109
0 2020 Michael Edwards Ada County 3/13/2020 Oregon Trail Recreation Area Master Plan

Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

0

2020

Michael Edwards

Ada County

3/13/2020

Oregon Trail Recreation Area

Master Plan

Page 2: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

1

Page 3: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Contents

Tab 1 Oregon Trail Master Plan Summary ............................................................................................ 1

Master Plan, Conditional use and Modification to the Ada County Oregon Trail Recreation Area

cover letter .................................................................................................................................................. 1

Master Site Plan Checklist (ACC 8-5A) .................................................................................................... 1

Conditional Use Checklist (ACC 8-5B) ..................................................................................................... 1

Tab 2 Site Plan and Specifics Documentation ....................................................................................... 2

Tab 2 Specific Documents ......................................................................................................................... 2

Tab 2a Quitclaim Deed .............................................................................................................................. 2

Tab 2b Survey of Deeded Property .......................................................................................................... 2

Tab 2c BOCC Minutes Approving Grant for Parking Lot and Kiosk Construction. ........................... 2

Tab 2d CSHQA Oregon Trail Entrance Road and Parking Lot Site Plans. ......................................... 2

Tab 2e Oregon Trail Lighting Schematic ............................................................................................... 2

Tab 2f CSHQA Oregon Trail Park Layout in Color ................................................................................. 2

Tab 2g CSHQA Amphitheater Rock Layout Schematic ......................................................................... 2

Tab 2h CSHQA Rendering of Amphitheater Rock Layout West Side ................................................... 2

Tab 2i CSHQA Rendering of Amphitheater Rock Layout West Side .................................................... 2

Tab 2j CSHQA Projected Scope of Services.............................................................................................. 2

Tab 2k Pre-construction Meeting Notes ................................................................................................. 2

Tab 2l CSHQA Structural Design Calculations for Oregon Trail Project ........................................... 2

Tab 2m Ada County Development Services Building Permit #1000222 ........................................... 2

Tab 2n Site Plan Showing the Location of Layback Kiosks .................................................................. 2

Tab 20 Sit Plan Showing Future Location of Vault Toilet .................................................................... 2

Tab 2p CXT Vault Toilet Specifications. .................................................................................................. 2

Tab 3 Natural Features Analysis ............................................................................................................. 3

Tab 3a U.S Fish and Wildlife Service, National Wetlands Inventory .................................................. 3

Page 4: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Oregon Trail Master Plan Supporting

Documentation Tab 1 Oregon Trail Master Plan Summary

Master Plan, Conditional use and Modification to the Ada County Oregon Trail Recreation

Area cover letter

Master Site Plan Checklist (ACC 8-5A)

Conditional Use Checklist (ACC 8-5B)

Page 5: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

June 29, 2020 Ada County Development Services 200 W. Front Street Boise, Idaho 83702 Re: Master Plan, Conditional Use, and Modification to the Ada County Oregon Trail Recreation Area. To whom it may concern, In 2002 Ada County was awarded a $300,000 grant from Idaho Transportation Department to purchase land and easements to protect remnants of Oregon Trail between Highway 21 and Bonneville Point. After successfully obtaining and protecting several sections of Oregon Trail, Ada County was granted $348,000 from Idaho Department of Parks and Recreation and $80,000 from Simplot to construct a paved parking lot and informational kiosks at the current location of the Oregon Trail Recreation area off Highway 21. This Master Plan and Conditional Use application is documentation of the work that has previously been performed under other agreements and includes the addition of a pit vault toilet that was included in previous planning efforts. The Ada County Oregon Trail Recreation area encompasses 24.94 acres of Ada County land, off Highway 21, 14 acres of Ada County property off East Columbia Road and S. Wagons View Ave, 350 acres of BLM land, and trail license agreement on Simplot Corporation for a total of 5 miles of non-motorized trail. The planning effort to develop the recreation area began in earnest in 2008. Although all the necessary steps to complete the masterplan were undertaken, a formal submittal for the master planning process wasn’t completed. In July of 2008, the State of Idaho Department of Transportation provide a quick claim deed to Ada County for the 24.94 areas where the entrance road, parking lot and main Oregon Trail Recreation Area kiosks now exist. The quitclaim deed and survey information can be found in appendix 2. The Oregon Trail Recreation Area parking lot and kiosk was approved in March of 2010 (building permit #1000222 Oregon Trail Trailhead) and is included in Appendix 2. The Ada County Board of Commissioners approved the Oregon Trail Kiosk Grant Application (Grant No. 0907-A) as recorded in the January 27, 2009 BOCC minutes. The Recreation area is open during day light hours and is gated at sunset with a gate on the inbound lane and a one way traffic spikes for the parks outbound lane. A recent survey shows the park is used by hikers, runners, bikers, dog walkers, equestrians and those interested in Oregon Trail history. It’s estimated that 30 to 100 people visit the area each day.

