissionshouldinstructCNSCstafftostriveforhigherlevelsof

transparencywhilecarryingoutfuturePeriodicSafetyReviews,includingproactivedisclosureofallsafetyimprovementopportunitiesandtheirassociatedcost-benefitanalysis.

Page 6: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

4

• BeforeapprovingOPG’slicencerenewal,theCommissionshouldrequestalistofallsafetyimprovementopportunitiesconsideredduringOPG’sPeriodicSafetyReviewwithaclearjustificationonwhyspecificsafetyimprovementopportunitieswereacceptedorrejected.

• InresponsetotheOntariogovernment’spolicies,whichpromotepopulation

growthandintensificationandtherebyunderminepublicsafetyaroundthePickeringnuclearstation,theCommissionshouldrejectOPG’sapplicationtooperatethePickeringnuclearstationbeyond2020.

• IntheeventthattheCommissionapprovesthecontinuedoperationofPickering

beyond2020,theCommissionshouldincludeadditionallicenseconditionsrequiringOPGtoworkwithitsshareholdertoestablishlimitsonpopulationgrowthwithinthenewlyestablished20kmContingencyPlanningZone(CPZ).

• Inlightoftheprovince’sconsistentmishandlingofnuclearemergencyresponse

planning,theCommissionshouldrejectOPG’sapplicationtooperatethePickeringnuclearstationbeyond2020.

1.PreparingforPickering’sEnd-of-LifeIn2010,theMinistryofEnergyapprovedOPG’splantoclosethePickeringnuclearstation1in2010duetotheprohibitivecostofreactorlife-extensionandlongterm-safetyconcerns.2Goingonlinein1971,butdesignedandbuiltinthe1960s,PickeringwasOntario’sfirstmulti-unitnuclearstation.Itwillalsobethefirstmulti-unitnuclearstationtobepermanentlyclosedanddismantled.AsPickeringquicklyapproachesitsendofoperations,theCommissionmustensureOPGispreparedtoeasethesocialimpactsofthestation’sclosureandopenlyassesshowthewastesproducedoverthepastfourdecadesaresafelystoredatthesite,potentiallyforever.1.1NojustificationforPickering’scontinuedoperationAfoundationalprincipleofradiationprotection–andriskmanagementmoregenerally-isthatanypotentialexposuretoradiationshouldhaveausefuljustificationbeforebeingpermitted.1ThePickeringnuclearstationwillhenceforthbereferredtoas“Pickering”.2ThereasonsforclosingthePickeringstationaredetailedinabriefingnoteprovidedtotheEnergyMinisterin2010.GreenpeaceacquiredthroughFreedomofInformationrequest.See:BriefingNote,preparedbyCedricJobe,January8,2010.

Page 7: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

5

InGreenpeace’sview,thereisnojustificationforPickering’scontinuedoperation.Onthesegroundsalone,theCommissionshouldrejectOPG’srequesttoexposemillionsofpeoplewithintheGreaterTorontoArea(GTA)tothepossibilityofanuclearaccident.In2010,OPGandtheMinistryofEnergyannounceditsproposaltooperatePickeringbeyonditsdesignlife.OPGjustifiedtheriskbyclaimingthestationwouldbeneededuntilnewreplacementreactorscameonlinein2020.However,theOntariogovernmentannounceditwasabandoningplanstobuildnewreactorsduetodecliningelectricitydemand.3Inannouncingtheabandonmentofnewreactors,however,thegovernmentunfortunatelydidnotinstructOPGtoclosethePickeringreactors.Asaresult,Pickeringhasbeentheprincipalcauseoftheprovince’selectricitysurplusesoverthepastdecade.Thus,Pickeringhaseffectivelybeenanunnecessarily–andthusunreasonable–risktotheGTA.In2016,thegovernmentannounceditwouldallowOPGtoexplorethepossibilityofoperatingPickeringbeyond2020byseekingoutappropriateapprovalsfromtheOntarioEnergyBoard(OEB)andtheCNSC.However,thegovernment’s2016Long-TermEnergyPlan(LTEP)isclearthatOPGcanonlyseek“finalapproval”fromthegovernmentafterithasreceivedappropriateapprovalsfromtheCNSCandtheOEB.4Thegovernment’sfinalapprovalofthePickeringcontinuedoperationwillalsoconsidertheneedandcost-effectivenessofoperatingPickeringbeyond2020.AsnotedbyOntario’sEnvironmentalCommissionerthere“…hasbeennoindependentreviewofwhetherthePickeringextensionstillmakesenvironmentalandfinancialsenseforOntario.”5InspiteofOPG’sassertionthatthereisastrongcaseforthecontinuedoperationofPickering,theclaimstheymadeinsupportofthisassertionweredisprovenundercross-examinationattheOEB.6AlthoughOPGprovidedinformationtotheOEBtosupportitsbeliefthatthePickeringlife-extensionwasdesirable,theBoarddidnotconsidertheneedordesirabilityofPickering’scontinuedoperation.TheanalysisOPGprovidedtotheOEBshowedthat

3KeithLeslie,“Ontariokillsplanfor2newnuclearplants;willrebuildexistingreactors,”theCanadianPress,October10,2013.4MinistryofEnergy,Ontario’sLong-TermEnergyPlan2017–DeliveringFairnessandChoice,October2017,pg.51.5EnvironmentalCommissionerofOntario,MakingConnections:StraightTalkAboutElectricityinOntario,April2017,pg.222.6See:SubmissionsofEnvironmentalDefence,EB-2016-0152,May29th,2017;FinalArgumentoftheGreenEnergyCoalition,EB-2016-0152,May29th,2017.

Page 8: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

6

themajorityofPickering’soutputisunneededsurpluspower.7OEBstaffandpublicinterveners,suchasGreenpeace,notedthatsystemmodellingprovidedbyOPGwasout-datedandlikelyoverestimatedelectricitydemandandunderestimatedthesurplusescreatedbyPickering’soperation.Basedontheavailableevidence,theEnvironmentalCommissionerofOntariohasraised“…doubtthatextendedoperationofPickeringisinthebestinterestsofOntarians.”8TheECOhasrecommendedthat“IfPickering’soperatinglicenseisextendedbytheCanadianNuclearSafetyCommission,OntarioshouldreporttothepublicwhetherthePickeringextensionstillmakessense,andifso,why.”9ConsideringriskanduncertaintiesassociatedwithPickering’sageandthestation’slocationwithintheGTA,theCommissionshouldgivesignificantweighttothelackofjustificationforOPG’sapplication.TheCommissionismandatedtoprevent“unreasonablerisk”anditisunreasonabletoallowanunneedednuclearstationtooperateintheGTA.Request:GiventhereisnojustificationforPickering’scontinuedoperationfromOPG’sshareholder,theCommissionshouldcategorizeOPG’sapplicationas“anunreasonablerisk”undersection9(i)oftheNuclearSafetyandControlAct.1.1.1TheNeedforcontingencyplanningandaclosureplanIntheeventthattheCommissionapprovesOPG’sapplicationtooperatePickeringuntil2024,theCommissionshouldimposeadditionallicenceconditionsrequiringOPGandCNSCstaffdevelopandpublishcontingencyplansforthestation’ssafeclosurein2020.GreenpeaceprovidedasubmissiontoCommissionpriortothefirstdayofhearingsconsideringOPG’sapplicationrequestaskingtheCommissionensureOPGprovideadditionalinformationonworkertransitionplanningintheeventthatPickeringclosesin2020,whichiscurrentlyapproved,orin2024,ascurrentlyproposed10.TheCommissionrefusedtoacceptGreenpeace’sinformationrequest.11InGreenpeace’sview,OPGhasnotsufficientlyplannedforsafelyclosingstationdespitehavingannouncedPickering’seventualclosurein2010.However,theeventualclosure7IndependentElectricitySystemOperator,AssessmentofPickeringLifeExtensionOptions–PreparedfordiscussionwithMinistryofEnergy,March9,2015.FiledwiththeOEBonMay5,2016.EB-2016-01-0152,ExhibitF2-2-4,Attachment1,pg.53.8EnvironmentalCommissionerofOntario,MakingConnections:StraightTalkAboutElectricityinOntario,April2017,pg.223.9Ibid,224.10S-PStensil(Greenpeace)totheCNSC,“TransitionplanningforPickering’sworkforce,”letter,April3,2018.11MarcLeblanc(CommissionSecretary)toS-PStensil,“RE:CONFIRMATION:SubmissionforPickeringHearingtomorrow,”email,April5,2018.

