Outline. Introduction Benchmarking of German Airports GAP Scientific Partners Contact. 1. Introduction. The Research Project. Participants: Joint Research Project of the Universities of Applied Sciences in Bad Honnef, Berlin and Bremen - PowerPoint PPT Presentation
Citation preview
OutlineIntroductionBenchmarking of German AirportsGAPScientific PartnersContact
The Research ProjectParticipants: Joint Research Project of the Universities of Applied Sciences in Bad Honnef, Berlin and BremenFunding and Duration: Funded by the Federal Ministry of Education and Research from 2005 to 2008Topic: Benchmarking Study to investigate the Economic Performance of German AirportsPurpose: Results of the study are for Internal Use (and participating airports) rather than for Commercial Purposes1. Introduction
Why German Airports?Changing Institutional StructureFrom Public Utilities to partially Privatized AirportsNew Strategies & Organizational StructuresIncentive versus Low Powered Cost-Plus Regulation Increasing CompetitionBad Performance of German Airports in ATRS and TRL Studies2. Benchmarking of German Airports
ATRS versus TRL ILabor ProductivitySource: ATRS 2003, TRL 20032. Benchmarking of German Airports
Labour Productivity
1938720898
1732317543
1598517702
5845.982694684814126
5837.3151308305DUS
4909HAM
451413363
3479CGN
3128.23650650526276
Berlin Airport Group8653
1411914092.1666666667
4264026037
8658653755
ATRS 2001
TRL 2001
Pax/Employee
LP
Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001
CGN3,479n/aAMS19,38720,898
DUS5,837n/aLGW17,32317,543
FRA3,1286,276LHR15,98517,702
HAM4,909n/aMUC5,84614,126
MUC5,84614,126DUS5,837
Berlin Airport Groupn/a8,653HAM4,909
LHR15,98517,702VIE4,51413,363
LGW17,32317,543CGN3,479
VIE4,51413,363FRA3,1286,276
Avg. Europe14,11914,092Berlin Airport Group8,653
Best Practice Europe42,64026,037Avg. Europe14,11914,092
Best Practice Non-Europe86,58653,755Best Practice Europe42,64026,037
MADAENABest Practice Non-Europe86,58653,755
ATLYVCMADAENA
ATLYVC
TRL 2000
ATRS 200026,241ARN
ARN26,35223,531AMS
OSL22,95522,627ZRH
ZRH22,24922,447OSL
AMS20,27019,066LHR
LGW17,81418,092LGW
LHR17,00218,032MUC
GVA16,00817,979GVA
CPH12,61714,632VIE
MAN7,06713,174CPH
MUC5,71410,692MAN
VIE4,8798,050FRA
FRA3,459
Labour Costs per Pax
12.76.570432
10.84.815828
Berlin Airport Group4.741164
73.148332
6.5DUS
63.383046
4.83.174216
4.05HAM
5.53.51543
0.80.983076
0.450.572424
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LC
Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aFRA$12.70$6.57
DUS$6.50n/aVIE$10.80$4.82
FRA$12.70$6.57Berlin Airport Group$4.74
HAM$4.05n/aMUC$7.00$3.15
MUC$7.00$3.15DUS$6.50
Berlin Airport Groupn/a$4.74LHR$6.00$3.38
LHR$6.00$3.38LGW$4.80$3.17
LGW$4.80$3.17HAM$4.05
VIE$10.80$4.82Avg. Europe$5.50$3.52
Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98
Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57
Best Practice Non-Europe$0.45$0.57MAD, BCNAENA
MAD, BCNAENACLT, ATLATL
CLT, ATLATL
Staff Cost Level
73899
64624.7
60098.5
56953
56152.5
51837.5
50995.3
45254.58
87730.2
81651
Source: ATRS 2005
2003
SCL
Staff Cost Level
ATRS
2003
LHR$73,899
LGW$64,625
HAM$60,099
VIE$56,953
Berlin Airport Group$56,153
CGN$51,838
MUC$50,995
Fraport$45,255
Avg. Europe$87,730
Avg. North America$81,651
Labour Cost Share
0.680.634
0.580.734
0.51DUS
Berlin Airport Group0.503
0.450.427
0.350.329
0.350.347
0.28HAM
0.440.4485416667
0.680.734
0.230.163
0.590.52
0.070.173
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LCS
Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aVIE68%63.4%
DUS51%n/aFRA58%73.4%
FRA58%73.4%DUS51%