ADA COUNTY

PARKS AND WATERWAYS BARBER PARK EDUCATION

EVENT CENTER

4049 Eckert Road Boise, Idaho 83716-8814

Phone (208) 577-4575 Fax (208) 577-4579

Page 6: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

The master plan most of which has already been completed included:

• A parking lot with 32 spaces for general vehicles, 12 pull through spaces for buses and truck and trailer, and 4 handicapped van accessible spots;

• An information kiosk area in the shape of prairie schooner/pioneer wagon;

• Columnar rock columns as a back drop;

• Six large information panels on early day Oregon Trail travelers and local history;

• Two large kiosks for trail maps and recreation area rules;

• Two smaller kiosks just off the parking lot with maps showing the Oregon Trail route from Boise to Glens Ferry with some of the historic locations along the way.

• 5-miles of non-motorized trail;

• 2’ post on the east side of the road to prevent motorized vehicles from entering the recreation area;

• Split rail fencing with rock columns surrounding the parking lot and entrance way;

• A 180 square foot ADA pit toilet;

Ada County Parks & Waterways is requesting approval of the Master Plan and Conditional Use permit to continue to carry out the items listed in the original planning done for the Oregon Trail Recreation area. This includes continuing the development of trails, replacement/updating kiosk information, adding additional kiosks along old sections of Oregon Trail at the Ada County property off Columbia Road and Wagons View, and installation of an ADA pit toilet identified in the plan. Sincerely, Mike Edwards Ada County Parks & Waterways Opens Space & Trails Coordinator

Page 7: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

ADA COUNTY DEVELOPMENT SERVICES- Mailing: 200 W. Front Street, Boise, ID 83702 Website: adacounty.id.gov Phone: 208-287-7900 Fax: 208-287-7909 Page 1 of 2 VERSION: NOVEMBER 2018

MASTER SITE PLAN CHECKLIST (ACC 8-4E) A Master Site Plan Request is a staff level application, as long as it is not associated with a conditional use. GENERAL INFORMATION: Applicant: DESCRIPTION Staff:

MASTER APPLICATION FORM

DETAILED LETTER by the applicant fully describing the request or project & addressing the following:

Proposed Use(s)

Is the project associated with a Conditional Use: YES NO

Total square feet of all proposed structures

Is this a modification and/or expansion of an approved master site plan: YES NO Original MSP File#

Hours & Days of Operation:

Number of Required Parking Spaces (include ADA parking stalls)

Number of employees (during largest shift) & Total number of employees

Maximum number of patrons/clients expected (daily average)

Outdoor Speaker System: YES NO (If yes, identify location & proposed hours)

Proposed Sewer or Septic System

Proposed Water System or Well

Type of Irrigation: Pressurized Gravity None Other (Explain)

Explain if utilities are underground, or if screening is provided

Phased Project: YES NO (Explain phases of parking & landscaping)

SITE PLAN: Full-sized, scaled plot plan, showing all existing and proposed easements, property lines, structures, septic and well locations, and existing and proposed driveways drawn to scale, including one copy reduced to 8 ½” x 11” to include the following:

Structure(s) locations on subject property

Outdoor Speaker System. Identify the location(s) and size of proposed speakers

Pedestrian access and circulation

Building Elevations

Drive-Up Window: YES NO (If yes, identify location & stacking lane)

Well location(s)

Septic System & Drain field location(s)

Hydrant location, fire department access, fire flow resources, etc.