Page 9: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

7

ofthePickeringreactorswillnotbeinsignificant.Approximately3000peopleworkatPickeringandisthelargestemployerinDurhamRegion.12AccordingtoOPG’spreliminarydecommissioningplanstaffingwilldroptoapproximately1200whenitshiftsfromoperationstopreparationstosafestorage.13Howthistransitionismanagedoverthenexteighteenmonths(forclosurein2020)oroverthenextfiveyears(forclosurein2024)shouldbegivenappropriatescrutinybytheCommission.Notably,DurhamRegion,whichisthehostcommunityforthePickeringnuclearstation,isconcernedbythelackofplanningforPickering’sclosure.InApril2018itunanimouslysupportedthefollowingresolution:

ThatDurhamRegionrequestsOPGprepareandpublishplansonhowitwillmitigatenegativeimpactsofthestation’sretirement,includingtransitionplansforaffectedworkers,inadvanceofthestations’closure.14

GreenpeaceencouragestheCommissiontodirectOPGandCNSCstafftoimplementDurhamRegion’srequestfortransparenttransitionplanning.Unlikepastlicenceapplications,OPGneedstonotonlydemonstratethatitcanmaintainsafestaffinglevelswhilethereactorsareinoperation,butshowthattheproperplanningisinplacetomitigateanynegativesocialimpactscausedbythestation’sclosure.1.1.2LearningfromGentilly-2’sclosureStatementsmadeduringtheDay1hearingsunfortunatelyshowCNSCstaffhaveyettoacceptandlearnlessonsfromtheclosureofQuebec’sGentilly-2nuclearstationin2012.InGreenpeace’sview,CNSCstaffmisleadinglyportrayedQuebec’sclosureoftheGentilly-2nuclearstationin2012asa“sudden”orunexpectedpoliticaldecision.15By2012,thecostofrebuildingtheGentilly-2hadincreaseddramaticallysinceitwasinitiallyapprovedin2008.Aswell,the2011FukushimadisasterhadrenewedconcernsrelatedtothedesirabilityofrebuildingQuebec’sonlynuclearreactorwhentherewerecheaperandlessriskyalternatives.WhatstaffhavefailedtoacknowledgeisthattheclosureofGentilly-2wasreasonablyforeseeableandCNSCshouldhaverequiredcontingencyplanswhenthestationwasre-licencedin2011.Inresponsetostaff’slackofsituationalawareness,Greenpeace12OntarioMinistryofEnergy,“OntarioMovingForwardwithNuclearRefurbishmentatDarlingtonandPursuingContinuedOperationsatPickeringto2024”,PressRelease,January11,2016.13OntarioPowerGeneration,PRELIMINARYDECOMMISSIONINGPLAN-PICKERINGGENERATINGSTATIONSA&B,P-PLAN-00960-00001,December2016,TableC-1,pg.137.14DurhamRegionalCouncil–Minutes,April11,2018,pg.13.15CNSC,PublicHearing,April4,2018,Ottawa,pg.151.

Page 10: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

8

alertedtheCommissiontothelikelyclosureGentilly-2duringthere-licensingprocess.GreenpeacerequestedthattheCommissionrequireHydro-Quebectodevelopanend-of-lifeplan,includinghowtoaddressjobslostbythestation’sclosure.16Unfortunately,theCommissiondismissedGreenpeace’srequest.AyearlaterthenewlyelectedQuebecgovernmentannounceditwouldclosetheGentilly-2nuclearstation.Thistriggeredawaveofpublicprotestsbyplantworkersandunionswhowererightlyconcernedbylackofworkertransitionplanning.Withoutcleartransitionplanningtheplantclosurewasanunnecessaryandunfairshocktothecommunity.SuchplanningwasexactlywhatGreenpeacehadrequestedduringrelicensinghearingsthepreviousyear.17Inshort,itwouldhavebeenreasonablefortheCNSCtoanticipateandputinplacecontingencyplanswhenGentilly-2wasre-licencedin2011.However,CNSCstaffhadablindspot.NeitherOPGnorCNSCstaffwerepreparedtooverseethesafeclosureofanuclearstationanditstransitiontodecommissioning.Thisisnotsurprising.IthasbeenGreenpeace’sexperiencethattheCNSC’sregulatoryguidanceandrequirementsoftenlagthechallengesfacedbylicencees.18Inlinewiththis,staffacknowledgedtheyonlyrecentlyarticulatedregulatoryexpectationsforPickering’sclosurethrougha“formalletter”19insteadofamoreformallydevelopedregulatoryguide.InGreenpeace’sview,CNSCstaff’sfailuretoproposecontingencyplanningfortheforeseeableclosureofGentilly-2exacerbatedtheimpactsoftheplantsclosure.GreenpeaceurgestheCommissiontolearnfromthispastmistake.OPGdoesnothaveafinalapprovalfromitsshareholdertooperatethestationbeyond2020.TherehasbeennoformalassessmentofwhetherPickering’sextendedoperationisinthepublicinterest.GreenpeaceurgestheCommissionlearnlessonsfromtheclosureofGentilly-2andinstructstaffandOPGtopreparecontingencyplansfortheearlierclosureofPickering.Request:IntheeventthattheCommissionapprovestheoperationofPickeringuntil2024,theCommissionshouldalsoincludearequirementforOPGandCNSCstafftodevelopandpublishcontingencyplanforanearlierclosure,includingworkertransitionplans,beforetheendof2018.16CanadianNuclearSafetyCommission,PublicHearingTranscript,Bécancour,Quebec,April14th,2011,pgs.74–81.17BrigitteTrahan,“ConsultationetGentilly-2:Greenpeaceavaitprévulecoup,”LeNouvelliste,2octobre2012.18AnobviousexampleistheCommission’slateattemptstodeveloparegulatoryframeworkforoverseeingthelife-extensionofreactors.19CNSC,PublicHearing,April4,2018,Ottawa,pg.149.

Page 11: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

9

Request:TheCommissionshouldrequireOPGtopublishplansonhowitwillmitigatethenegativesocialandcommunityimpactsofPickering’sclosureasrequestedbyDurhamRegion.1.2NeedforaStrategicEnvironmentalAssessmentonclosureoptionsGreenpeaceencouragestheCommissiontocorrectahistoricfailureofforesightanddirectOPGtoundertakeastrategicenvironmentalassessmentofoptionsfordismantlingthePickeringnuclearstationandsecuringtheradioactivewasteithascreated.Unfortunately,thePickeringnuclearstationwasapprovedwithoutanenvironmentalassessment.Itwasallowedtooperatebasedonthepromisethattheradioactivewastesproducedbythestationwouldbesenttootherwastemanagementfacilities.Thiswastheantithesisofaprecautionaryapproach.What’smore,thestation’scommunityacceptance–whatwenowcall“sociallicence”-hasbeenbasedonthispromise.Thispromisemayhavemisledthecommunity. Overthepastfourdecades,Pickeringhasproducedover18,000tonnesofhigh-levelnuclearfuelwasteaswellasotherlong-livedradioactivewastes.Thedismantlingofthestationwillalsoproducemorelong-livedradioactivewastes.Thestation’soperationhasalsocausedlandcontamination,althoughthereislimitedinformationinthepublicdomainonthemagnitudeofthispollutionandtowhatextentitcouldberemediated.WithPickeringnowapproachingitsendoflife,itisincumbentongovernmentauthoritiestocompensateforpastineffectiveoversightofOPG’soperations.Specifically,GreenpeaceencouragestheCommissiontosupportaStrategicImpactAssessment(SIA)oncethegovernment’sproposedImpactAssessmentAct(BillC-69)gainsRoyalAssent. ASIAisneededtoaddresstotwosignificantpolicyissuesoverlookedduetothehistoricfailuretoreviewnuclearpowerprojectsinaprecautionarymanner.Specifically,SIAisneededtoreviewalternativestoOPG’scurrentdecommissioningpolicyandtoassesscontingencyplansforsafelystoringradioactivewasteatthePickeringsite.1.2.1ContingencyPlanningforLong-termwastestorageConsideringOPG’sfailuretodevelopadependableoff-siteplanformanagingPickering’sradioactivewastes,itisreasonableandprudenttopreparelong-termon-sitemanagementoptionsfortheradioactivewastesproducedbyPickeringsince1971.However,therearenosuchoptionsdiscussedinOPG’sdecommissioningstrategy.Ina2017submissiontotheExpertPanelreviewingCanada’senvironmentalassessmentprocess,DurhamRegionlamentedthefactthatenvironmentalreviewsofreactorlife-

