36
ORFORD MINING Orford Mining Corporate Presentation September 2019 TSXV: ORM

ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

ORFORD MINING

Orford MiningCorporate Presentation

September 2019

TSXV: ORM

Page 2: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 20192

Cautionary Statement Concerning Forward-Looking Statements

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this presentation.

This presentation contains "forward-looking information" including without limitation statements relating to the liquidity and capital resources of Orford and potential of one or more of the Qiqavik

and West Raglan properties.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Orford to be materially

different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could affect the outcome include, among others: future

prices and the supply of metals; the results of drilling; inability to raise the money necessary to incur the expenditures required to retain and advance the properties; environmental liabilities

(known and unknown); general business, economic, competitive, political and social uncertainties; accidents, labour disputes and other risks of the mining industry; political instability, terrorism,

insurrection or war; or delays in obtaining governmental approvals, failure to obtain regulatory or shareholder approvals. For a more detailed discussion of such risks and other factors that could

cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to Orford's filings with Canadian securities regulators available on SEDAR at

www.sedar.com.

Although Orford has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may

be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this

presentation and Orford disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by

applicable securities laws.

The TSXV has neither approved nor disapproved the contents of this presentation.

Qualified Person and Quality Assurance and Quality Control

The disclosure of scientific and technical information contained in this presentation has been approved by Alger St-Jean, P.Geo, Vice President, Exploration of Orford, a Qualified Person under NI

43-101.

Samples reported in this presentation and indicated as grab, outcrop, sub-outcrop, boulders and float are grab samples. Grab samples are selective by nature and values reported may not be

representative of mineralized zones. All drill intervals reported in this presentation are down-hole core lengths as true thicknesses cannot be determined with available information.

The work program at Qiqavik was supervised by Michelle Sciortino, P.Geo, Senior Project Geologist who is responsible for all aspects of the work, including the quality control/quality assurance

program. On-site personnel at the project log and weigh all samples prior to sealing and shipping. Sample shipments are sealed and shipped to Techni-Lab, Sainte-Germaine-Boulé, Québec. All

gold assays reported were obtained by either 350-g screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish (method 1A2-5 and 1A3-50) at. The 350-g screen assay

method is selected by the site geologist or the lab when samples contain coarse gold or higher percentage of sulfide mineralization that may be associated with gold relative to surrounding

intervals. All samples are also analyzed for multi-elements, including copper and silver, using a four-acid method with an ICP-EOS and ICP-MS finish at Techi-labs affiliated Actlabs in Ancaster,

Ontario. Overlimits were analyzed by peroxide fusion with ICP-EOS finish. Drill program design, Quality Assurance/Quality Control (“QA/QC”) and interpretation of results is performed by qualified

persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are inserted at a minimum of 10% and 5% for core and grab samples

respectively for QA/QC purposes in addition to those inserted by the lab. A subset of samples has not yet been sent for a verification assay at another lab.

Techni-Lab Laboratory, is a subsidiary of Act Labs, is accredited (n. 707) by the Standards Council of Canada and found to comply with the requirements of ISO/IEC 17025:2005 (CAN-P-4E) and

CAN-P-1579.

The technical information disclosed herein in respect of the Qiqavik Property is based on the independent report of Clement Dombrowski, P.Geo and Sylvain Desbiens P.Geo. titled “NI 43-101

Technical Report on Qiqavik Project, Northern Quebec, Canada” effective September 14, 2017, and on Orford Mining’s press releases available on SEDAR. The information disclosed herein in

respect of the West Raglan Property is based on the independent report of Clement Dombrowski, P.Geo. titled “NI 43-101 Technical Report on West Raglan Project, Northern Quebec, Canada”

effective February 20, 2017.