HAM28%n/aBerlin Airport Group50.3%
MUC45%42.7%MUC45%42.7%
Berlin Airport Groupn/a50.3%LHR35%32.9%
LHR35%32.9%LGW35%34.7%
LGW35%34.7%HAM28%
VIE68%63.4%Avg. Europe44%44.9%
Avg. Europe44%44.9%Highest Share Europe68%73.4%
Highest Share Europe68%73.4%Lowest Share Europe23%16.3%
Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%
Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%
Lowest Share Non-Europe7%17.3%VIEFRA
VIEFRAAMSATH
AMSATHDFWSFO
DFWSFOKIXYVC
KIXYVC
Cost Structure
0.480.260.0800.820.181
0.450.1800.160.780.221
0.390.240.050.080.760.241
0.310.230.060.230.840.161
0.30.180.10.170.760.241
0.290.210.110.010.620.381
0.280.240.060.110.690.311
0.370.180.060.110.720.281
Source: Doganis 1995
Staff Costs
Services, Equipment & Supplies
Maintenance
Other
Total Operating Costs
Capital Charges
Total Costs
CS
Doganis
Cost Structures
Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs
VIE48%26%8%*82%18%100%
FRA45%18%*16%78%22%100%
DUS39%24%5%8%76%24%100%
LHR31%23%6%23%84%16%100%
LGW30%18%10%17%76%24%100%
MAD29%21%11%1%62%38%100%
AMS28%24%6%11%69%31%100%
Avg.37%18%6%11%72%28%100%
* included in other cost items
op Exp per Pax
21.83542518.11846416.814059
20.0057918.40467620.306515
8.34687510.2289688.307812
6.473736.891396.780014
5.429584.7195585.694098
5.3878145.9586165.819396
5.220755.2346725.98646
3.0048752.7750124.193593
2.227522.6591022.143988
4.3454799135.09197155.21900975
1.8933922.1161442.143988
1.183370.7239440.710022
Source: TRL 2002, 2003, 2004
TRL 2000
TRL 2001
TRL 2002
OE
Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002
FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81
MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31
Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31
LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78
LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69
VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82
NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99
KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19
3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14
Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22
Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14
Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71
3rdHKGATHMAN
AENAFraport
MelbourneAtlanta
TE-SE ATM
11
10.909
11
11
10.942
10.506
11
11
10.983
0.8190.689
0.8040.767
0.7550.76
0.650.864
0.5180.998
0.5160.883
0.5040.275
0.8478750.8485
Source: Pels 2003
TE 1997
SE 1997
TE-SE Pax
10.507
11
11
11
0.9860.988
0.9541
0.9230.836
0.9170.494
0.8090.998
0.7980.911
0.7881
0.7570.994
0.6950.991
0.6871
0.6740.928
0.6431
0.85193750.9154375
Source: Pels 2003
TE 1997
SE 1997
TE-SE
Technical and Scale Efficiency PAX and ATM Pels et al (2003)
PAXTE 1997SE 1997ATMTE 1997SE 1997
SXF1.0000.507CPH1.0001.000
BRU1.0001.000FRA1.0000.909
CPH1.0001.000LGW1.0001.000
LHR1.0001.000LHR1.0001.000
ZRH0.9860.988MUC1.0000.942
LGW0.9541.000NUE1.0000.506
STU0.9230.836CDG1.0001.000
NUE0.9170.494STU1.0001.000
FRA0.8090.998ZRH1.0000.983
VIE0.7980.911HAJ0.8190.689
AMS0.7881.000AMS0.8040.767
MUC0.7570.994BRU0.7550.760
CDG0.6950.991HAM0.6500.864
TXL0.6871.000VIE0.5180.998
HAJ0.6740.928TXL0.5160.883
HAM0.6431.000SXF0.5040.275
avg.0.8520.915avg.0.8480.849
&R&D, &T
Tabelle6
Tabelle7
ATRS versus TRL IIILabor Productivity Ranking DifferencesSource: ATRS 2003 TRL 20022. Benchmarking of German Airports
Labour Productivity
1732317543
1598517702
5845.982694684814126
5837.3151308305DUS
4909HAM
451413363
3479CGN
Berlin Airport Group8653
3128.23650650526276
1411914092.1666666667
4264026037
8658653755