Page 12: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

10

extensionprojects,includingOPG’sabandonedproposaltorebuildthePickeringBreactors,havenotrequiredreactoroperatorstoprovidereliableproposalsforthelong-termstorageofradioactivewaste.DurhamRegionrecommendedthat“Approvalofanuclearprojectshouldrequireaproponenttohaveanuclearwastedisposalsolutionavailablebeforethenew/refurbishednuclearreactorsarepermittedtooperate.”20AlthoughDurhamRegion’srequestisreasonableandinlinewiththeprecautionaryprinciple,theCNSChasneveraskedOPG,BrucePower,Hydro-QuebecorNewBrunswickPowertoprovidereliablelong-termwastemanagementsolutionsduringenvironmentalreviewsofreactorlife-extensionproposals.InGreenpeace’sview,theCNSChasperpetuatedthefailureofpreviousgovernmentauthoritiestorequirecrediblelong-termnuclearwastemanagementfacilitiesasaconditionoflicensing.GreenpeaceurgestheCommissiontoconstructivelyremedythisfailureofforesightnowthatPickeringisreachingitsend-of-life.Notably,theJointReviewPanel(JRP)thatassessedOPG’sproposaltobuildnewreactorsattheDarlingtonnuclearstationfoundthatitwasreasonabletoplanforthepossibilitythatanoff-sitewastestoragefacilityisnotestablished.TheJRPrecommended:

…thatpriortoconstruction,theCanadianNuclearSafetyCommissionrequireOPGtomakeprovisionsforon-sitestorageofallusedfuelforthedurationoftheProject,intheeventthatasuitableoff-sitesolutionforthelong-termmanagementforusedfuelwasteisnotfound.21

TheJRPalsorecommendedthatOPGmakeequivalentprovisionsforthelong-termon-sitestorageforintermediate-levelradioactivewastes.22ThegovernmentofCanadaacceptedtheintentoftheserecommendations,observingthatCanada’s1996RadioactiveWastePolicyFrameworkstatesradioactivewasteownersareresponsiblefordevelopingandimplementingwastemanagementstrategies.23TheJRP’srecommendationshaveturnedouttobeprescient.AfteronlyadecadeofplanningtheNuclearWasteManagementOrganization(NWMO)timelinesfortheopeningofafuel-wasteDGRhavebeendelayedbyadecade.In2005,theNWMO

20GarryCubitt(ChiefAdministrativeOfficer,DurhamRegion)toKevinBlair(MajorProjectsManagementOffice,NaturalResourcesCanada),“EnvironmentalandRegulatoryReviewsDiscussionPaper,”August28,2017.21JointReviewPanel,EnvironmentalAssessmentReport:DarlingtonNewNuclearPowerPlantProject,August2011,pg.118.22Ibid.23GovernmentofCanada’sResponsetotheJointReviewPanelReportfortheProposedDarlingtonNewNuclearPowerPlantProjectinClaringtonOntario,CanadianEnvironmentalAssessmentRegistry:07-05-29525,May2,2014.

Page 13: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

11

claimedaDGRwouldbeopenin2035.24In2018,theNWMOacknowledgethatitsfuelwasteDGRwouldnotopenuntilapproximately2045.25Itisreasonabletoexpectadditionaldelays. However,thereasoningbehindtheJRP’srecommendationsforthewastesproducedbynewreactorsisalsoapplicabletoPickering’swastes.The“offsitesolutions”OPGclaimswillbeavailableforPickering’swastesarethesameoffsitesolutionsOPGclaimedwouldacceptwastefromnewreactors. However,neitherOPGnortheCNSChasacknowledgedthereasonablyforeseeablepotentialforthefuelwasteDGR(ortheDGRcurrentlyproposedtostoredecommissioningwaste)tobeeithersignificantlydelayedornevercompleted.Inshort,withoutpro-activeattentiontheinterimPickeringWasteStorageFacility(PWSF)could,de-facto,becomealong-termstoragefacility.ThisisproblematicbecausePickering’scurrenttemporarywastestoragestructuresarenotreinforcedordesignedtowithstandaterroristattackorerraticandextremeweatherevents.Otherwiseput,thelikelydelayorabandonmentofplannedDGRswillmeanradioactivewasteposesalong-termthreattotheGreatLakesandsurroundingcommunitythatrequiresalternativesassessmenttobedonetoday.ItisthusreasonablyforeseeablethattheradioactivewastesthathaveaccumulatedatPickeringwillremainatthesiteinthelong-term.ThisraiseslegitimatequestionswhetherOPGhasmadeadequateprovisionstopreventunreasonablerisktoCanadiansocietyundersection9(i)(a)oftheNSCA. IntheUnitedStates,thedevelopmentofaDGRforfuelwastehasalsoundergonesignificantdelays.Inresponse,communityandcivilsocietyorganizationshavebeenadvocatingforHardenedOn-SiteStorage(HOSS).Over150U.S.-basedorganizationshaveendorsedtheprinciplesofHOSS.Theseprinciplesinclude:

• Irradiatedfuelmustbestoredassafelyaspossibleasclosetothesiteofgenerationaspossible.Wastemovedfromfuelpoolsmustbesafeguardedinhardened,on-sitestorage(HOSS)facilities.

• TheoverallobjectiveofHOSSshouldbethattheamountofreleasesprojectedinevensevereattacksshouldbelowenoughthatthestoragesystemwouldbeunattractiveasaterroristtarget.

• HOSSfacilitiesmustnotberegardedasapermanentwastesolution,andthusshouldnotbeconstructeddeepunderground.Thewastemustberetrievable,

24NWMO,ChoosingaWayForward-TheFutureManagementofCanada’sUsedNuclearFuelFinalStudy,2005.25NWMO,Movingtowardspartnership–2017AnnualReport,pg.10.

Page 14: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

12

andreal-timeradiationandheatmonitoringattheHOSSfacilitymustbeimplementedforearlydetectionofradiationreleasesandoverheating.26

ThepossibleneedtosecurelystoreradioactivewastesatthePickeringshouldbeofparticularconcernduetothestation’slocationontheshoresofLakeOntarioandwithintheGreaterTorontoArea(GTA).WithPickeringnowapproachingitsend-of-life,itisincumbentongovernmentauthoritiestocompensateforpastineffectiveoversightofOPG’soperations.Thisineffectiveoversighthascreatedradioactivewastewithoutconfirmedplansformanaginglong-livedradioactivewastes.ThisrequiresaprecautionaryassessmentofOPG’sdecommissioningstrategy. WemustconsiderthepossibilitythatfuelwasteanddecommissioningwastescreatedbyPickeringmayendupatthesitepermanently-oratleastforaveryextendedperiod.ThisisconcerningbecauseofPickering’sproximitytoTorontoandtheGreatLakes. Request:Inlinewithitsmandateundersection9(i)oftheNuclearSafetyandControlAct,theCommissionshouldrequireOPGtodevelopproposalsformorerobustradioactivewastestoragefacilitiestoensureadequateprovisionismadetoprotectCanadiansandtheenvironmentbeforeitappliesforadecommissioninglicence.PlansformorerobustradioactivewastestoragefacilitiesshouldbeavailableforpublicreviewduringanenvironmentalassessmentbeforeOPGappliesforadecommissioninglicence. 1.2.2ConsiderationofalternativestoOPG’spreferredclosurestrategyTheCommissionshouldensurethattheenvironmental,economicandsocialimpactsofalternativestoOPG’sproposedplanarepubliclyevaluatedbeforethecompanycanapplyforadecommissioninglicence.AStrategicImpactAssessmentwouldbeanappropriatemeanstoopenlyconsidersuchalternatives.OPG’sproposeddecommissioningstrategyproposestodeferthedismantlingandcleanupthePickeringsitedefersfordecades.ItisevidentthatOPG’sproposeddecommissioningapproachprioritizesthecompany’sfinancialinterests–deferringoravoidingcosts-overthepossiblesocialimpactsandenvironmentalrisksofdelayingthecleanupofthesite. OPG’scurrentplanassumesthecompanywillreceivea“decommissioninglicence”in2028.ThreeactivitieswouldbepermittedunderthisdecommissioninglicenceSafeStorage,Dismantling,andSiteRestoration.Undertheplan,theplantwilllaydormantinSafeStoragefortwenty-twoyearsuntil2050beforedismantlingthestationbegins.OPG’sdecommissioningplanassumesonlyfortystaffwillrequiredonsiteduringthis26PrinciplesforSafeguardingNuclearWasteatReactors,availableat:https://bit.ly/2HufE1i