Pressurized Irrigation (if required)

Automobile access and circulation

OFF STREET PARKING & LOADING FACILITIES PLAN (ACC 8-4G) Can be included on the site plan

Identify all off-street parking and loading spaces

Identify the proposed drive aisle width:

Parking within 300-feet of the entrance: YES NO

Joint Parking Agreement: YES (submit copy of agreement) NO

Identify width, angle, and depth of parking spaces

Address Bicycle Parking/Bicycle Racks

List the number of required spaces for cars/vehicles, loading spaces and bicycles:

List the number & dimensions of off-street loading spaces:

Detailed description of proposed paving materials:

NATURAL FEATURES ANALYSIS (ACC 8-4E-4D)

Hydrology (Visit www.fws.gov/wetlands/data/mapper.html)

Soils (Visit www.nrcs.usda.gov)

Page 8: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

ADA COUNTY DEVELOPMENT SERVICES- Mailing: 200 W. Front Street, Boise, ID 83702 Website: adacounty.id.gov Phone: 208-287-7900 Fax: 208-287-7909 Page 2 of 2 VERSION: NOVEMBER 2018

Topography

Vegetation

Sensitive Plant & Wildlife Species (Provide Letter from Idaho Dept. of Fish & Game)

Historic Resources

Hazardous Areas

Impact on Natural Features

LANDSCAPING (ACC 8-4F): - can be a condition of approval (NOTE: If landscape plan is submitted after approval, as a condition of approval, additional application and review fees will apply.)

One (1) Full-sized, scaled landscape plan, and one (1) 8 ½”x 11” landscape plan to include the following:

Drawn by a landscape professional (required within a City’s Area of Impact)

Location, size, type of proposed landscaping (shown at 75% maturity)

Proposed size at planting (i.e., caliper, gallon, etc.)

Existing vegetation to remain: YES NO

Fences over 100-feet in length: YES NO

Flood Hazard Overlay: YES NO

Sound Walls Proposed: YES NO

Perimeter Landscaping & Screening

Required landscape points:

Minimum width of landscape areas:

Parking Area Landscaping & Screening

Percentage (%) of parking area shading required:

Screening: YES NO

Pedestrian access required: YES NO

LIGHTING PLAN (ACC 8-4H): - can be a condition of approval (NOTE: If lighting plan is submitted after approval as a condition of approval, additional applications and review fees will apply.)

Location, orientation, and height of all proposed exterior lighting (attached & detached)

Detail the type of lighting (include cut sheets of all lighting fixtures)

Setbacks of the proposed lights:

Illumination of lighting:

Watts:

Lumens output:

Luminous area:

Photometric test report

Maximum Height:

Floodlights: YES NO

Shielding: YES NO Identify extent of shielding including cut off angles

SIGN PLAN (ACC 8-4I): - can be a condition of approval (NOTE: If signage plan is submitted after approval as a condition of approval, additional applications and review fees will apply.)

APPLICATION FEE: $350 (base fee) + .12/square foot (for all proposed structures) NOTE: Building, Engineering, and Surveying applications and fees may be required and are separate from Planning & Zoning Applications and Fees.

Supplementary information at the discretion of the Director or County Engineer may be required to sufficiently detail the proposed development within any special development area, including but not limited to hillside, planned unit development, floodplain, southwest, WUFI, Boise River Greenway, airport influence, and/or hazardous or unique areas of development.

Application will not be accepted unless all applicable items on the form are submitted. This application shall not be considered complete until staff has received all required information.

Page 9: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Tab 2 Site Plan and Specifics Documentation

Tab 2 Specific Documents

Tab 2a Quitclaim Deed

State of Idaho Department of Transportation deed of Oregon Trail Recreation Area (Parking Lot and

Kiosk Area) to Ada County.

Tab 2b Survey of Deeded Property

This includes JUB engineering survey plans.

Tab 2c BOCC Minutes Approving Grant for Parking Lot and Kiosk Construction.