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
Pax/Employee
LP
Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001
CGN3,479n/aLGW17,32317,543
DUS5,837n/aLHR15,98517,702
FRA3,1286,276MUC5,84614,126
HAM4,909n/aDUS5,837
MUC5,84614,126HAM4,909
Berlin Airport Groupn/a8,653VIE4,51413,363
LHR15,98517,702CGN3,479
LGW17,32317,543Berlin Airport Group8,653
VIE4,51413,363FRA3,1286,276
Avg. Europe14,11914,092Avg. Europe14,11914,092
Best Practice Europe42,64026,037Best Practice Europe42,64026,037
Best Practice Non-Europe86,58653,755Best Practice Non-Europe86,58653,755
MADAENAMADAENA
ATLYVCATLYVC
ATRS 2000TRL 2000
ARN26,35226,241ARN
OSL22,95523,531AMS
ZRH22,24922,627ZRH
AMS20,27022,447OSL
LGW17,81419,066LHR
LHR17,00218,092LGW
GVA16,00818,032MUC
CPH12,61717,979GVA
MAN7,06714,632VIE
MUC5,71413,174CPH
VIE4,87910,692MAN
FRA3,4598,050FRA
Labour Costs per Pax
12.76.570432
10.84.815828
Berlin Airport Group4.741164
73.148332
6.5DUS
63.383046
4.83.174216
4.05HAM
5.53.51543
0.80.983076
0.450.572424
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LC
Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aFRA$12.70$6.57
DUS$6.50n/aVIE$10.80$4.82
FRA$12.70$6.57Berlin Airport Group$4.74
HAM$4.05n/aMUC$7.00$3.15
MUC$7.00$3.15DUS$6.50
Berlin Airport Groupn/a$4.74LHR$6.00$3.38
LHR$6.00$3.38LGW$4.80$3.17
LGW$4.80$3.17HAM$4.05
VIE$10.80$4.82Avg. Europe$5.50$3.52
Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98
Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57
Best Practice Non-Europe$0.45$0.57MAD, BCNAENA
MAD, BCNAENACLT, ATLATL
CLT, ATLATL
Staff Cost Level
73899
64624.7
60098.5
56953
56152.5
51837.5
50995.3
45254.58
87730.2
81651
Source: ATRS 2005
2003
SCL
Staff Cost Level
ATRS
2003
LHR$73,899
LGW$64,625
HAM$60,099
VIE$56,953
Berlin Airport Group$56,153
CGN$51,838
MUC$50,995
Fraport$45,255
Avg. Europe$87,730
Avg. North America$81,651
Labour Cost Share
0.680.634
0.580.734
0.51DUS
Berlin Airport Group0.503
0.450.427
0.350.329
0.350.347
0.28HAM
0.440.4485416667
0.680.734
0.230.163
0.590.52
0.070.173
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LCS
Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aVIE68%63.4%
DUS51%n/aFRA58%73.4%
FRA58%73.4%DUS51%
HAM28%n/aBerlin Airport Group50.3%
MUC45%42.7%MUC45%42.7%
Berlin Airport Groupn/a50.3%LHR35%32.9%
LHR35%32.9%LGW35%34.7%
LGW35%34.7%HAM28%
VIE68%63.4%Avg. Europe44%44.9%
Avg. Europe44%44.9%Highest Share Europe68%73.4%
Highest Share Europe68%73.4%Lowest Share Europe23%16.3%
Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%
Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%
Lowest Share Non-Europe7%17.3%VIEFRA
VIEFRAAMSATH
AMSATHDFWSFO
DFWSFOKIXYVC
KIXYVC
Cost Structure
0.480.260.0800.820.181
0.450.1800.160.780.221
0.390.240.050.080.760.241
0.310.230.060.230.840.161
0.30.180.10.170.760.241
0.290.210.110.010.620.381
0.280.240.060.110.690.311
0.370.180.060.110.720.281
Source: Doganis 1995
Staff Costs
Services, Equipment & Supplies
Maintenance
Other
Total Operating Costs
Capital Charges
Total Costs
CS
Doganis
Cost Structures
Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs
VIE48%26%8%*82%18%100%
FRA45%18%*16%78%22%100%
DUS39%24%5%8%76%24%100%
LHR31%23%6%23%84%16%100%
LGW30%18%10%17%76%24%100%
MAD29%21%11%1%62%38%100%
AMS28%24%6%11%69%31%100%
Avg.37%18%6%11%72%28%100%
* included in other cost items
op Exp per Pax
21.83542518.11846416.814059
20.0057918.40467620.306515
8.34687510.2289688.307812
6.473736.891396.780014
5.429584.7195585.694098
5.3878145.9586165.819396
5.220755.2346725.98646
3.0048752.7750124.193593
2.227522.6591022.143988
4.3454799135.09197155.21900975
1.8933922.1161442.143988