Disclaimer

Page 3: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 20193

Why Orford Mining?Investment Highlights

New strategic investor

Qiqavik Project:

discovery of new gold

district

West Reglan: potential

for multiple large, high

grade Ni-Cu-PGE

deposits

Safe, proven mining

jurisdiction

• Recently completed two equity financing raising a total of C$4.6M whereby Alamos Gold became a

22.2% shareholder (May 17 and July 5, 2019)

• Widely-held ownership with several strategic shareholders (Alamos, Dundee, RNC Minerals)

• Property covers 348 km2 of the highly prospective and underexplored Cape Smith Belt

• Identified a 40-km long Qiqavik Break Shear Zone with 11 gold mineralized areas, which remain

largely unexplored

• 2018 drill program discovered up to 24.6 m thick gold mineralization at Interlake Area

• The 2019 exploration program has just wrapped up – most results are pending

• Projects located in Quebec, which was the 4th ranked jurisdiction in the world for mining investment

attractiveness according to 2018 Fraser Institute survey

• Success of mines such as Meadowbank, Meliadine and Raglan demonstrates viability of

discovering and developing large-scale mining projects in northern Canada

• Advanced stage Ni-Cu-PGE exploration project covering nearly 470 km2 in the Cape Smith Belt

• Identified outcropping mineralization over +35 km of strike, many zones have very limited testing

• Frontier Zone: similar geology to Glencore’s Reglan Mine (MI&I: 35Mt at 3.2% Ni, 0.93% Cu and 3.2

g/t PGE1) with high-grade (2-3% Ni, 3+ g/t PGE) mineralized lens clusters over a 2,500 m strike

1. This information is not necessarily indicative of the mineralization on Orford Mining’s properties

Page 4: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 20194

Capital Structure

Ticker TSXV:ORM

Share Price (as of Sept. 8, 2019) C$0.105

Basic Shares Outstanding1 95.0M

Options (weighted avg. strike of C$0.32) 6.6M

Warrants (weighted avg. strike of C$0.68) 13.9M

Fully Diluted Shares Outstanding 115.5M

Market Capitalization (Basic) C$10.0M

Cash1 C$2.0M

Share Ownership

Share Price Performance

1. June 30, 2019

2. Includes the following institutions: Marquest Asset Management, T.I.P Wealth Manager, Caisse de dépôt et

placement du Québec and SIDEX.

Source: S&P Capital IQ

Corporate SnapshotCapital Structure and Share Ownership

RNC Minerals

(TSX:RNX)

24%

Alamos Gold

(TSX:AGI)

22%

Institutions²

21%

Dundee

Resources Ltd.

14%

Retail & Other

19%

Management &

Insiders…

0.00

0.05

0.10

0.15

0.20

0.25

0.30

$0.00

$0.05

$0.10

$0.15

$0.20

$0.25

$0.30

$0.35

Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19

Vo

lum

e (

millio

ns)

Sh

are

Pri

ce

(C

$)

Volume (M) Share Price (C$)

Page 5: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 20195

David ChristiePresident, CEO, and

Director

• Professional Geologist with more than 33 years of experience in the resource sector

• Former Vice President with Goodman & Company Investment Counsel and Dundee Resources Inc.

• Former President, CEO, and Director of Eagle Hill Exploration and former mining research analyst at TD and Scotia

• Director of eCobalt Solutions Inc. and former director of Osisko Mining Inc. and Condor Precious Metals (private)

Tim HollaarCFO

• +20 years of experience in mining industry finance positions

• Served in senior finance and marketing positions with several nickel companies

Alger St-JeanVP Exploration

• Professional Geologist with +25 years of experience in mineral exploration and development

• Current VP Exploration of RNC Minerals and former Senior Geologist at Xstrata Nickel (formerly Falconbridge)

Michelle SciortinoSenior Project Geologist

• Professional Geologist with +10 years of experience in mineral exploration and development

• Current Senior Project Geologist with RNC Minerals

Mark SelbyChairman

• Current President and CEO of RNC Minerals, with +20 years of experience in finance and corporate development at

various companies, including Quadra Mining and Inco Limited

• Former VP Business Planning & Market Research at Quadra Mining

John LeddyDirector

• Over 20 years of experience as a business lawyer and in private equity specializing in M&A, capital raising and

structuring and other strategic transactions

• Current VP, Business Development and General Counsel of RNC Minerals

• Former Partner in Business Law Group (M&A) at Osler

Mark GoodmanDirector

• Former Executive VP and COO of Dundee Corporation and Chairman of Dundee Sustainable Technologies

• Previous CEO of Ryan Gold, Valdez Gold, Cogitore Resources, a base metal exploration company in Northern Quebec

Lawrence SmithDirector

• +25 years of experience in investment management, equity research, and banking – MBA and CFA holder

• VP Portfolio Management and Research at CIBC Asset Management, Director of Equity Research at Scotia Capital

and Blackmont Capital, and Project Manager – Corporate Development at Rio Algom Limited

Ben PullingerDirector

• Professional Geologist with over 15 years of exploration and mining experience

• Current Senior Vice President of Geology for Excellon Resources Inc.