This includes the January 27, 2009 BOOC minutes approving the Oregon Trail Recreation Area grant

applications to construct the parking lot and kiosk – see item IV.10.

Tab 2d CSHQA Oregon Trail Entrance Road and Parking Lot Site Plans.

Tab 2e Oregon Trail Lighting Schematic

Tab 2f CSHQA Oregon Trail Park Layout in Color

Tab 2g CSHQA Amphitheater Rock Layout Schematic

Tab 2h CSHQA Rendering of Amphitheater Rock Layout West Side

Tab 2i CSHQA Rendering of Amphitheater Rock Layout West Side

Tab 2j CSHQA Projected Scope of Services

Tab 2k Pre-construction Meeting Notes

Tab 2l CSHQA Structural Design Calculations for Oregon Trail Project

Tab 2m Ada County Development Services Building Permit #1000222

Tab 2n Site Plan Showing the Location of Layback Kiosks

Tab 20 Sit Plan Showing Future Location of Vault Toilet

Tab 2p CXT Vault Toilet Specifications.

Page 10: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 11: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 12: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 13: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 14: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 15: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 16: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Minute B o o k - -_., Commissioners, Ada County, Idaho

OPEN JANUARY 27,2009 Session, A.D. -

BOARD OF ADA COUNTY COMMlSSIONERS MINUTES OF THE OPEN BUSINESS MEETING

TUESDAY, JANUARY 27,2009 9:00 A.M.

The Board of Ada County Commissioners (Board) met this date in an Open Meeting in the Commissioners' Conference Room of the Ada County Courthouse Complex to act on the following items. Staff members present: Dave Navarro, ClerWAuditorlRecorder's Office; Tim Tallman, Assessor's Office; Bob Kobza, Purchasing; Dave Neal, Solid Waste Management; Dave Logan and Bruce Krisko, Operations; John Caywood, Recreation & Event Services; Sherry Morgan, Prosecuting Attorney's Office; and Roxanna Dempsay, Indigent Services. Minutes

Recorder: Pam Woodies.

I. IN THE MATTER OF CALL TO ORDER:

Commissioner Fred Tilman called the meeting of the Ada County Commissioners to order at 9:04 a.m.

11. IN THE MATTER OF ROLL CALL: Commissioners Fred Tilman, Rick Yzaguirre and Sharon M. Ullman were present.

m. CHANGES TO THE AGENDA: There were no changes to the agenda.

IV. NEW BUSINESS 1 . Purchasing (1)

- Opening of RFP 09-1, Ada County Landfill North Ravine Cell, Stage I1

B. Kobza stated that three Requests for Proposals (RFPs) were received and asked that the name of the companies be read into the record.

F. Tilman stated that an RFP was received from Hap Taylor and Sons Inc. d/b/a Knife River, DelHur Industries and Western Construction Inc.

B. Kobza asked that the award in this matter be tabled until February 10,2009, to allow the Evaluation Committee to evaluate the RFPs.

ACTION: R YZAGUIRRE MOVED TO TABLE RFP 09-1, ADA COUNTY LANDFILL NORTH RAVINE CELL, STAGE I1 UNTIL FEBRUARY 10, 2009. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI-

MOUSLY.

S. Ullman asked if copies of the RFPs could be provided to the members of the public who are present. F. Tilman responded negatively and said the documents could not be provided to the public until they were evaluated.

2. Operations (2) (Authorize the Chairman to Sign)

a. Change Order No. 1, Benjamin Campus Phase I1 (increase $64,642.35)

D. Logan stated that this Change Order was for extra work that was added to the project. The first portion is for an inert fire suppression system in the computer room. They are also adding extra insulation that they found was missing inside the exterior northwest wall. Additionally, they are adding a display system for the driver's license area and repairing a back-flow preventer that was found to be defective upon inspection.

F. Tilman asked if the $64,652.35 was within the contingent amount of the bid. D. Logan answered affirmatively. F. Ti1ma.n inquired if there were any other Change Orders on this project. D. Logan replied there had not been.