1.183370.7239440.710022
Source: TRL 2002, 2003, 2004
TRL 2000
TRL 2001
TRL 2002
OE
Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002
FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81
MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31
Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31
LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78
LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69
VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82
NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99
KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19
3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14
Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22
Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14
Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71
3rdHKGATHMAN
AENAFraport
MelbourneAtlanta
TE-SE ATM
11
10.909
11
11
10.942
10.506
11
11
10.983
0.8190.689
0.8040.767
0.7550.76
0.650.864
0.5180.998
0.5160.883
0.5040.275
0.8478750.8485
Source: Pels 2003
TE 1997
SE 1997
TE-SE Pax
10.507
11
11
11
0.9860.988
0.9541
0.9230.836
0.9170.494
0.8090.998
0.7980.911
0.7881
0.7570.994
0.6950.991
0.6871
0.6740.928
0.6431
0.85193750.9154375
Source: Pels 2003
TE 1997
SE 1997
TE-SE
Technical and Scale Efficiency PAX and ATM Pels et al (2003)
PAXTE 1997SE 1997ATMTE 1997SE 1997
SXF1.0000.507CPH1.0001.000
BRU1.0001.000FRA1.0000.909
CPH1.0001.000LGW1.0001.000
LHR1.0001.000LHR1.0001.000
ZRH0.9860.988MUC1.0000.942
LGW0.9541.000NUE1.0000.506
STU0.9230.836CDG1.0001.000
NUE0.9170.494STU1.0001.000
FRA0.8090.998ZRH1.0000.983
VIE0.7980.911HAJ0.8190.689
AMS0.7881.000AMS0.8040.767
MUC0.7570.994BRU0.7550.760
CDG0.6950.991HAM0.6500.864
TXL0.6871.000VIE0.5180.998
HAJ0.6740.928TXL0.5160.883
HAM0.6431.000SXF0.5040.275
avg.0.8520.915avg.0.8480.849
&R&D, &T
Tabelle6
Tabelle7
ATRS versus TRL IIChange in Labor ProductivitySource: ATRS 2003, 2005 TRL 2001, 20022. Benchmarking of German Airports
Diagramm3
694118032
34794147
490912265
Changes
MUC (TRL 99/00)6,94118,032
CGN (ATRS 01/03)3,4794,147
HAM (ATRS 01/03)4,90912,265
Labour Productivity
1732317543
1598517702
5845.982694684814126
5837.3151308305DUS
4909HAM
451413363
3479CGN
Berlin Airport Group8653
3128.23650650526276
1411914092.1666666667
4264026037
8658653755
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
Pax/Employee
LP
Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001
CGN3,479n/aLGW17,32317,543
DUS5,837n/aLHR15,98517,702
FRA3,1286,276MUC5,84614,126
HAM4,909n/aDUS5,837
MUC5,84614,126HAM4,909
Berlin Airport Groupn/a8,653VIE4,51413,363
LHR15,98517,702CGN3,479
LGW17,32317,543Berlin Airport Group8,653
VIE4,51413,363FRA3,1286,276
Avg. Europe14,11914,092Avg. Europe14,11914,092
Best Practice Europe42,64026,037Best Practice Europe42,64026,037
Best Practice Non-Europe86,58653,755Best Practice Non-Europe86,58653,755
MADAENAMADAENA
ATLYVCATLYVC
ATRS 2000TRL 2000
ARN26,35226,241ARN
OSL22,95523,531AMS
ZRH22,24922,627ZRH
AMS20,27022,447OSL
LGW17,81419,066LHR
LHR17,00218,092LGW
GVA16,00818,032MUC
CPH12,61717,979GVA
MAN7,06714,632VIE
MUC5,71413,174CPH
VIE4,87910,692MAN
FRA3,4598,050FRA
Labour Costs per Pax
12.76.570432
10.84.815828
Berlin Airport Group4.741164
73.148332
6.5DUS
63.383046
4.83.174216
4.05HAM
5.53.51543
0.80.983076
0.450.572424
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LC
Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aFRA$12.70$6.57
DUS$6.50n/aVIE$10.80$4.82
FRA$12.70$6.57Berlin Airport Group$4.74
HAM$4.05n/aMUC$7.00$3.15
MUC$7.00$3.15DUS$6.50
Berlin Airport Groupn/a$4.74LHR$6.00$3.38
LHR$6.00$3.38LGW$4.80$3.17
LGW$4.80$3.17HAM$4.05