Page 15: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

13

period.27Suchadramatictransitioncouldhavenegativesocialandeconomicimpactsonthesurroundingcommunity. TherearenoindicationsinOPG’slicenceapplicationthatitplanstocarryoutanenvironmentalassessmenttoevaluatethepotentialenvironmentalandsocialimpactsofitsdecommissioningstrategycomparedtoalternatescenarios.Thus,withoutinstructionfromtheCommission,preferreddecommissioningapproachisacceptedasafaitaccompli.InGreenpeace’sview,thisisimprudent. Asdiscussed,acentralassumptionofOPG’sdecommissioningstrategyisthatradioactivewasteswillbetransferredtooffsitestoragefacilities.However,thisassumptionisunwarrantedandwouldimpactboththetimelinesandtheend-pointspresentedinOPG’sdecommissioningstrategy.Thisshowsaneedtoassessalternativescenarios.Moreover,OPG’sassumptionthatdelayedreactordismantlingisthebestchoiceforthesurroundingcommunityandenvironmentalprotectionshouldbequestioned.Giventheforeseeablesocialimpactsandenvironmentalrisks,thepublicshouldbeconsultedonalternativestoOPG’sfinancialpreferencetodelaydismantlingwork,includingthesocialandcommunityimpactsassociatedwithOPG’spreferreddelayeddecommissioningstrategy.ThereisalsoaneedtogatherandpubliclyreviewinformationontheaccumulatedcontaminationatthePickeringsite.TheextentandnatureofsuchcontaminationmayimpactOPG’sassumptionthatthesitecouldbecompletelyremediated.Again,thismayrequireexaminingalternativedecommissioningstrategies. InGreenpeace’sview,thecurrentplantoproceedwithOPG’sdecommissioningstrategyisimprudentandmayleadtoavoidableadversesocialandenvironmentaleffects.Akeyaspectofanenvironmentalassessmentisinformationgathering.Atpresent,thereisinsufficientinformationonthecontaminationatthePickeringsite.Thereisalsoinsufficientinformationontheimpactsofdeferred,promptorstaged28approachestostationdismantling.AstrategicenvironmentalassessmentofalternativedecommissioningapproachesisanappropriatemechanismforensuringthepublichasaccesstotherisksposedbythePickeringsiteandthepossiblesocialandeconomicimpactsofOPG’sactivities.The

27OntarioPowerGeneration,PRELIMINARYDECOMMISSIONINGPLAN-PICKERINGGENERATINGSTATIONSA&B,P-PLAN-00960-00001,December2016,pg.137. 28DebateondecommissioningtendstofocusonOPG’spreferencefordelayeddecommissioningversusproposalstoimmediatelydismantlethestationuponclosure.Athird“staged”approachcouldalsobeconsideredwherethedismantlingofthestationoccursafterthelastofthefuelwasteistransferredfromfuelpoolstodrystorage.ThiscouldreducethesafestoragephaseofOPG’scurrentplanbyatleastadecade.

Page 16: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

14

informationgatheringactivitieswillalsoensurethattheCommissionhastheappropriateinformationtoensurethatOPGwillpreventunreasonableriskandprotectboththeenvironmentandhumanhealthunderafuturedecommissioninglicence.Inlightoftheuncertaintiesrelatedtooffsitewastemanagement,GreenpeacedoesnotbelievetheCommissionhasadequateinformationtoproperlyassessafutureapplicationforadecommissioninglicence,whichwilllikelyalsoapprovealong-termwastemanagementstrategyforthesite.Request:TheCommissionshouldensureapublicassessmentofalternativestoOPG’spreferreddelayeddecommissioningstrategy—includingcontingencyplansforlong-termwastemanagementatthesite—takesplacebeforeOPGisallowedtoapplyforadecommissioninglicence.1.2.3StrategicImpactAssessmentunderthenewImpactAssessmentActInlightoftheoutstandinguncertaintiesrelatedtothemanagementofradioactivewastesandtheneedtodevelopasocialacceptanceforadecommissioningapproachforthePickeringsite,GreenpeaceurgestheheCommissiontoasktheandMinisteroftheEnvironmentandClimateChangetoconductaStrategicImpactAssessmentofdecommissioningstrategiesforthePickeringnuclearstation.Tobeclear,GreenpeacedoesnotconsidertheenvironmentalassessmentscarriedoutundertheNuclearSafetyandControlAct(NSCA)asequivalentoranadequatereplacementforEAsthathavebeencarriedoutundertheformerCanadianEnvironmentalAssessmentAct(CEAA).DuetotheirlimitedscopeNSCAEAsarenotwellsuitedforevaluatingthebroaderpolicyissuesrelatedtohowPickeringshouldbedecommissioned.CNSC-ledenvironmentalreviewshavefocusedonmereregulatorycompliance,whileoverlookingwhetheraprojectadvancesorharmsprogresstowardsustainabledevelopment.Thereviewshavealsofailedtoconsiderthepolluter-paysprinciple.CNSCstaffhavevalidatedGreenpeace’sconcern,admittingthattheylacktheexpertiseandknowledgetoassessaproject’ssustainability.29Thustheneedforanimpartialandexpertenvironmentalreviewisclear.EnvironmentalreviewsundertheNSCAarearelativelynewphenomena.ThescopeofNSCAreviewsisdeterminedbyREGDOC-2.9.1:EnvironmentalProtection:Environmental29DuringtheenvironmentalassessmenthearingsonOPG’sproposaltobuildaDeepGeologicalRepository(DGR)fornon-fuelradioactivewastes,CNSCstaffstatedtheyonlyconsiderwhetheraprojectwillmeetexistingregulatoryrequirementstoprotecttheenvironmentandrelyonEnvironmentCanadaorprovincialgovernmentstocarryoutassessmentsofaproject’ssustainability.See:CanadianEnvironmentalAssessmentAgency,DeepGeologicalRepositoryforlowandintermediatelevelradioactivewasteproject,JointReviewPanel,Transcripts,Thursday,October3,2013,Volume15,pgs.182-185.

Page 17: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

15

Principles,AssessmentsandProtectionMeasures.TheEAproducedforthecurrentlicencerenewalissuchanEA.Althoughthe2017versionofREGDOC-2.9.1liststheprecautionaryprinciple,the“polluterpays”principle,andtheconceptofsustainabledevelopmentasguidingprinciplesofCNSCEAs30,theenvironmentalreviewproducedforthecurrentlicenseapplicationdidnotincorporatesustainabilityconcerns.31InGreenpeace’sview,thisisadditionalevidencetheCNSC’slackofexpertiseinsustainabilityassessment.Forthesereasons,GreenpeaceurgestheCommissiontoasktheMinisteroftheEnvironmenttoconductastrategicimpactassessmentofdecommissioningoptionsforthePickeringnuclearstationunderSection9532oftheproposedImpactAssessmentAct.StrategicImpactAssessmentsareappropriateforinvestigatingbroaderpolicyissues,includingcomparingalternativeapproachestopolicyimplementation.TheExpertPanelthatreviewedthefederalgovernmentsenvironmentalassessmentapproachin2016arguedthatanewSIA“…modelshouldbeputinplacetoprovideguidanceonhowtoimplementexistingfederalpolicies.”Consideringtheoutstandingissuesrelatedtolong-termwastemanagementanddecommissioningapproach,usinganSIAtoreviewOPG’sdecommissioningstrategywouldprovidebetterguidanceonhowtoimplementafederalgovernmentpolicy.Althoughthefederalgovernment’sRadioactiveWastePolicyFrameworkassumesthatwasteproducersareresponsibleforthefundingandmanagingofradioactivewastes,itassignsthefederalgovernmentwillensurewastethatradioactivewastemanagement“iscarriedoutinasafe,environmentallysound,comprehensive,cost-effectiveandintegratedmanner.”33Thefederalgovernmenthasnotclarifiedhowitwillensurethesafemanagementofradioactivewasteintheeventthatoff-siteradioactivewastesolutionsdonotcometofruition.Thus,aStrategicEnvironmentalAssessmentcouldbeanappropriatemeansofdevelopingguidanceonhowthisfederalpolicyshouldbeimplemented.