S. Ullman wondered if the back-flow preventer was under warranty if it was defective and brand new. D. Logan clarified that it was an old existing one that appeared hnctional but when it was inspected, it was found to be defective.

Page 17: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Minute Book- - --., Commissioners, Ada County, Idaho OPEN JANUARY 27,2009

Session, A.D. -

- -. -

I

b. Change Order No. 3, Benjamin Campus Phase I (increase $36,227.34)

I

D. Logan stated that this was the last Change Order for this project and the project was being closed out. It includes data and power for systems furniture that was added to the project. They also installed recessed mailboxes and

exterior signage to the building with electric run to it. As well, emergency power for lights was added. They completely changed the way they planned to wire exit lights. They wanted to wire the lights so they could be tested every once in a while without shutting the whole building down. They found out they could not do that, so they changed the wiring. This Change Order of $36,227.34 is within budget. He anticipated closing the project out by the end of the month.

S. Ullman inquired if the insulation was already in place. D. Logan answered that it was within the walls and had a big one-foot false wall along the section. Once they tore into it, they found out the first eight feet had insulation but the rest had none.

ACTION: R YZAGUIRRE MOVED TO APPROVE CHANGE ORDER NO. 1, BENJAMIN CAMPUS PHASE I1 (INCREASE $64,642.35) AND CHANGE ORDER NO. 3, BENJAMIN CAMPUS PHASE I (INCREASE $36,227.34); AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. S. ILLMAN SECONDED. R. YZAGUlRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

3. Licenses (Authorize the Chairman to Sign) a. Catering Permits (1)

- End Zone at Barber Park Events Center for TroutICraven Wedding, February 7th from 3:30pm to 10pm.

b. New Licenses (2) 1. Buffalo Wild Wings, 3323 E. Louise Dr. #103, Meridian, BeerILiquor 2. Thai House Express, 6580 S. Federal Way, Boise,. BeerIWine

D. Navarro thanked the Board for having one vendor at Barber Park and said End Zone was very helpful. He also appreciated the Board's assistance expediting Buffalo Wild Wings, which will be on the city of Meridian's agenda tonight. He stated that the required fees were paid and the above- listed items are properly before the Board.

ACTION: S. ULLMAN MOVED TO APPROVE ONE CATERING PERMIT AND TWO NEW LICENSES AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

4. Auditor's Office

D. Navarro asked if F. Tilman wished to sign the Balance Sheet for the fiscal year ending 2008. He remarked that since the Chairman signs all Legal Notices that are published over his name, he might prefer to sign the Balance Sheet before it is published. F. Tilman agreed and signed.

5. Claims Journal (1) - January 22,2009

ACTION: S. ULLMAN MOVED TO AUTHORIZE PAYMENT OF CLAIMS AGAINST THE COUNTY AS LISTED ON THE CLAIMS JOURNAL DATED JANUARY 22, 2009. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TlLMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

I

M ; w ~ , I ~ P RML Crrrnrnirrinnern- Ada Countv, Idaho

Page 18: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Minute Book-.-- -? Commissioners, Ada County, Idaho OPEN JANUARY 27,2009

Session, 4.D. -

6. Personnel Action Forms (1 Elected Official Appointment; 16 Salary Increases) I ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE ELECTED

OFFICIAL APPOINTMENT AND 16 SALARY INCREASES AS IDENTIFIED ON THE SLTMMARY OF THE PERSONNEL ACTION FORMS; AND THAT THE SUMMARY SHEET REMAIN ON FILE IN THE COMMISSIONERS' OFFICE. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI- MOUSLY.

b. 2008 Primary (6) 1. R09 190002 13 Kieffer Judi L 2. PlNORINDMOl Nonvest Industrial Mat Ltd Co 3. P l SIDESPOOl Sidelines Sport Bar 4. MKITC082701 Peregrine Fund The 5. P 1 ACTMORTO 1 Activa Mortgage 6. MBROA741401 Pulley Jerry

~

ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE TAX CANCELLATION FOR 2007 AND SIX FOR 2008 AS LISTED ON THE AGENDA; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCLMENTS ON BEHALF OF THE BOARD. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