• Former Vice-President Exploration at Roxgold Inc.

Peter MacPhail

Director• Professional Engineer with over 25 years of operational experience

• Current Chief Operating Officer of Alamos Gold Inc.

• Former Chief Operating Officer of AuRico Gold

Management & Board of DirectorsHigh Quality Exploration Team and Capital Markets-Focused Board

Page 6: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

TSX-V:ORM

Orford Mining

Over 818 km2 land position in the highly prospective and underexplored Cape Smith BeltQuebec: 4th ranked jurisdiction in the world for mining investment attractiveness according to 2018 Fraser Institute survey

Qiqavik Project (100%)

• ~348 km2 property in the upper Cape Smith Belt, in 2019

added 10% to our property position to cover IP Lake trend

• 40 km long Qiqavik Break Shear Zone

• Discovered 11 large gold-mineralized areas

• 2018 drill program (8 holes, 1,211 m) discovered up to

24.6 m thick mineralization at Interlake Area

West Reglan Project (100% Interest)

• ~470 km2 property in the lower Cape Smit Belt

• Traced outcropping sulphide mineralization over +35 km strike

• Frontier Zone: identified five high-grade (2-3% Ni, 3+ g/t PGE)

mineralized lens clusters over a 2,500 m strike

• Frontier Zone has comparable geology to Glencore’s Raglan

Mine

Hope Bay (TMAC)Commercial production in 2017. 7.7 g/t Au reserve grade

Meadowbank (Agnico Eagle)Commercial production in 2010. 3.5 g/t Au reserve grade

Meliadine (Agnico Eagle)Commercial production in May 2019. 7.0 g/t Au reserve grade

Reglan (Glencore)Produces 37,000 tonnes per year of nickel in concentrate

One of the richest base metal mines in the world

Project PortfolioAdvanced-Stage Exploration Projects in Northern Quebec

September 20196

Following a successful track record of discovering

and developing multi-million ounce gold projects in

Northern Canada

Page 7: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 20197

40-km long Qiqavik Break Shear Zone remains largely unexplored with potential for multiple large gold deposits

1. This information is not necessarily indicative of the mineralization on Orford Mining’s properties

• 100% interest in ~348 km2 of highly prospective

gold properties in northern Quebec

• ~60 km from Glencore’s world-class Raglan Mine

• The parallel ultramafic “Raglan Belt” has yielded

world-class nickel deposits, but the northern

volcano-sedimentary portion of the Belt remains

virtually unexplored

• Property covers the 40 km long Qiqavik Break

Shear Zone and part of the Cape Smith Belt

• Gold districts with similar tectonic and age setting

to the Cape Smith Belt include1:

➢ Flin Flon/Snow Lake, Canada

➢ Ashanti Belt, West Africa

➢ Tanami Goldfields, West Australia

➢ Tapajos-Parima Belt, Brazil

• 11 significant mineralized areas discovered

➢ Includes Interlake, Esperance, Esperance West, Horizon,

Aurora, Aurora West, Gerfaut, Gerfaut South, ABG Zone,

Focused Intrusive and Central Qiqavik

Qiqavik ProjectLarge, Highly Prospective Land Package in an Underexplored Emerging Gold District

Page 8: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik High Grade Gold ShowingsGold Showings at surface are prolific across the 40 km + property

September 20198

Note that grab samples are selective by nature and values reported may not be representative of mineralized zones. Drill intervals reported

in this presentation are down-hole core lengths as true thicknesses cannot be determined with available information.