30CNSC,REGDOC-2.9.1:EnvironmentalProtection:EnvironmentalPrinciples,AssessmentsandProtectionMeasures,Section2.1,April2017,pg.6.31CanadianEnvironmentalLawAssociation(CELA),EvaluatingEmergencyPreparednessandEnvironmentalProtectionforthePickeringNuclearGeneratingStationLicenceRenewal(Ref.2018-H-03),PreparedbyKerrieBlaise,RizwanKhanandTanyaMarkvart,May7,2018,CELAPublicationNo:978-1-77189-895-9.32Section95oftheproposedImpactAssessmentActstates“TheMinistermayestablishacommittee — orauthorize theAgency — toconductanassessmentof (a) anyGovernmentofCanadapolicy,planorprogram — proposed or existing — that is relevant to conducting impact assessments; or (b) any issuethat is relevant to conducting impact assessments of designated projects or of a class of designatedprojects.”33MinistryofNaturalResources,RadioactiveWastePolicyFramework

Page 18: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

16

TheExpertPanelalsonotedthat:“UndertheCabinetDirectiveontheEnvironmentalAssessmentofPolicy,PlanandProgramProposals(“CabinetDirective”),Canadanowimplementsstrategicenvironmentalassessmenttoincorporateenvironmentalconsiderationsearlyinthedevelopmentofaplan,policyorprogram,alongwitheconomicandsocialconsiderations.”ThisCabinetDirectivesupportsanupfrontreviewofOPG’sdecommissioningstrategytoensurelocaleconomicandsocialconcernsinformthefinaldecommissionstrategy. Request:TheCommissionshouldrequesttheMinisteroftheEnvironmentandClimateChangeconductaStrategicImpactAssessmentofdecommissioningstrategies,includinglong-termwastemanagementstrategies,forthePickeringnuclearstationundersection95oftheproposedImpactAssessmentAct.

2.Intolerablerisk:timetoclosePickeringThePickeringnuclearstation’slocation,out-dateddesignandagingcomponentsmakeitanunreasonablerisktoCanadiansocietyandtheenvironment.Initsdeliberations,GreenpeaceencouragestheCommissiontoconsiderOPG’sshareholder-theOntariogovernment–astheactualproponentofOPG’slicenceapplication.TheprovincewillultimatelyapproveorrejectwhetherOPGcancontinueoperatingthestation.ItappointsOPG’sboardofdirectorsandsetsthescopeofOPG’sbusinessplansthroughaMemorandumofUnderstanding.Aswillbediscussed,theOntariogovernmentdeterminesthelevelofoffsitesafetythroughitsresponsibilityforlanduseplanningandemergencypreparedness.TheCNSCshouldjudgetheprovince’sperformanceinsafeguardingpublicsafetyinthemanneritconsidersOPG’smaintenanceofonsitesafety.TheprovincehaspromotedpoliciesthathaveincreasedtheriskimposedbyPickeringonsurroundingcommunities.Ithasalsomismanageditsresponsibilityforoffsitenuclearemergencyresponse.Consideringtheprovince’strackrecord,itisdoubtfulthattheprovince–andbyextensionOPG–willmakeadequateprovisiontoprotectCanadians.ThesearegroundsforrejectingOPG’slicenceapplicationorimposingadditionallicenceconditions.Asdiscussed,themajorityofPickering’soutputissurplus.ItsoutputisboughtbytheIndependentElectricitySystemOperator(IESO)andsoldatlosstoneighbouringU.S.states.Thecostoftheselossesispaidforbyratepayers.WhileOntarioconsumerspayforPickering’soperations,theOntariogovernmentbenefitsfromaperverseincentive:itreceivesdividendsfromOPGevenifPickering’spowerisunneeded.

Page 19: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

17

InGreenpeace’sview,theincestuousrelationshipbetweenOPGanditsgovernmentshareholdercallfortheCommissiontobemorescepticalofOPG’slicenceapplication.OPGisrequestinganunprecedented10-yearlicenceaswellaspermissiontocontinueoperatingthePickeringreactorsuntil2024.IthasalsorequestedalicenceconditionthatwouldallowittoextendPickering’soperationagainwithoutthescrutinyofalicencerenewalprocess.OPG’srequestfora10-yearlicenceiseffectivelyaskingtheCommissionforlessregulatoryandpublicoversightastheriskfromthestationisincreasingfrombothagingeffectsandincreasingpopulationdensitiesaroundthestation.Incontrast,GreenpeaceurgestheCommissiontoconsidertheneedformoreoversightinlightofPickering’sageandlocation.Request:TheCommissionshouldrejectOPG’srequestforanunprecedented10-yearlicenceandapproveonlya5-yearlicenceinordertobetteroverseePickering’send-of-operations.2.1OPG’sPeriodicSafetyReview–InsufficienttransparencyThePeriodicSafetyReview(PSR)OPGhasprovidedaspartofitslicenceapplicationlackssufficienttransparencyandintelligibilitytosupportthecontinuedoperationofthePickeringreactors.APSRassessestheexistingnuclearstationagainstmodernstandardstoidentifyenhancementstoreducethegapbetweenthecurrentdesignandmodernstandards.GreenpeaceisconcernedOPG’sapproachtothesesafetyenhancementshasprioritizeditsfinancialinterestsoverthehigherlevelsthatshouldbeexpectedofanuclearstationoperatinginsuchadenselypopulatedarea.In2010,OPGabandonedproposalforextendingPickering’soperationsforanotherthreedecadesduetothehighcostandthelimitedcapacitytoimprovethesafetyofPickering’sout-dateddesign.ThisisverydifferentfromthenarrativeOPGisusinginthecurrentproceedings.InthebriefingnoteprovidedtotheMinisterofEnergyin2010,whichsummarizedwhythePickeringlife-extensionshouldbeabandoned,Ministrystaffnoted:

“Costbenefitanalysisshowedthatlittlesafetyimprovementwouldhavebeenderivedasaresultofinvesting100Mdollarswouldresultinlittlesafetyimprovement.“34

34CedricJobe,BriefingNote,January8,2010.AcquiredthroughFreedomofInformationlegislation.