7. Tax Cancellations (1 - 2007; 6 - 2008) (Authorize the Chairman to Sign)

a. 2007 Primary (1) - MBROA761409 McCurdy Charles

8. Recreation and Event Services (Authorize the Chairman to Sign) - Barber Park Education & Event Center (Interim Events) (2)

1. Dana Carpenter, Wedding and Reception, March 14,2009 2. Kathy Chambers, Wedding and Reception, September 27,2009

ACTION: S. LTLLMAN MOVED TO APPROVE TWO BARBER PARK EDUCATION & EVENT CENTER INTERIM EVENTS AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

9. Volunteer Board Appointments (1) - Appointment of Jake Centers to the Ada County Waterways Advisory Committee

for a three-year term expiring 1/27/2012

ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE VOLUNTEER BOARD APPOINTMENT AS READ INTO THE RECORD. R. YZAGUlRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.

10. Grants (1) (Authorize the Chairman to Sign) - Grant No. 0907-A - Oregon Trailhead and Interpretive Kiosk Grant Application

to Idaho Department of Parks and Recreation ($1 19,458 with Match of $80,542 from Donation) (10/1/09-6/1/10)

J. Caywood stated that this was a grant application for the trailhead on Highway 21 where the County received the land for free from the Idaho Transportation Department and it is heavily used. They want a nice facility and this grant money enables it to be paid for with other people's money.

Page 19: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Minute B o o k - --, Commissioners, Ada County, Idaho OPEN JANUARY 27,2009

Session, 4.D. - . . _ - - _ - _ _ -

7 -

S. Ullman asked who donated the $80,542. J. Caywood responded that it came from Simplot's cultural mitigation when they put a subdivision in along the Oregon Trail. This is a partnership that goes back with Idaho Power, Simplot, Bureau of Land Management and several other entities. The County ended up with mitigation money and plans to put in an Oregon Trail interpretation kiosk with the money as well as some of the infrastructure. The trailhead portion would be from the grant monies.

ACTION: S. LILLMAN MOVED TO APPROVE ONE GRANT APPLICATION AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCLMENT ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED LNANIMOUSLY.

Agreements (2) (Authorize the Chairman to Sign the Appropriate Documents) a. Agreement - No. 7311-1-09 - First Amendment to Agreement Between Ada

County Solid Waste Management and G2 Energy Hidden Hollow, LLC (G2 Energy) Regarding Landfill Gas, Recognizing That a Subsidiary of Fortistar, LLC Acquired Majority Interest in G2 Energy and That G2 Energy Changed Its Name to Hidden Hollow Energy, LLC, and Is Now Domiciled in Delaware

b. Agreement No. 8479 - Agreement Between Ada County Expo Idaho and Romeo Entertainment Group, Inc. for Comprehensive Grandstand Entertainment Services for 2009 Western Idaho Fair (10/1/08-9/30/09)

ACTION: R. YZAGLJIRRE MOVED TO APPROVE TWO AGREEMENTS AS LISTED ON THE AGENDA; AND AUTHORIZE THE CHAIRMAN TO SIGN THE APPROPRIATE DOCUMENTS. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI- MOUSLY.

V. INDIGENT SERVICES: 1. Weekly Indigent Items (Authorize the Chairman to Sign)

(8 Approvals; 26 Denials; 37 Liens; 36 Form N1 (UCC) Liens; 8 Release of Liens; and 8 Release of Form N1 (UCC) Liens)

R. Dempsay presented the Staff report. Ada County Indigent Services submitted a request for 6 approvals and 19 denials on Medical Case Nos. 0901-076 through 0901- 100; and 2 approvals and 7 denials on General Assistance Case Nos. 0901-335 through 0901-343. Indigent Services also requested approval for the recording of 37 Liens, 36 Form N1 (UCC) Liens, 8 Release of Liens and 8 Release of Form N1 (UCC) Liens.

