2020
Michael Edwards
Ada County
3/13/2020
Oregon Trail Recreation Area
Master Plan
1
Contents
Tab 1 Oregon Trail Master Plan Summary ............................................................................................ 1
Master Plan, Conditional use and Modification to the Ada County Oregon Trail Recreation Area
cover letter .................................................................................................................................................. 1
Master Site Plan Checklist (ACC 8-5A) .................................................................................................... 1
Conditional Use Checklist (ACC 8-5B) ..................................................................................................... 1
Tab 2 Site Plan and Specifics Documentation ....................................................................................... 2
Tab 2 Specific Documents ......................................................................................................................... 2
Tab 2a Quitclaim Deed .............................................................................................................................. 2
Tab 2b Survey of Deeded Property .......................................................................................................... 2
Tab 2c BOCC Minutes Approving Grant for Parking Lot and Kiosk Construction. ........................... 2
Tab 2d CSHQA Oregon Trail Entrance Road and Parking Lot Site Plans. ......................................... 2
Tab 2e Oregon Trail Lighting Schematic ............................................................................................... 2
Tab 2f CSHQA Oregon Trail Park Layout in Color ................................................................................. 2
Tab 2g CSHQA Amphitheater Rock Layout Schematic ......................................................................... 2
Tab 2h CSHQA Rendering of Amphitheater Rock Layout West Side ................................................... 2
Tab 2i CSHQA Rendering of Amphitheater Rock Layout West Side .................................................... 2
Tab 2j CSHQA Projected Scope of Services.............................................................................................. 2
Tab 2k Pre-construction Meeting Notes ................................................................................................. 2
Tab 2l CSHQA Structural Design Calculations for Oregon Trail Project ........................................... 2
Tab 2m Ada County Development Services Building Permit #1000222 ........................................... 2
Tab 2n Site Plan Showing the Location of Layback Kiosks .................................................................. 2
Tab 20 Sit Plan Showing Future Location of Vault Toilet .................................................................... 2
Tab 2p CXT Vault Toilet Specifications. .................................................................................................. 2
Tab 3 Natural Features Analysis ............................................................................................................. 3
Tab 3a U.S Fish and Wildlife Service, National Wetlands Inventory .................................................. 3
Oregon Trail Master Plan Supporting
Documentation Tab 1 Oregon Trail Master Plan Summary
Master Plan, Conditional use and Modification to the Ada County Oregon Trail Recreation
Area cover letter
Master Site Plan Checklist (ACC 8-5A)
Conditional Use Checklist (ACC 8-5B)
June 29, 2020 Ada County Development Services 200 W. Front Street Boise, Idaho 83702 Re: Master Plan, Conditional Use, and Modification to the Ada County Oregon Trail Recreation Area. To whom it may concern, In 2002 Ada County was awarded a $300,000 grant from Idaho Transportation Department to purchase land and easements to protect remnants of Oregon Trail between Highway 21 and Bonneville Point. After successfully obtaining and protecting several sections of Oregon Trail, Ada County was granted $348,000 from Idaho Department of Parks and Recreation and $80,000 from Simplot to construct a paved parking lot and informational kiosks at the current location of the Oregon Trail Recreation area off Highway 21. This Master Plan and Conditional Use application is documentation of the work that has previously been performed under other agreements and includes the addition of a pit vault toilet that was included in previous planning efforts. The Ada County Oregon Trail Recreation area encompasses 24.94 acres of Ada County land, off Highway 21, 14 acres of Ada County property off East Columbia Road and S. Wagons View Ave, 350 acres of BLM land, and trail license agreement on Simplot Corporation for a total of 5 miles of non-motorized trail. The planning effort to develop the recreation area began in earnest in 2008. Although all the necessary steps to complete the masterplan were undertaken, a formal submittal for the master planning process wasn’t completed. In July of 2008, the State of Idaho Department of Transportation provide a quick claim deed to Ada County for the 24.94 areas where the entrance road, parking lot and main Oregon Trail Recreation Area kiosks now exist. The quitclaim deed and survey information can be found in appendix 2. The Oregon Trail Recreation Area parking lot and kiosk was approved in March of 2010 (building permit #1000222 Oregon Trail Trailhead) and is included in Appendix 2. The Ada County Board of Commissioners approved the Oregon Trail Kiosk Grant Application (Grant No. 0907-A) as recorded in the January 27, 2009 BOCC minutes. The Recreation area is open during day light hours and is gated at sunset with a gate on the inbound lane and a one way traffic spikes for the parks outbound lane. A recent survey shows the park is used by hikers, runners, bikers, dog walkers, equestrians and those interested in Oregon Trail history. It’s estimated that 30 to 100 people visit the area each day.