Page 9: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectFrost Boil Sampling (Primary Prospecting Method)

September 20199

Page 10: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectSpring 2018 Detailed Airborne Magnetic Survey

In April 2018, completed a 6,067 line-km (50 m spacing) airborne magnetic survey over the entire property

September 201910

Page 11: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectSummary of 2017-2018 Exploration Programs

September 201911

2016 2017 2018

Exploration

activities

• Initial IP survey across select areas of

the property

• Prospecting, mapping, surface rock

sampling and till sampling

• Drilled 550 m (6 holes) at Gerfaut

• 721 line-km of airborne magnetic

surveys

• 105.6 line-km of IP surveying

• Prospecting, mapping, surface rock

sampling and till sampling

• 23-hole, 2,723 m drill program

• 6,067 line-km (50 m spacing) airborne magnetic

survey over the entire property

• 541 surface samples, of which 34 surface

samples had values >2 g/t gold

• Geological mapping, prospecting and ground VLF

geophysics

• 8-hole, 1,211 m drill program at Interlake

Key Findings • IP survey identified 10 targets

• Extended strike length of Qiqavik Break

from 15 km to 40 km

• Discovered surface gold at Aurora,

Esperance and Esperance West

• High grade surface gold samples

ranging from 26 g/t Au to 189 g/t Au

• Intersected up to 13.7 g/t at Aurora,

up to 8.8 g/t Au Esperance and 5.6

g/t Au at Esperance West

• Five new surface discoveries at

Aurora Central, Gerfaut South, Central

Qiqavik, Horizon, and Focused

Intrusive

• 34 surface samples over 2 g/t Au, including 342

g/t Au and 149.5 g/t Au

• Drill intercepted up to 24.6 m thick gold

mineralization at the Interlake Area

• Expanded dimensions of surface showings at

Focused Intrusive, Gerfaut South, and Interlake

Highlighted gold surface samples over +40 km Qiqavik Break Highlighted 2017 – 2018 drill results

Page 12: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectAreas of Interest and 2019 Helicopter EM Survey

September 201912

Page 13: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik Project - 2019 Program< 21 weeks of field work 2016-2019 and a lot of smoke but where’s the fire ?

September 201913

2019 Objectives:

• Looking for thick

structural corridors or

packages

• Focus details on a few

specific areas

• Understand Transport

distance at various

parts of the property

• Combine VTEM, IP and

Mapping to generate

high quality targets

• Focus on Interlake, IP

Lake and Esperance.

Completed in 2019:

• Frost Boils: 289(5,022)

• Grab: 627 (2,647)

• Large Tills:153 (213)

• 1128 l-km VTEM

• 38.4 l-km IP (3,161km)

• Diamond drilling: 1,368

metres in 6 holes

(5,852 metres in 43

holes)

Page 14: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201914

Note that grab samples are selective by nature and values

reported may not be representative of mineralized zones.

Drill intervals reported in this news release are down-hole

core lengths as true thicknesses cannot be determined

with available information.

Planned IP Survey Coverage Area

Qiqavik Project2019 Exploration Program

IP survey assisted to target drilling potential gold traps, particularly those that may exist in structures under

the Interlake area string of small shallow lakes

• Commenced program in May 2019

• Three phased exploration program

1. Ground Induced Polarization (IP)

survey to test high priority target

areas including Interlake,

Interlake South and a new visible

gold showing to the SE of

Interlake

➢ 200 m to 400 m line spacing and an

“a” spacing of 25 m

2. Ground targeting IP and

geochemical targets

3. Diamond drilling

Page 15: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik – Interlake and IP Lake AreasTill Sample Results and Infill Till Sampling to Define The IP Lake Structural Zone

September 201915

Page 16: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik – Interlake and IP Lake DrillingBoth Interlake and IP Lake structural tends are extensive and gold bearing

September 201916

Page 17: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik – 10% Property ExpansionCovering extension of newly discovered IP Lake Shear Zone

September 201917

Page 18: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectInterlake 2019 Drill hole QK-19-01 (rush assays 4 metre mineralized zone of 0.93 gpt)

September 201918

Note: Partial results received for the interval 84 to 96m.

Hole Number From (m) To (m)

Interval

(m) Au (g/t)

QK-19-00188.0 89.0 1.0 2.45

91.0 92.0 1.0 1.20

Page 19: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201919

Qiqavik Project – IP Lake Shear ZoneIP Lake 2019 Drill hole QK-19-02 (rush assays: 3 metre mineralized zone of 1.7 g/t (88-91) including 1.4 m of 3.2 g/t (88-89.4 m)

Hole Number From (m) To (m) Interval (m) Au (g/t)

QK-19-002 88 91 3.0 1.70

including 88.0 89.4 1.4 3.24

Note: Partial results received for the interval 87-93m.