ACTION: R. YZAGUIRRE MOVED TO APPROVE THE RECOM- MENDATIONS OF M A COUNTY INDIGENT SERVICES LISTED IN THE SUMMARY OF CASES DATED JANUARY 27, 2009, FOR 6 APPROVALS AND 19 DENIALS ON MEDICAL CASE NOS. 0901-076 THROUGH 0901-100; AND 2 APPROVALS AND 7 DENIALS ON GENERAL ASSISTANCE CASE NOS. 0901- 335 THROUGH 0901-343; APPROVE THE RECORDING OF 37 LIENS, 36 FORM N1 (UCC) LIENS, 8 RELEASE OF LIENS AND 8 RELEASE OF FORM N1 (UCC) LIENS; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. LILLMAN, AYE, AND F. TILMAN, AYE. THE MOTION C A W E D UNANIMOUSLY.

Page 20: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Minute Book- ---., Commissioners, Ada County, Idaho

OPEN JANUARY 27,2009 Session, A.D. -

VI. IN THE MATTER OF RECESS: There being no further business to come before the Board at this time, the meeting was recessed at 9:20 a.m.

ATTEST:

Navarro, Ada County Clerk

Page 21: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 22: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 23: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 24: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 25: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 26: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 27: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 28: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 29: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 30: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 31: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 32: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 33: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 34: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 35: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 36: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 37: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 38: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 39: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 40: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 41: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 42: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 43: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 44: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 45: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 46: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 47: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 48: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 49: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 50: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 51: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 52: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 53: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 54: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 55: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

1

2

3

4

5

6

7

9

10

11

12

1 – Large Map kiosk and layback map shown in slide 2”

2 – “Main Oregon Trail Back Country Byway”

3 – “Boise River Valley”

4 – “Watchable Wildlife”

5 – “Natural Rim Opening”

6 – “Oregon Trail” obelisk

7 – “Habitat is Home”

8 – “Danger Abrupt Edge Severe Erosion Area”

9– USBR corner section survey pin 2012

10– Barbed wire fence (possible removal)

11 – DOI USBR corner section survey pin

Page 56: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Proposed vault toilet

location

Page 57: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 58: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 59: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 60: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 61: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 62: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 63: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 64: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 65: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 66: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 67: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 68: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 69: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 70: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 71: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 72: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 73: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Tab 3 Natural Features Analysis

Tab 3a U.S Fish and Wildlife Service, National Wetlands Inventory

Tab 3a Oregon Trail Hydrology and Wetlands

The U.S Fish and Wildlife Service data map shows there are no wetlands or waterways within the

Oregon Trail Recreation Area.

Tab 3b National Soil Conservation Service Soil Survey Maps

The soil survey provides data maps that inform users on soil conditions and how the related to

numerous activities. Since the Oregon Trail Recreation Area is primarily focused on recreation, habitat

and history. The NRCS interactive soil survey was used to look at soil rutting potential, suitability for

trails, erosion hazards, corrosive characteristics on cement (the effects on building materials). Most of

the site consists of either 38 – Chilcott-Sebree Complex, Bedrock Substratum, 2 to 4 percent slopes or 71

– Jenness fine Sandy Loam, 0 to 2 percent slopes. A small portion of the site is rock outcrop represted by

158 Rock Outcrop – Trevino Complex, 5 to 20 percent slopes.

Soil Rutting Hazard

The data revealed that 56% of the area within the Recreation Area has sever rutable soils types. These

soils include Chilcott silt loam and Chilcot-Sebree soils. These soils are known to rut with as little as 2 to

4% slopes. Any new trail development will need to incorporate numerous grade reversals and other

structures to keep water from running down the trail.

Soil Suitability for Trails.

Soil suitability is based on the soil properties that affect trafficability and erodibility. These include

stoniness, depth to water table, ponding, flooding, slope and texture of the surface layer. The data

reveals that 72% of the trails are somewhat limited to trail development and sustainability because the

Chilcott soil types break down and are dusty.

Erosion Hazards

This rating is based on the hazard of soil loss from trail-based activity based on slope, soil erosion factor

and an index of rainfall erosivity. Since the area is mostly flat with little rain fall, 73% of the area is only

slightly erodible. This rating indicates that erosion is unlikely under ordinary climate conditions.

However, there are some a couple of old roads and trails that are very steep which increases the

erodibility in these spots.