ADA COUNTY
PARKS AND WATERWAYS BARBER PARK EDUCATION
EVENT CENTER
4049 Eckert Road Boise, Idaho 83716-8814
Phone (208) 577-4575 Fax (208) 577-4579
The master plan most of which has already been completed included:
• A parking lot with 32 spaces for general vehicles, 12 pull through spaces for buses and truck and trailer, and 4 handicapped van accessible spots;
• An information kiosk area in the shape of prairie schooner/pioneer wagon;
• Columnar rock columns as a back drop;
• Six large information panels on early day Oregon Trail travelers and local history;
• Two large kiosks for trail maps and recreation area rules;
• Two smaller kiosks just off the parking lot with maps showing the Oregon Trail route from Boise to Glens Ferry with some of the historic locations along the way.
• 5-miles of non-motorized trail;
• 2’ post on the east side of the road to prevent motorized vehicles from entering the recreation area;
• Split rail fencing with rock columns surrounding the parking lot and entrance way;
• A 180 square foot ADA pit toilet;
Ada County Parks & Waterways is requesting approval of the Master Plan and Conditional Use permit to continue to carry out the items listed in the original planning done for the Oregon Trail Recreation area. This includes continuing the development of trails, replacement/updating kiosk information, adding additional kiosks along old sections of Oregon Trail at the Ada County property off Columbia Road and Wagons View, and installation of an ADA pit toilet identified in the plan. Sincerely, Mike Edwards Ada County Parks & Waterways Opens Space & Trails Coordinator
ADA COUNTY DEVELOPMENT SERVICES- Mailing: 200 W. Front Street, Boise, ID 83702 Website: adacounty.id.gov Phone: 208-287-7900 Fax: 208-287-7909 Page 1 of 2 VERSION: NOVEMBER 2018
MASTER SITE PLAN CHECKLIST (ACC 8-4E) A Master Site Plan Request is a staff level application, as long as it is not associated with a conditional use. GENERAL INFORMATION: Applicant: DESCRIPTION Staff:
MASTER APPLICATION FORM
DETAILED LETTER by the applicant fully describing the request or project & addressing the following:
Proposed Use(s)
Is the project associated with a Conditional Use: YES NO
Total square feet of all proposed structures
Is this a modification and/or expansion of an approved master site plan: YES NO Original MSP File#
Hours & Days of Operation:
Number of Required Parking Spaces (include ADA parking stalls)
Number of employees (during largest shift) & Total number of employees
Maximum number of patrons/clients expected (daily average)
Outdoor Speaker System: YES NO (If yes, identify location & proposed hours)
Proposed Sewer or Septic System
Proposed Water System or Well
Type of Irrigation: Pressurized Gravity None Other (Explain)
Explain if utilities are underground, or if screening is provided
Phased Project: YES NO (Explain phases of parking & landscaping)
SITE PLAN: Full-sized, scaled plot plan, showing all existing and proposed easements, property lines, structures, septic and well locations, and existing and proposed driveways drawn to scale, including one copy reduced to 8 ½” x 11” to include the following:
Structure(s) locations on subject property
Outdoor Speaker System. Identify the location(s) and size of proposed speakers
Pedestrian access and circulation
Building Elevations
Drive-Up Window: YES NO (If yes, identify location & stacking lane)
Well location(s)
Septic System & Drain field location(s)
Hydrant location, fire department access, fire flow resources, etc.