Page 20: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

18

ThebriefingalsoacknowledgedthatthePickeringreactors“…donotmeetmodernstandards”andthat“…thereexistshighpotentialfordiscoveryofdefectswhichwouldmakerefurbishmentunfeasible.”35ThebriefingtotheMinisteralsoacknowledgedthattheCNSC’snewrequirementtocarryoutaPSRonceadecade“….resultsinthepotentialneedforsignificantplantupgradesinthefuture.”36Curiously,thePSRthatOPGisusingtojustifyPickering’scontinuedoperationdoesnotproposesignificantupgradestothestationdespitethestation’sout-of-datedesignanddegradingcomponents.GreenpeaceisconcernedthatOPGisusingrepeatedrequestsfortime-limitedserviceextensionstoavoidthemoresignificant-andexpensive–safetyupgradesanticipatedforlonger-termextensions.AlthoughthereisaclearpublicexpectationthatPickeringshouldmeethigherlevelsofsafety,OPGhasafinancialinterestinminimizingcostlysafetyupgrades.In2013,OPGaskedtocontinueoperatingthestationforanadditionalsixyears.Incomparisontothecost-benefitanalysiscarriedoutpreviouslytoevaluatetherefurbishmentandlife-extensionofthePickeringnuclearstation,thecostbenefitanalysiscarriedoutbyOPG’sin2013wouldhaveascribedlessvaluetosafetyimprovementsbecausetheirbenefitswouldbelimitedonlysixyearperiod.Inthecurrentapplication,OPGisaskingtooperatethestationforanadditionalfouryears.Tokeepcostsdown,OPGappearstohaveagainrequestedtheCNSCacceptareducedvaluationofsafetyimprovementsduetotheirlimitedduration.Inits2015TechnicalandEconomicAssessmentofPickeringExtendedOperationsbeyond2020,OPGacknowledgedthattheCNSC’sacceptanceofevaluatingsafetyimprovementsbythelimitedvaluetheywouldprovideoverfouryearsofadditionaloperation.OPGacknowledgeditneededtoestablish“…withcertaintytheregulatoryrequirementsandhowtheseinterrelatetothetimingoftheendofextendedoperations…”37OPGalsostatedthatit“…isconfidentthatalistofreasonableandpracticablesafetyenhancementscanbereachedwiththeCNSCstaffinviewofthe4yearsofadditionaloperationthatissought.”38ConsideringPickering’sout-of-datedesignanditslocation,theCommissionshouldprioritizethepublic’sexpectationforsafetybeforeOPG’sfinancialinterests.Itshouldalsorememberthatin2013OPGtoldtheCommissionandthepublic.itwouldonly

35Ibid.36Ibid.37OPG,TechnicalandEconomicAssessmentofPickeringExtendedOperationsbeyond2020,October2015,pg.10.38Ibid.

Page 21: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

19

operatePickeringuntil2020.NowOPGclaimingitwillonlyoperatePickeringuntil2024,buthasalicenceconditionthatwouldallowittoextendthelifepast2024.However,itisunclearwhatagreementsCNSCstaffhavemaderelatedtotheevaluationofsafetyupgrades.WithoutsuchinformationGreenpeacedoesnotbelievetheCommissioncanreliablyconcludethatsufficientactionhasbeentaketoensuretheprotectionofthepublicundertheNuclearSafetyandControlAct.In2016,GreenpeacefiledarequestunderAccesstoInformationlegislationforall“…internaldocuments,meetingminutes,andcorrespondencediscussingpotentialsafetyenhancementsinlightofOPG'sdesiretoextendPickering’soperationfor4additionalyears.ThisshouldincludeanythingdiscussionhowCNSCstaffwilldeterminewhatenhancementswillbeconsideredreasonablypracticalinlightofthe4additionalyearsofoperation.”39TheCNSCrefusedtoprovideanyinformationinresponsetothisrequest.Given,OPG’seconomicincentiveinminimizingsafetyupgrades,Greenpeaceisconcernedbystaff’slackofopennessrelatedtowhatconstitutesacosteffectivesafetyupgrade.WithoutsuchtransparencythepublicisdeprivedoftheinformationitneedstomeaningfullyassesstheconclusionsofOPGandCNSCstaff.ItshouldbenotedthatGreenpeacehasobservedasignificantdeclineinCommissiontransparencysince2016.TheCommissionhasrefusedaconsiderablenumber–ifnotthemajority-ofAccesstoInformationrelatedtoOPG’sPSR.Incontrast,CNSCstaffweremuchmoreopenandencouragedproactivedisclosurewhenPickeringunderwentitsfirstPSR40adecadeago.InformationreleasedadecadeagoisnowwithheldbytheCommission.Itisunclearwhy.Insum,theCNSChasloweredthebarontransparencyinrecentyearsandwithitthecredibilityandtrustworthinessofsafetyitssafetyclaims.OPGhasanobviousfinancialincentivetominimizesafetyimprovements.Tobecredible,thecriteriaandanalysisusedtodeterminewhatsafetyimprovementsarecost-effectiveandwhatimprovementsaretoocostlyshouldbeopentopublicscrutiny.Request:TheCommissionshouldinstructCNSCstafftostriveforhigherlevelsoftransparencywhilecarryingoutfuturePeriodicSafetyReviews,includingproactivedisclosureofallsafetyimprovementopportunitiesandtheirassociatedcost-benefitanalysis.Request:BeforeapprovingOPG’slicencerenewal,theCommissionshouldrequestalistofallsafetyimprovementopportunitiesconsideredduringOPG’sPeriodicSafetyReview

39A-2016-0015040Atthetime,theCNSCreferredtoPSRsasIntegratedSafetyReviews(ISR).

Page 22: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

20

withaclearjustificationonwhyspecificsafetyimprovementopportunitieswereacceptedorrejected.2.2Ariskylocation–thePickeringSite&decliningsafetymarginsTheCommissionshouldrejectOPG’sapplicationtooperatethePickeringnuclearstationbeyond2020inresponsetotheOntariogovernment’spromotionofpoliciesthatincreasetheriskposedbythestation.Asdiscussed,theOntariogovernmentisOPG’ssoleshareholderandtheeffectiveproponentofOPG’sapplicationtocontinueoperatingPickering.InGreenpeace’sview,theCommission’sassessmentofOPG’sapplicationshouldconsiderwhetheritsshareholderhasmadeadequateprovisionfortheprotectionoftheenvironmentandhumanhealthwhereveritspoliciesimpactthesafetyofthePickeringnuclearstation.UndertheCNSC’sdefence-in-depthsafetyapproach,theOntariogovernmenthassignificantresponsibilitiesthatshouldbeconsideredduringtherelicensingofanyOPGfacility.Defence-in-depthisaseriesofdefencelevelsthatseektopreventaccidentsfromoccurring,butensureappropriateprotectionisprovidedtothepublicandtheenvironmentifpreventionfails.41AstheauthorityresponsibleforoffsitepublicsafetyandasOPG’sshareholder,theprovinceshouldbeheldaccountablefortheadequacyofthefifthlevelofdefence-in-depth,whichaimstomitigatetheimpactsofradioactivereleasesoncetheyoccur.Twokeyareasofprovincialoversightdeterminewhetherthefifthlevelofdefence-in-depthisadequateundertheNuclearSafetyandControlAct:landuseplanningandemergencypreparedness.Ontario’slanduseplanningpoliciesencouragepopulationgrowthacrosstheGTAgenerally,includingthePickeringnuclearstation.SuchpolicieshaveincreasedtheriskposedbythePickeringnuclearstationbyincreasingthenumberofpeoplewhomaybedisplacedorexposedtoradiationintheeventofanaccident.Theprovince’sgrowthplanidentifiesdowntownPickeringasurbangrowtharea.42DowntownPickeringislessthan10kmfromthePickeringnuclearstation.ByincreasingpopulationdensityaroundPickering,theOntariogovernmentismakingtheimplementationofemergencymeasuresmorelogisticallychallengingandlesseffective.

41CNSC,REGDOC-2.5.2PhysicalDesignofReactorFacilities:NuclearPowerPlants,May2014,Section4.3.1,pg.7.42MinistryofInfrastructure,GrowthPlanfortheGreaterGoldenHorseshoe,2006,OfficeConsolidationJune2013,pgs.16-17,65.