Erosion of Concrete

The soil data for concrete erosion looks at the potential of soil types to chemically or electrochemically

corrode or weaken concrete. The soil types in the Recreation Area are shown to have a low impact on

concrete building materials.

Tab 3c Topography

Page 74: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

Topography maps have been provided for three separate regions of the Oregon Trail Recreation Area.

They are labeled East, Central and West. The area of the site where the vault toilet, parking lot trailhead,

and kiosks is located is generally flat with slopes less than 15%. The property generally drains in a

northwesterly direction. There are some portions of the site where the slopes exceed 15%.

Tab 3d-f Sensitive Plant, Wildlife and Natural Resources

The Idaho Department of Fish & Game does not have records of any special-status animals or plants

occurring within the proposed project. They do not anticipate the projects to have an adverse effect on

native plant or terrestrial wildlife populations.

Historic Resources

The Ada County Historic Sites Inventory shows the site is in the proximity to the Oregon Trail with wagon

ruts crossing through several areas. Trail ruts are visible in the recreation area and there are markers

highlighting the Oregon and Kelton trails through the area.

Hazardous Areas

Not Applicable.

Impact on Natural Features

The impact onto natural features will be minimal with majority of the recreation area is in the natural

state.

Page 75: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 76: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 77: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 78: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 79: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 80: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 81: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 82: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 83: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 84: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 85: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 86: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 87: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 88: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 89: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 90: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 91: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 92: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 93: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 94: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 95: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 96: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 97: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 98: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 99: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 100: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 101: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

July 27, 2007 Travis Pitkin Compliance Archaeologist Idaho State Historical Society State Historic Preservation Office Statehouse Mail RE: SH-21: I-84 Diversion Dam, Stage 2 Project # STP-F-3291(28), Key # 2623 Travis, As you are aware, the Idaho Transportation Department constructed a bridge near Diversion Dam during the 1990s. As part of that project, ITD agreed to help develop an Oregon Trail Interpretive Site area located between the new bridge and I-84. Numerous correspondences between ITD and your office occurred, regarding both the construction of the new bridge and associated extension of SH-21, and the planning phase of this proposed interpretive site. Although the bridge and highway portions of the project were constructed, until now the Oregon Trail Interpretive Site area has never been developed. The MOA, entered into by numerous signatories, stipulated that ITD shall: Supervise Columbia Village Joint Venture (CVJV) in the planning and construction of an informational kiosk to be located near the parking lot that is planned and will be built on the south side of Highway 21, in Parcel G.

Recently, Ada County Parks and Waterways requested a land transfer from ITD so this Oregon Trail Interpretive Site can be constructed by them. ITD would like to approve this land transfer. After reviewing the project file documentation, it appears that the area proposed for the land exchange was surveyed during previous investigations. No historic properties were identified in the location of the proposed Oregon Trail Interpretive Site. The transfer of property for the development of the Oregon Trail Interpretive Site will proceed with Ada County Parks and Waterways assuming the following stipulations:

• SHPO is able to review, comment, and approve the nature of the interpretive site exhibits including the kiosks.

• SHPO will help develop the information contained in the interpretive site exhibits including the kiosks.

• Ada County will be responsible for the construction of the Oregon Trail Interpretive Site. There will be NO EFFECT to historic properties as a result of these project actions.

Page 102: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

If you have any questions, please feel free to contact me at [email protected] or 334-8449. Thank you, Marc Münch State Highway Archaeologist Enclosure

Page 103: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 104: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 105: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 106: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020

1

Tab 4 Public Input

Tab 4 Public Letters of Support

Tab4a Surprise Valley Letter of Support of Proposed Improvements

Tab 4b Boise Parks & Recreation/Ridge to Rivers Letter of Support

Tab 4c Boise Young Rider Development Squad (BYRDS) Letter of Support

Page 107: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 108: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020
Page 109: Oregon Trail Recreation Area Master Plan...2020/07/02  · Area cover letter Master Site Plan Checklist (ACC 8-5A) Conditional Use Checklist (ACC 8-5B) 4049 Eckert Road June 29, 2020