Pressurized Irrigation (if required)
Automobile access and circulation
OFF STREET PARKING & LOADING FACILITIES PLAN (ACC 8-4G) Can be included on the site plan
Identify all off-street parking and loading spaces
Identify the proposed drive aisle width:
Parking within 300-feet of the entrance: YES NO
Joint Parking Agreement: YES (submit copy of agreement) NO
Identify width, angle, and depth of parking spaces
Address Bicycle Parking/Bicycle Racks
List the number of required spaces for cars/vehicles, loading spaces and bicycles:
List the number & dimensions of off-street loading spaces:
Detailed description of proposed paving materials:
NATURAL FEATURES ANALYSIS (ACC 8-4E-4D)
Hydrology (Visit www.fws.gov/wetlands/data/mapper.html)
Soils (Visit www.nrcs.usda.gov)
ADA COUNTY DEVELOPMENT SERVICES- Mailing: 200 W. Front Street, Boise, ID 83702 Website: adacounty.id.gov Phone: 208-287-7900 Fax: 208-287-7909 Page 2 of 2 VERSION: NOVEMBER 2018
Topography
Vegetation
Sensitive Plant & Wildlife Species (Provide Letter from Idaho Dept. of Fish & Game)
Historic Resources
Hazardous Areas
Impact on Natural Features
LANDSCAPING (ACC 8-4F): - can be a condition of approval (NOTE: If landscape plan is submitted after approval, as a condition of approval, additional application and review fees will apply.)
One (1) Full-sized, scaled landscape plan, and one (1) 8 ½”x 11” landscape plan to include the following:
Drawn by a landscape professional (required within a City’s Area of Impact)
Location, size, type of proposed landscaping (shown at 75% maturity)
Proposed size at planting (i.e., caliper, gallon, etc.)
Existing vegetation to remain: YES NO
Fences over 100-feet in length: YES NO
Flood Hazard Overlay: YES NO
Sound Walls Proposed: YES NO
Perimeter Landscaping & Screening
Required landscape points:
Minimum width of landscape areas:
Parking Area Landscaping & Screening
Percentage (%) of parking area shading required:
Screening: YES NO
Pedestrian access required: YES NO
LIGHTING PLAN (ACC 8-4H): - can be a condition of approval (NOTE: If lighting plan is submitted after approval as a condition of approval, additional applications and review fees will apply.)
Location, orientation, and height of all proposed exterior lighting (attached & detached)
Detail the type of lighting (include cut sheets of all lighting fixtures)
Setbacks of the proposed lights:
Illumination of lighting:
Watts:
Lumens output:
Luminous area:
Photometric test report
Maximum Height:
Floodlights: YES NO
Shielding: YES NO Identify extent of shielding including cut off angles
SIGN PLAN (ACC 8-4I): - can be a condition of approval (NOTE: If signage plan is submitted after approval as a condition of approval, additional applications and review fees will apply.)
APPLICATION FEE: $350 (base fee) + .12/square foot (for all proposed structures) NOTE: Building, Engineering, and Surveying applications and fees may be required and are separate from Planning & Zoning Applications and Fees.
Supplementary information at the discretion of the Director or County Engineer may be required to sufficiently detail the proposed development within any special development area, including but not limited to hillside, planned unit development, floodplain, southwest, WUFI, Boise River Greenway, airport influence, and/or hazardous or unique areas of development.
Application will not be accepted unless all applicable items on the form are submitted. This application shall not be considered complete until staff has received all required information.
Tab 2 Site Plan and Specifics Documentation
Tab 2 Specific Documents
Tab 2a Quitclaim Deed
State of Idaho Department of Transportation deed of Oregon Trail Recreation Area (Parking Lot and
Kiosk Area) to Ada County.
Tab 2b Survey of Deeded Property
This includes JUB engineering survey plans.