Page 20: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-003 Hits IP Lake Shear ZoneQK-19-003– A new extensive and wide shear zone

September 201920

Page 21: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-003 Hits IP Lake Shear ZoneQK-19-003

September 201921

263-278m:

Bleached mafics

with disseminated

to semi massive

sulpides with

graphite along

foliation Up to 15%

pyrite stringers

with graphite

parallel to foliation

Page 22: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-004 hits Interlake Structural ZoneSignificant Mineralization/Alteration/Deformation

September 201922

Hole Number From (m) To (m) Interval (m) Au (g/t)

QK-19-004156.0 159.0 3.0 0.59

177.0 209.0 32.0 0.72

including 197.0 205.0 8.0 1.96

198.0 203.0 5.0 2.8

200.2 203.0 2.8 3.31

Note: Partial results received for the interval 154-211m.

Page 23: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-004Interlake Structural Zone Mineralization

September 201923

198m

Page 24: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-005 drilled nearly 400 metres west of hole QK-19-004

West Interlake Structural Zone

September 201924

Page 25: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik Project – the last hole for 2019 Focused Intrusive QK-19-006

• Focused Intrusive is loaced on the western end of the Aurora Trend.

• Granodiorite intrusive (plug?) associated with a mag low and topo depression.

• Chargeability trend shown in red runs through the intrusive, the hole tested the most chargeable part. The chargeable trend is 1200m long and is very strongly resistive.

• There are till and grab sample Au anomalies.

September 201925

QK-19-006

Page 26: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

QK-19-006Strongly altered section of Granodiorite

September 201926

Page 27: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik Project 2019 Drill Hole Summary and Significant Assay Results received To – Date.

September 201927

Planned Area X Y Az DIP L (m) Target

QK-19-001 Interlake 479000 6823539 180 -45 111 IP charg/high res

QK-19-002 IP lake 482469 6821755 168 -45 111 IP charg/high res

QK-19-003 IP lake 481923 6821446 168 -45 291 IP charg/flat res

QK-19-004 Interlake 477006 6823187 360 -45 285 IP/VTEM

QK-19-005 Interlake 476492 6823497 180 -45 329.68 IP/VTEM

QK-19-006Focused

Intrusive464998 6825964 20 -55 240 IP charg/high res

1367.68 Total meters

Hole Number From (m) To (m) Interval (m) Au (g/t)

88.0 89.0 1.0 2.45

91.0 92.0 1.0 1.20

QK-19-002 88 91 3.0 1.70

including 88.0 89.4 1.4 3.24

156.0 159.0 3.0 0.59

177.0 209.0 32.0 0.72

including 197.0 205.0 8.0 1.96

including 198.0 203.0 5.0 2.8

including 200.2 203.0 2.8 3.31

QK-19-001

QK-19-004

Page 28: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

• Gold mineralization drill tested at Esperance along

300 m of a 1.3 km structure, and at Esperance

West along 650 m of a 2.0 km long structure

• 2017 drill results include 2.5 m at 2.39 g/t Au and

0.26% Cu

• Polymetallic mineralized trend continues at least

1.0 km west of Esperance West drilling

➢ 2017 Horizon discovery yielded 5.67 g/t Au over 0.9 m in

a channel sample

Qiqavik ProjectEsperance and Esperance West

Drill hole locations and significant surface samples from 2017 program

at Esperance and Esperance West Areas

2017 Drill Results at Esperance and Esperance WestHole ID From

(m)

To

(m)

Length

(m)

Gold Grade

(g/t)

Copper

Grade (%)

Esperance Zone

QK-17-008 17.5 20.0 2.50 2.39 0.26

QK-17-010 32.4 33.2 0.76 2.17 0.18

QK-17-011 30.0 31.5 1.50 1.62 0.34

Including 30.9 31.5 0.60 3.35 0.57

QK-17-012 72.8 75.2 2.36 1.17 0.73

QK-17-014 68.0 69.0 1.00 1.03 0.01

Esperance West Zone

QK-17-019 94.0 95.0 1.00 1.05 0.14

QK-17-021 32.0 39.1 7.10 1.59 1.28

including 33.0 34.1 1.10 3.62 2.04

QK-17-021 45.0 46.5 1.51 4.65 0.15

QK-17-022 28.0 35.0 7.00 2.37 2.19

Including 33.0 34.0 1.00 5.58 3.06

QK-17-022 59.0 60.0 1.00 4.75 0.10

QK-17-022 54.3 55.5 1.18 0.73 0.54

QK-17-022 137.0 138.0 1.00 1.02 0.46

September 201928

Page 29: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Qiqavik ProjectEsperance and Esperance West