Page 23: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

21

Notably,thegovernmentofOntariohasknowinglyerodedsafetymarginsaroundthePickeringsite.InthebriefingnoteprovidedtotheMinisterofEnergyin2010,MinistrystaffadmittedPickering’slocationmadeitriskytoextendthelifeofthePickering.TheMinister’sbriefingstated:

“Theabilitytocontinuetooperatefor30yearsinatargetedpopulationgrowtharea(asdefinedbytheProvinceofOntario)alsocarriesthepotentialforsignificantregulatorysanctioninresponsetopublicintervention.”43

Otherwiseput,theOntariogovernmentisawarethatitspolicyofencouraginggrowtharoundthePickeringnuclearstationisobjectionable.Thus,OPG’sshareholderisintentionallyreducingthesafetyofPickeringnuclearstation.InGreenpeace’sview,theCommissionhasaresponsibilitytopenalizelicenceesifthereisevidencethattheyhaveknowinglyincreasedrisktothepublic.ThiscanbedonebyeitherrejectingOPG’sapplicationorbyaddingadditionallicenceconditions.Theprovincehasalsorefusedtomodifyitspolicies.In2016,GreenpeaceandtheCanadianEnvironmentalLawAssociation(CELA)filedarequestforapolicyreviewunderOntario’sEnvironmentalBillofRights.InourrequestweaskedaskingtheMinistryofMunicipalAffairstoreviseitslandusepoliciestakingintoaccounttheneedtoencouragepublicsafetyinsteadofpopulationgrowthnearnuclearstations.44Theprovincedismissedourrequest.Thus,althoughprovidedanopportunitytoreviseitslanduseplanningpoliciestoencouragenuclearsafety,theprovincehasrefusedtomodifyitspoliciestotakeintoaccountitsresponsibilityasOPG’sshareholdertoensureadequateprotectionandCanadiansundertheNuclearSafetyandControlAct.ItshouldalsobenotedthatCommissionstaffhaverepeatedlydecidedagainstestablishingclearcriteriaforjudgingthesitesuitabilityofanuclearpowerplant.In2018,theCNSCfinallyreleasedanupdatedpost-Fukushimasitesuitabilityguide,REGDOC-1.1.1SiteEvaluationandSitePreparation.GreenpeaceandCELArequestedthisnewsitingguideacknowledgetheneedtoforprovincialauthoritiestodiscouragepopulationgrowthandinappropriatelanduseoverthelifeofanuclearfacility.Unfortunately,Commissionstaffrefused,statingthat:“…landuseisunderprovincial/territorialjurisdiction,andregions/municipalitiesandapplicantsmustadheretoprovincial/territoriallegislationregardinglanduse.”45

43CedricJobe,BriefingNote,January8,2010.ObtainedthroughFreedomofInformationlegislation.44CELA,DurhamNuclearAwarenessandGreenpeace,ApplicationforReviewtotheMinistryofMunicipalAffaires,September26,2016.45DetailedCommentsReportDraftREGDOC-1.1.1,LicencetoPrepareSiteandSiteEvaluationforNewReactorFacilitiesPublicconsultation:August11,2016–November14,2016andFeedbackoncomments:Dec.7to29,2016,Edoc#5117698,pg.70

Page 24: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

22

InlightofOntario’songoingactionstoundermineoffsitepublicsafety,Greenpeacebelievesstaff’sdeferencetoprovincialpolicyisuntenableundertheNuclearSafetyandControlAct.Inrenderingitsdecision,theCommissionshouldexerciseitsauthorityundertheActtoreduceoreliminatetheunreasonableriskposedbyPickering.TheCommissionshouldalsobeawarethatstaff’sdecisiontonotestablishcriteriaforjudgingsitesuitabilityhasbeenrepeatedlycriticized.Forexample,JohnBeare,whohadbeencommissionedtoreviewtheCNSC’sproposedlicensingbasisfornewreactors,madethefollowingobservations:

19.TherearetwosignificantgapsintheLicensingBasisDocument.…Thesafetygoalsareindependentofthesite,thesizeoftheexclusionarea(ifany)andthedemographicsoftheareaaroundthesite.Iwasadvisedthatsiteconsiderationsdonotaffectthedesignrequirementsforthenuclearpowerplantbutthatexplanationisdifficulttoaccept.20.BeforeissuingthisLicensingBasisDocumenttheCanadianNuclearSafetyCommissionshoulddocumentandpublishitssitingpolicygivingquantitativevaluesforthetolerablerisk(notunreasonabletousethewordingoftheNuclearSafetyandControlAct)toindividualsandthepopulationaroundanuclearpowerplantsite.OneweaknessofthecurrentsitingpolicyinAECB-1059isthatonlyradiologicalrisksareaddressed.InAECB-1059thefrequencyandradiologicalconsequencesofprocessfailuresaloneandincombinationwithsafetysystemfailuresareaddressedforindividualsandthepopulation,butonlytherisktoindividualsfrommoreseriousaccidents.Theseweaknessesinthecurrentsitingpolicyshouldberemedied.46

Mr.Bearealsomadefrankobservationrelevanttothecurrentproceedings.HetoldCNSCstaff:“Dependingonone’sperspective,fromthesafetypointofviewtheapprovalofthePickeringsitewasanactoffaithorhubris.”GiventhePickeringsitewasoriginallyapprovedinthe1960s,eitherourfaithorhubrishasgrownalongwithgrowthofnearbypopulations.Inaddition,areportcommissionedspecificallytoinformupdatedsitingrequirementsin2007found“[i]mportantgapsnotaddressedintheCNSCdocumentsoranywhereinitslicensingframework…[include]…“criteriafortherejectionofaproposedsiteifitisdeemedunsuitable…[and]…thattherearenoinsurmountableobstaclestotheestablishmentofsuitableemergencymeasures.”47Unfortunately,CNSChasfailedtoacknowledgethecriticismoftheseexpertadvisors.46JohnW.Beare,P.Eng.,ReviewofACR-LBD-001,LicensingBasisDocumentforNewNuclearPowerPlantsinCanada,Draftdated2004December47RegulatorySiteRequirementsNeededforNewNuclearPowerPlantsinCanada,FinalReport,June2007,RSP-0223,pg.8.

Page 25: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

23

Inshort,publicsafetyisbeingunderminedbyfailureofboththeprovincialgovernmentandCNSCstaffrefusaltolimitpopulationgrowtharoundthePickeringnuclearstation.GreenpeacehasattemptedtoalertboththeCNSCandtheprovinceontheneedtoestablishpoliciestoreducetheriskofPickering.Bothhavedeclinedtoact.GreenpeacethusaskstheCommissiontouseitspowerundertheNuclearSafetyandControlActtoregulatetheproductionofnuclearenergyandpreventunreasonablerisktothepublic.Asdiscussed,OPG’sshareholderhasknowinglyincreasedtheriskposedtothepublictounreasonablelevels.Throughitsgrowthpolicies,theOntariogovernmenthasreducedPickering’ssafetymarginsbydiminishingthecapacityofemergencymeasurestoeffectivelyrespondtoaccidentalradiationreleases.ItisreasonabletoassumethattheprovincewillcontinuetopromotepopulationgrowthandunderminePickering’ssafetywithoutsomesortofsanctionbytheCNSC.ThereisprecedentfortheCommissiontomodifylicenceconditionsbasedontheinadequateoversightoftheOntariogovernment.Inresponsetothepublicconcernrelatedtotheprovince’soversightofnuclearemergencyresponse,theCNSCimposednewlicenseconditionsonOntarioreactoroperatorsrequiringthedirectdeliveryofpotassiumiodide(KI)pillswithin10kmofOntarionuclearstations.Notably,theMinistryofCommunitySafetyandCorrectionalServices,whichinappropriatelyreliesonOPGforpolicysupport,opposedtheCommission’snewKIdistributionrequirements.48Theprovince’soppositiontoCNSC’sinterventioninitsjurisdictionhasbeenstubborn.EventhoughtheCNSC’snewKIdistributionrequirementshadbeenimplementedbytheendof2015,theOntario’sgovernment’s2017DiscussionPaperonupdatingemergencyresponserecommendedagainstincludingtheCNSC’sKIdistributioninanupdatedProvincialNuclearEmergencyResponsePlan.Request:InresponsetotheOntariogovernment’spolicies,whichpromotepopulationgrowthandintensificationandtherebyunderminepublicsafetyaroundthePickeringnuclearstation,theCommissionshouldrejectOPG’sapplicationtooperatethePickeringnuclearstationbeyond2020.Request:IntheeventthattheCommissionapprovesthecontinuedoperationofPickeringbeyond2020,theCommissionshouldincludeadditionallicenseconditionsrequiringOPGtoworkwithitsshareholdertoestablishlimitsonpopulationgrowthwithinthenewlyestablished20kmContingencyPlanningZone(CPZ).

48JohnSpears,“Therealquestionaboutnucleardisaster:Federalorprovincialissue?”,TorontoStar,August.23,2014.