Tab 2c BOCC Minutes Approving Grant for Parking Lot and Kiosk Construction.
This includes the January 27, 2009 BOOC minutes approving the Oregon Trail Recreation Area grant
applications to construct the parking lot and kiosk – see item IV.10.
Tab 2d CSHQA Oregon Trail Entrance Road and Parking Lot Site Plans.
Tab 2e Oregon Trail Lighting Schematic
Tab 2f CSHQA Oregon Trail Park Layout in Color
Tab 2g CSHQA Amphitheater Rock Layout Schematic
Tab 2h CSHQA Rendering of Amphitheater Rock Layout West Side
Tab 2i CSHQA Rendering of Amphitheater Rock Layout West Side
Tab 2j CSHQA Projected Scope of Services
Tab 2k Pre-construction Meeting Notes
Tab 2l CSHQA Structural Design Calculations for Oregon Trail Project
Tab 2m Ada County Development Services Building Permit #1000222
Tab 2n Site Plan Showing the Location of Layback Kiosks
Tab 20 Sit Plan Showing Future Location of Vault Toilet
Tab 2p CXT Vault Toilet Specifications.
Minute B o o k - -_., Commissioners, Ada County, Idaho
OPEN JANUARY 27,2009 Session, A.D. -
BOARD OF ADA COUNTY COMMlSSIONERS MINUTES OF THE OPEN BUSINESS MEETING
TUESDAY, JANUARY 27,2009 9:00 A.M.
The Board of Ada County Commissioners (Board) met this date in an Open Meeting in the Commissioners' Conference Room of the Ada County Courthouse Complex to act on the following items. Staff members present: Dave Navarro, ClerWAuditorlRecorder's Office; Tim Tallman, Assessor's Office; Bob Kobza, Purchasing; Dave Neal, Solid Waste Management; Dave Logan and Bruce Krisko, Operations; John Caywood, Recreation & Event Services; Sherry Morgan, Prosecuting Attorney's Office; and Roxanna Dempsay, Indigent Services. Minutes
Recorder: Pam Woodies.
I. IN THE MATTER OF CALL TO ORDER:
Commissioner Fred Tilman called the meeting of the Ada County Commissioners to order at 9:04 a.m.
11. IN THE MATTER OF ROLL CALL: Commissioners Fred Tilman, Rick Yzaguirre and Sharon M. Ullman were present.
m. CHANGES TO THE AGENDA: There were no changes to the agenda.
IV. NEW BUSINESS 1 . Purchasing (1)
- Opening of RFP 09-1, Ada County Landfill North Ravine Cell, Stage I1
B. Kobza stated that three Requests for Proposals (RFPs) were received and asked that the name of the companies be read into the record.
F. Tilman stated that an RFP was received from Hap Taylor and Sons Inc. d/b/a Knife River, DelHur Industries and Western Construction Inc.
B. Kobza asked that the award in this matter be tabled until February 10,2009, to allow the Evaluation Committee to evaluate the RFPs.
ACTION: R YZAGUIRRE MOVED TO TABLE RFP 09-1, ADA COUNTY LANDFILL NORTH RAVINE CELL, STAGE I1 UNTIL FEBRUARY 10, 2009. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI-
MOUSLY.
S. Ullman asked if copies of the RFPs could be provided to the members of the public who are present. F. Tilman responded negatively and said the documents could not be provided to the public until they were evaluated.
2. Operations (2) (Authorize the Chairman to Sign)
a. Change Order No. 1, Benjamin Campus Phase I1 (increase $64,642.35)
D. Logan stated that this Change Order was for extra work that was added to the project. The first portion is for an inert fire suppression system in the computer room. They are also adding extra insulation that they found was missing inside the exterior northwest wall. Additionally, they are adding a display system for the driver's license area and repairing a back-flow preventer that was found to be defective upon inspection.
F. Tilman asked if the $64,652.35 was within the contingent amount of the bid. D. Logan answered affirmatively. F. Ti1ma.n inquired if there were any other Change Orders on this project. D. Logan replied there had not been.