September 201929

Page 30: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201930

Note: The information disclosed herein in respect of the West Raglan Property is based on the independent report of Clement Dombrowski, P.Geo of IOS Services Geoscientifiques Inc. titled “NI

43-101 Technical Report on West Raglan Project, Northern Quebec, Canada” effective February 20, 2017

Location in the Cape Smith Belt

West Reglan ProjectLarge Land Package in a Rich Nickel, PGE District

Massive 470 km2 property in a prolific, yet underexplored region in Quebec

• 100%-owned, advanced stage Ni-Cu-PGE

exploration project covering nearly 470 km2 in

the Cape Smith Belt, Nunavik, Quebec

• Cape Smith Belt is host to prolific high-grade

polymetallic nickel deposits and includes two

operating mines: Raglan and Nunavik Nickel

• Located ~60 km from Glencore’s Raglan

Mine

➢ Raglan is a first quartile cash cost nickel

operation

➢ One of the highest ore grades among

significant global nickel deposits (P&P

reserves: 11.3Mt at 2.79% Ni, 0.76% Cu

and 2.83 g/t PGE)

• Orford is seeking strategic partners to explore

and develop the property

Ground views of West Reglan property

Page 31: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201931

West Reglan ProjectOverview of Key Targets

Identified outcropping sulphide mineralization over +35 km of strike with limited testing at many zones

• Magnetic signatures, lithogeochemistry, and geology are the same at West Raglan’s Frontier zone as Glencore’s Raglan Mine

• The Southern part of property has magnetic and till anomalies suggestive of Nunavik Mine (South Trend) style mineralization

➢ Nunavik Mine had a 2010 M&I resource estimate of 21.9M tonnes at 0.93% Ni, 1.15% Cu, 0.05% Co and 2.86 g/t PGE

Page 32: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201932

West Reglan ProjectFrontier Zone

• Identified five key mineralized lens clusters

over a 2,500 m strike

• High-grade (2-3% Ni, 3+ g/t PGE) sulphide

lenses outcropping

• High priority targets modelled from BHEM and

3D magnetic inversion suggest vast potential

remains above 250 m depth

• Intersected many high-grade drill holes over

past exploration programs (2003 to 2008)

across the Frontier Zone

Overhead of Frontier Zone with highlighted historical drill intercepts

Page 33: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Orford MiningLocal Community Involvement

• Orford maintains an open dialog with local communities

• Representatives of Salluit, Akulivik and Kativik Regional Gov. (KRG) have visited the site

• Working with LHCs to hire local workforce during summer exploration programs

• 16% (18% in 2017) of workforce in 2018 were Inuit

• 12% (14% of 2017) of exploration expenditures were with Nunavik Inuit Enterprises

• Identifying and notifying communities and Avataq of archeological sites

• Provided in-kind support to KRG for abandoned mineral exploration site rehabilitation

Fostering strong relationships with government, local communities and First Nations Groups

September 201933

Page 34: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Orford MiningReasons to Invest

September 201934

Strong strategic investor support

Massive land position in

emerging new gold district

Potential discovery of multi-million ounce gold

deposits

Safe, proven mining

jurisdiction

Orford Mining has potentially discovered a new gold district in the

highly prospective and underexplored Cape Smith Belt in Northern Quebec

Well-funded and commenced a new exploration program in May 2019

Page 35: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM

Orford Mining

September 201935

Page 36: ORFORD MINING...Technical Report on Qiqavik Project, Northern Quebec, Canada”effective September 14, 2017, and on Orford Mining’spress releases available on SEDAR. The information

Orford Mining

TSX-V:ORM September 201936

Orford Mining

David Christie

President & CEO

[email protected]

416-309-0609

141 Adelaide Street West, Suite 1608

Toronto, Ontario

M5H 3L5

www.orfordmining.com

THANK YOU!

TSX-V: ORM