Page 26: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

24

2.3Emergencypreparedness–provincialmalpracticeSincethe2011Fukushimadisaster,theOntariogovernmenthasconsistentlymishandledtheoversightandupkeepofprovincialnuclearemergencyresponseplans.Itbecameapparentduringthe2013Pickeringrelicensinghearingsthatprovince’soversightofnuclearemergencypreparednesswasinadequate.Sincethe2013Pickeringhearings,theCommissionhaslaudablyimposedKIdistributionrequirementsinresponsetoprovincialinactionandrequiredannualreportstotheCommissionontheprovince’soversightofnuclearemergencyresponse.However,theprovince’spooroversightofnuclearemergencymanagementhascontinuedandshouldbefactoredintotheCommission’sdecisiononwhethertoaccept,rejectormodifyOPG’srequesttocontinueoperatingthePickeringnuclearstation.InDecember2017,Ontario’sAuditorGeneralreleasedanauditoftheprovince’snuclearemergencyplanning,detailingacorporatecultureattheMinistryofCommunitySafetyandCorrectionalServicesunabletodeliveronitsobligations.49Forexample,theAuditornotedthattheProvincialNuclearEmergencyResponsePlan(PNERP)hadnotbeenupdatedsince2009eventhoughitwassupposedtoberevisedeveryfouryears.ElementsofthePNERP,suchastrafficcontrolplansneededtofacilitateevacuation,wereincomplete.50IthasbecomeapparentthatthereisaclackoftechnicalcapacityattheMinistryofCommunitySafetyandCorrectionalServices.InlinewiththeincestuousrelationshipthatexistsbetweenOPGandtheprovincialgovernmentthereisalsoalackofindependencefromOPGonemergencyplanningmatters.DuringCNSChearingsinNovember2015,DeputyFireMarshalAlSulemanacknowledgedthatthereareonlysixstaffwitharesponsibilityfornuclearemergencyresponsewithintheprovincialgovernment.”51A2016briefingnotetoCNSCpresidentMichaelBinderalsoraisedconcernsrelatedtoOFMEM’slacktechnicalexpertise.Thebriefingobserved“…thechallengeforOFMEMisthelossofexpertiseandcorporateknowledge.”52TheAuditorGeneralalsoobservedthatin2015thegovernmenthadreliedonstaffborrowedfromreactoroperators.TheAuditorrightlyobservedthatthiscouldcompromisethegovernment’sobjectivity.53ThisrelianceonOPGstaffhascontinued.49SeeChapter3.03,AuditorGeneralofOntario,2017AnnualReport,December2017.50Ibid,239.51CNSC,PublicHearingTranscripts,Courtice,Ontario,November4,2015,pg.45.52INFORMATIONNOTETOTHEPRESIDENT,June30,2016E-Doc:5027898,AcquiredthroughAccesstoInformation.53AuditorGeneralofOntario,pg.253.

Page 27: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

25

In2017,JimColes,OPG’sDirectorofEmergencyManagementwas“OnloanfromOPGtosupportdevelopmentofthenewProvincialNuclearEmergencyPlan.”54Notably,internaldocumentsobtainedbyGreenpeacethroughFreedomofInformationlegislationshowthatOPGwasconcernedthatdelaysinthegovernment’sreviewofnuclearemergencyresponsecouldundermineitsrequesttorenewPickering’soperatinglicence.Inaninternaldocumentdetailingriskstoitslicenceapplication,OPGobserved:

ThereisatightschedulefortheProvincetohavetheupdatedPNERPapprovedbyCabinetbytheendof2017,beforetheSpring2018electionandPart1Hearing.Thereisariskthat,ifthePNERPisnotupdatedandapprovedintimebythecurrentCabinet,itwillbesignificantlydelayedbeyondthe2018PNGSlicenceexpirydateandwillraisequestionsabouttherobustnessofoff-siteemergencypreparednessaroundPickering.TheseissuescouldthreatenPickeringrelicensingandresultinholdpointsand/orashorterlicenceterm<10years.55

Tomitigatetheserisks,thedocumentstatesthatOPGwas“…engagedatseniorlevelstoprovideappropriatesupportandconsultation.”56ItisunclearwhethertheseengagementactivitiesincludedMr.Coles’secondmenttotheMinistryofCommunitySafetyandCorrectionalServicestoassistwiththePNERPconsultation.ItisobviousthatOPGhasprivilegedaccesstogovernmentofficialsoverseeingthereviewofprovincialnuclearemergencyresponseplans.AccordingtodocumentsobtainedthroughFreedomofInformation,OPGhadreceivedaninvitationinearlyJuly2017topresenttothePNERPadvisorycommitteethethirdweekofAugust.57Incontrast,thegovernmentonlyinformedGreenpeaceoneworkingdaybeforewewereexpectedtopresent.InGreenpeace’sview,thisiseitherevidencebiasorincompetence.Afteryearsofdelay,itappearsthatOPG’sapplicationtocontinueoperatingthePickeringnuclearstationexpeditedtheprovincialgovernment’sreviewofnuclearemergencyresponse.OPG’soperationsappeartohaveahigherprioritywithintheprovincialthanpublicsafety.Nevertheless,althoughCabinetapprovedarevisedPNERPonDecember13th2017,thegovernmentfailedtoreleaseanupdatedImplementingPlanforthePickeringnuclearstationintimefortheseproceedings.ThisisanotherexampleoftheOntariogovernment’sinabilitytocompetentlyoverseeoffsitenuclearemergencyresponse.54SeeJimColesLinkedinPage.See:https://www.linkedin.com/in/jim-coles-97a35442LastaccessedMay7,2018.55OPG,RiskRegistry–PickeringRelicensing2018,May31,2017,FOI#17-048,pg.393.56Ibid.57ScottPreston(OPG–Manager,EmergencyProjects)“VPRelicensingMeeting”,email,July12,2017.FOI#17-048.

Page 28: Oral Presentation Exposé oral Mémoire de Greenpeace · Greenpeace provided a submission to Commission prior to the first day of hearings considering OPG’s application request

26

UponreviewoftheupdatedtheupdatedPickeringImplementingPlan,Greenpeacewillprovideadditionalcommentsontheadequacyofoffsitenuclearemergencyresponse.Thatsaid,OPG’sshareholderhasaconsistenttrackrecordofmishandlingitsresponsibilityforoffsitenuclearemergencyresponse.ThisshouldbereflectedintheCommission’sdeliberationsanddecision.Request:Inlightoftheprovince’sconsistentmishandlingofnuclearemergencyresponseplanning,theCommissionshouldrejectOPG’sapplicationtooperatethePickeringnuclearstationbeyond2020.3.Disclaimer

ThissubmissionisnotanendorsementoftheCNSC’shearingprocess,credibilityorindependence.Tothecontrary,Greenpeacefeelstherecentlyelectedfederalgovernmentneedstore-establishtheindependenceoftheCNSCthroughalegislativereviewandbyappointinganewCNSCpresident.InGreenpeace’sview,theformerHarpergovernmentunderminedtheindependenceoftheCNSCwhenitfiredtheCNSCpresidentLindaKeenin2008.GreenpeacehasattemptedtoconstructivelyparticipateinCNSClicensinghearings,buthasfoundthatCNSChearingsareoften“staged”byCNSCmanagementtokeepinconvenientinformationofftherecord.Notably,publicparticipationinCNSCproceedingsincreasedfollowingthe2011Fukushimadisaster.ThisincreasedparticipationarguablyleadtoanincreaseinCommissiondecisionscontrarytotherecommendationsofCNSCstaffandlicencees.Examplesinclude,amongothers,strengthenedpotassiumiodide(KI)distributionrequirements,directiontolicenseestodevelopaprocessforsite-wideriskassessmentandtheissuanceofthe2014“severeaccidentstudy”.Inspiteofthisevidencethatincreasedpubicparticipationmayleadtobetterregulatorydecision-making,theCNSChasoptedtoreducepublicparticipationandtransparencybyshiftingtoten-yearlicences.InGreenpeace’sview,thisisevidencethattheCommission’smindset–theunspokenassumptionsthatinformactions-stillviewspublicinputandscrutinyasanuisanceinsteadofavaluablealternateperspectiveandcheckontheiractivities.UntilsuchatimethattherehavebeenchangesinCNSCseniormanagementandtotheCNSC’srulesofproceduretoallowforcross-examinationandtestingofevidence,Greenpeacedoesn’tbelieveCNSChearingscanbereliedupontoprovidetrustworthyassessmentsofnuclearrisksinCanada.