S. Ullman wondered if the back-flow preventer was under warranty if it was defective and brand new. D. Logan clarified that it was an old existing one that appeared hnctional but when it was inspected, it was found to be defective.
Minute Book- - --., Commissioners, Ada County, Idaho OPEN JANUARY 27,2009
Session, A.D. -
- -. -
I
b. Change Order No. 3, Benjamin Campus Phase I (increase $36,227.34)
I
D. Logan stated that this was the last Change Order for this project and the project was being closed out. It includes data and power for systems furniture that was added to the project. They also installed recessed mailboxes and
exterior signage to the building with electric run to it. As well, emergency power for lights was added. They completely changed the way they planned to wire exit lights. They wanted to wire the lights so they could be tested every once in a while without shutting the whole building down. They found out they could not do that, so they changed the wiring. This Change Order of $36,227.34 is within budget. He anticipated closing the project out by the end of the month.
S. Ullman inquired if the insulation was already in place. D. Logan answered that it was within the walls and had a big one-foot false wall along the section. Once they tore into it, they found out the first eight feet had insulation but the rest had none.
ACTION: R YZAGUIRRE MOVED TO APPROVE CHANGE ORDER NO. 1, BENJAMIN CAMPUS PHASE I1 (INCREASE $64,642.35) AND CHANGE ORDER NO. 3, BENJAMIN CAMPUS PHASE I (INCREASE $36,227.34); AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. S. ILLMAN SECONDED. R. YZAGUlRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
3. Licenses (Authorize the Chairman to Sign) a. Catering Permits (1)
- End Zone at Barber Park Events Center for TroutICraven Wedding, February 7th from 3:30pm to 10pm.
b. New Licenses (2) 1. Buffalo Wild Wings, 3323 E. Louise Dr. #103, Meridian, BeerILiquor 2. Thai House Express, 6580 S. Federal Way, Boise,. BeerIWine
D. Navarro thanked the Board for having one vendor at Barber Park and said End Zone was very helpful. He also appreciated the Board's assistance expediting Buffalo Wild Wings, which will be on the city of Meridian's agenda tonight. He stated that the required fees were paid and the above- listed items are properly before the Board.
ACTION: S. ULLMAN MOVED TO APPROVE ONE CATERING PERMIT AND TWO NEW LICENSES AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
4. Auditor's Office
D. Navarro asked if F. Tilman wished to sign the Balance Sheet for the fiscal year ending 2008. He remarked that since the Chairman signs all Legal Notices that are published over his name, he might prefer to sign the Balance Sheet before it is published. F. Tilman agreed and signed.
5. Claims Journal (1) - January 22,2009
ACTION: S. ULLMAN MOVED TO AUTHORIZE PAYMENT OF CLAIMS AGAINST THE COUNTY AS LISTED ON THE CLAIMS JOURNAL DATED JANUARY 22, 2009. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TlLMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
I
M ; w ~ , I ~ P RML Crrrnrnirrinnern- Ada Countv, Idaho
Minute Book-.-- -? Commissioners, Ada County, Idaho OPEN JANUARY 27,2009
Session, 4.D. -
6. Personnel Action Forms (1 Elected Official Appointment; 16 Salary Increases) I ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE ELECTED
OFFICIAL APPOINTMENT AND 16 SALARY INCREASES AS IDENTIFIED ON THE SLTMMARY OF THE PERSONNEL ACTION FORMS; AND THAT THE SUMMARY SHEET REMAIN ON FILE IN THE COMMISSIONERS' OFFICE. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI- MOUSLY.
b. 2008 Primary (6) 1. R09 190002 13 Kieffer Judi L 2. PlNORINDMOl Nonvest Industrial Mat Ltd Co 3. P l SIDESPOOl Sidelines Sport Bar 4. MKITC082701 Peregrine Fund The 5. P 1 ACTMORTO 1 Activa Mortgage 6. MBROA741401 Pulley Jerry
~
ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE TAX CANCELLATION FOR 2007 AND SIX FOR 2008 AS LISTED ON THE AGENDA; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCLMENTS ON BEHALF OF THE BOARD. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
7. Tax Cancellations (1 - 2007; 6 - 2008) (Authorize the Chairman to Sign)
a. 2007 Primary (1) - MBROA761409 McCurdy Charles
8. Recreation and Event Services (Authorize the Chairman to Sign) - Barber Park Education & Event Center (Interim Events) (2)
1. Dana Carpenter, Wedding and Reception, March 14,2009 2. Kathy Chambers, Wedding and Reception, September 27,2009
ACTION: S. LTLLMAN MOVED TO APPROVE TWO BARBER PARK EDUCATION & EVENT CENTER INTERIM EVENTS AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
9. Volunteer Board Appointments (1) - Appointment of Jake Centers to the Ada County Waterways Advisory Committee
for a three-year term expiring 1/27/2012
ACTION: R. YZAGUIRRE MOVED TO APPROVE ONE VOLUNTEER BOARD APPOINTMENT AS READ INTO THE RECORD. R. YZAGUlRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANIMOUSLY.
10. Grants (1) (Authorize the Chairman to Sign) - Grant No. 0907-A - Oregon Trailhead and Interpretive Kiosk Grant Application
to Idaho Department of Parks and Recreation ($1 19,458 with Match of $80,542 from Donation) (10/1/09-6/1/10)
J. Caywood stated that this was a grant application for the trailhead on Highway 21 where the County received the land for free from the Idaho Transportation Department and it is heavily used. They want a nice facility and this grant money enables it to be paid for with other people's money.
Minute B o o k - --, Commissioners, Ada County, Idaho OPEN JANUARY 27,2009
Session, 4.D. - . . _ - - _ - _ _ -
7 -
S. Ullman asked who donated the $80,542. J. Caywood responded that it came from Simplot's cultural mitigation when they put a subdivision in along the Oregon Trail. This is a partnership that goes back with Idaho Power, Simplot, Bureau of Land Management and several other entities. The County ended up with mitigation money and plans to put in an Oregon Trail interpretation kiosk with the money as well as some of the infrastructure. The trailhead portion would be from the grant monies.
ACTION: S. LILLMAN MOVED TO APPROVE ONE GRANT APPLICATION AS READ INTO THE RECORD; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCLMENT ON BEHALF OF THE BOARD. R. YZAGUIRRE SECONDED. S. ULLMAN, AYE, R. YZAGUIRRE, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED LNANIMOUSLY.
Agreements (2) (Authorize the Chairman to Sign the Appropriate Documents) a. Agreement - No. 7311-1-09 - First Amendment to Agreement Between Ada
County Solid Waste Management and G2 Energy Hidden Hollow, LLC (G2 Energy) Regarding Landfill Gas, Recognizing That a Subsidiary of Fortistar, LLC Acquired Majority Interest in G2 Energy and That G2 Energy Changed Its Name to Hidden Hollow Energy, LLC, and Is Now Domiciled in Delaware
b. Agreement No. 8479 - Agreement Between Ada County Expo Idaho and Romeo Entertainment Group, Inc. for Comprehensive Grandstand Entertainment Services for 2009 Western Idaho Fair (10/1/08-9/30/09)
ACTION: R. YZAGLJIRRE MOVED TO APPROVE TWO AGREEMENTS AS LISTED ON THE AGENDA; AND AUTHORIZE THE CHAIRMAN TO SIGN THE APPROPRIATE DOCUMENTS. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. ULLMAN, AYE, AND F. TILMAN, AYE. THE MOTION CARRIED UNANI- MOUSLY.
V. INDIGENT SERVICES: 1. Weekly Indigent Items (Authorize the Chairman to Sign)
(8 Approvals; 26 Denials; 37 Liens; 36 Form N1 (UCC) Liens; 8 Release of Liens; and 8 Release of Form N1 (UCC) Liens)
R. Dempsay presented the Staff report. Ada County Indigent Services submitted a request for 6 approvals and 19 denials on Medical Case Nos. 0901-076 through 0901- 100; and 2 approvals and 7 denials on General Assistance Case Nos. 0901-335 through 0901-343. Indigent Services also requested approval for the recording of 37 Liens, 36 Form N1 (UCC) Liens, 8 Release of Liens and 8 Release of Form N1 (UCC) Liens.
ACTION: R. YZAGUIRRE MOVED TO APPROVE THE RECOM- MENDATIONS OF M A COUNTY INDIGENT SERVICES LISTED IN THE SUMMARY OF CASES DATED JANUARY 27, 2009, FOR 6 APPROVALS AND 19 DENIALS ON MEDICAL CASE NOS. 0901-076 THROUGH 0901-100; AND 2 APPROVALS AND 7 DENIALS ON GENERAL ASSISTANCE CASE NOS. 0901- 335 THROUGH 0901-343; APPROVE THE RECORDING OF 37 LIENS, 36 FORM N1 (UCC) LIENS, 8 RELEASE OF LIENS AND 8 RELEASE OF FORM N1 (UCC) LIENS; AND AUTHORIZE THE CHAIRMAN TO SIGN THE DOCUMENTS ON BEHALF OF THE BOARD. S. ULLMAN SECONDED. R. YZAGUIRRE, AYE, S. LILLMAN, AYE, AND F. TILMAN, AYE. THE MOTION C A W E D UNANIMOUSLY.
Minute Book- ---., Commissioners, Ada County, Idaho
OPEN JANUARY 27,2009 Session, A.D. -
VI. IN THE MATTER OF RECESS: There being no further business to come before the Board at this time, the meeting was recessed at 9:20 a.m.
ATTEST:
Navarro, Ada County Clerk
1
2
3
4
5
6
7
9
10
11
12
1 – Large Map kiosk and layback map shown in slide 2”
2 – “Main Oregon Trail Back Country Byway”
3 – “Boise River Valley”
4 – “Watchable Wildlife”
5 – “Natural Rim Opening”
6 – “Oregon Trail” obelisk
7 – “Habitat is Home”
8 – “Danger Abrupt Edge Severe Erosion Area”
9– USBR corner section survey pin 2012
10– Barbed wire fence (possible removal)
11 – DOI USBR corner section survey pin
Proposed vault toilet
location
Tab 3 Natural Features Analysis
Tab 3a U.S Fish and Wildlife Service, National Wetlands Inventory
Tab 3a Oregon Trail Hydrology and Wetlands
The U.S Fish and Wildlife Service data map shows there are no wetlands or waterways within the
Oregon Trail Recreation Area.
Tab 3b National Soil Conservation Service Soil Survey Maps
The soil survey provides data maps that inform users on soil conditions and how the related to
numerous activities. Since the Oregon Trail Recreation Area is primarily focused on recreation, habitat
and history. The NRCS interactive soil survey was used to look at soil rutting potential, suitability for
trails, erosion hazards, corrosive characteristics on cement (the effects on building materials). Most of
the site consists of either 38 – Chilcott-Sebree Complex, Bedrock Substratum, 2 to 4 percent slopes or 71
– Jenness fine Sandy Loam, 0 to 2 percent slopes. A small portion of the site is rock outcrop represted by
158 Rock Outcrop – Trevino Complex, 5 to 20 percent slopes.
Soil Rutting Hazard
The data revealed that 56% of the area within the Recreation Area has sever rutable soils types. These
soils include Chilcott silt loam and Chilcot-Sebree soils. These soils are known to rut with as little as 2 to
4% slopes. Any new trail development will need to incorporate numerous grade reversals and other
structures to keep water from running down the trail.
Soil Suitability for Trails.
Soil suitability is based on the soil properties that affect trafficability and erodibility. These include
stoniness, depth to water table, ponding, flooding, slope and texture of the surface layer. The data
reveals that 72% of the trails are somewhat limited to trail development and sustainability because the
Chilcott soil types break down and are dusty.
Erosion Hazards
This rating is based on the hazard of soil loss from trail-based activity based on slope, soil erosion factor
and an index of rainfall erosivity. Since the area is mostly flat with little rain fall, 73% of the area is only
slightly erodible. This rating indicates that erosion is unlikely under ordinary climate conditions.
However, there are some a couple of old roads and trails that are very steep which increases the
erodibility in these spots.
Erosion of Concrete
The soil data for concrete erosion looks at the potential of soil types to chemically or electrochemically
corrode or weaken concrete. The soil types in the Recreation Area are shown to have a low impact on
concrete building materials.
Tab 3c Topography
Topography maps have been provided for three separate regions of the Oregon Trail Recreation Area.
They are labeled East, Central and West. The area of the site where the vault toilet, parking lot trailhead,
and kiosks is located is generally flat with slopes less than 15%. The property generally drains in a
northwesterly direction. There are some portions of the site where the slopes exceed 15%.
Tab 3d-f Sensitive Plant, Wildlife and Natural Resources
The Idaho Department of Fish & Game does not have records of any special-status animals or plants
occurring within the proposed project. They do not anticipate the projects to have an adverse effect on
native plant or terrestrial wildlife populations.
Historic Resources
The Ada County Historic Sites Inventory shows the site is in the proximity to the Oregon Trail with wagon
ruts crossing through several areas. Trail ruts are visible in the recreation area and there are markers
highlighting the Oregon and Kelton trails through the area.
Hazardous Areas
Not Applicable.
Impact on Natural Features
The impact onto natural features will be minimal with majority of the recreation area is in the natural
state.
July 27, 2007 Travis Pitkin Compliance Archaeologist Idaho State Historical Society State Historic Preservation Office Statehouse Mail RE: SH-21: I-84 Diversion Dam, Stage 2 Project # STP-F-3291(28), Key # 2623 Travis, As you are aware, the Idaho Transportation Department constructed a bridge near Diversion Dam during the 1990s. As part of that project, ITD agreed to help develop an Oregon Trail Interpretive Site area located between the new bridge and I-84. Numerous correspondences between ITD and your office occurred, regarding both the construction of the new bridge and associated extension of SH-21, and the planning phase of this proposed interpretive site. Although the bridge and highway portions of the project were constructed, until now the Oregon Trail Interpretive Site area has never been developed. The MOA, entered into by numerous signatories, stipulated that ITD shall: Supervise Columbia Village Joint Venture (CVJV) in the planning and construction of an informational kiosk to be located near the parking lot that is planned and will be built on the south side of Highway 21, in Parcel G.
Recently, Ada County Parks and Waterways requested a land transfer from ITD so this Oregon Trail Interpretive Site can be constructed by them. ITD would like to approve this land transfer. After reviewing the project file documentation, it appears that the area proposed for the land exchange was surveyed during previous investigations. No historic properties were identified in the location of the proposed Oregon Trail Interpretive Site. The transfer of property for the development of the Oregon Trail Interpretive Site will proceed with Ada County Parks and Waterways assuming the following stipulations:
• SHPO is able to review, comment, and approve the nature of the interpretive site exhibits including the kiosks.
• SHPO will help develop the information contained in the interpretive site exhibits including the kiosks.
• Ada County will be responsible for the construction of the Oregon Trail Interpretive Site. There will be NO EFFECT to historic properties as a result of these project actions.
If you have any questions, please feel free to contact me at [email protected] or 334-8449. Thank you, Marc Münch State Highway Archaeologist Enclosure
1
Tab 4 Public Input
Tab 4 Public Letters of Support
Tab4a Surprise Valley Letter of Support of Proposed Improvements
Tab 4b Boise Parks & Recreation/Ridge to Rivers Letter of Support
Tab 4c Boise Young Rider Development Squad (BYRDS) Letter of Support