VIE$10.80$4.82Avg. Europe$5.50$3.52
Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98
Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57
Best Practice Non-Europe$0.45$0.57MAD, BCNAENA
MAD, BCNAENACLT, ATLATL
CLT, ATLATL
Staff Cost Level
73899
64624.7
60098.5
56953
56152.5
51837.5
50995.3
45254.58
87730.2
81651
Source: ATRS 2005
2003
SCL
Staff Cost Level
ATRS
2003
LHR$73,899
LGW$64,625
HAM$60,099
VIE$56,953
Berlin Airport Group$56,153
CGN$51,838
MUC$50,995
Fraport$45,255
Avg. Europe$87,730
Avg. North America$81,651
Labour Cost Share
0.680.634
0.580.734
0.51DUS
Berlin Airport Group0.503
0.450.427
0.350.329
0.350.347
0.28HAM
0.440.4485416667
0.680.734
0.230.163
0.590.52
0.070.173
Source: ATRS 2003, TRL 2003
ATRS 2001
TRL 2001
LCS
Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001
CGNn/an/aVIE68%63.4%
DUS51%n/aFRA58%73.4%
FRA58%73.4%DUS51%
HAM28%n/aBerlin Airport Group50.3%
MUC45%42.7%MUC45%42.7%
Berlin Airport Groupn/a50.3%LHR35%32.9%
LHR35%32.9%LGW35%34.7%
LGW35%34.7%HAM28%
VIE68%63.4%Avg. Europe44%44.9%
Avg. Europe44%44.9%Highest Share Europe68%73.4%
Highest Share Europe68%73.4%Lowest Share Europe23%16.3%
Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%
Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%
Lowest Share Non-Europe7%17.3%VIEFRA
VIEFRAAMSATH
AMSATHDFWSFO
DFWSFOKIXYVC
KIXYVC
Cost Structure
0.480.260.0800.820.181
0.450.1800.160.780.221
0.390.240.050.080.760.241
0.310.230.060.230.840.161
0.30.180.10.170.760.241
0.290.210.110.010.620.381
0.280.240.060.110.690.311
0.370.180.060.110.720.281
Source: Doganis 1995
Staff Costs
Services, Equipment & Supplies
Maintenance
Other
Total Operating Costs
Capital Charges
Total Costs
CS
Doganis
Cost Structures
Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs
VIE48%26%8%*82%18%100%
FRA45%18%*16%78%22%100%
DUS39%24%5%8%76%24%100%
LHR31%23%6%23%84%16%100%
LGW30%18%10%17%76%24%100%
MAD29%21%11%1%62%38%100%
AMS28%24%6%11%69%31%100%
Avg.37%18%6%11%72%28%100%
* included in other cost items
op Exp per Pax
21.83542518.11846416.814059
20.0057918.40467620.306515
8.34687510.2289688.307812
6.473736.891396.780014
5.429584.7195585.694098
5.3878145.9586165.819396
5.220755.2346725.98646
3.0048752.7750124.193593
2.227522.6591022.143988
4.3454799135.09197155.21900975
1.8933922.1161442.143988
1.183370.7239440.710022
Source: TRL 2002, 2003, 2004
TRL 2000
TRL 2001
TRL 2002
OE
Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002
FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81
MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31
Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31
LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78
LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69
VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82
NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99
KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19
3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14
Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22
Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14
Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71
3rdHKGATHMAN
AENAFraport
MelbourneAtlanta
TE-SE ATM
11
10.909
11
11
10.942
10.506
11
11
10.983
0.8190.689
0.8040.767
0.7550.76
0.650.864
0.5180.998
0.5160.883
0.5040.275
0.8478750.8485
Source: Pels 2003
TE 1997
SE 1997
TE-SE Pax
10.507
11
11
11
0.9860.988
0.9541
0.9230.836
0.9170.494
0.8090.998
0.7980.911
0.7881
0.7570.994
0.6950.991
0.6871
0.6740.928
0.6431
0.85193750.9154375
Source: Pels et al 2003
TE 1997
SE 1997
TE-SE
Technical and Scale Efficiency PAX and ATM Pels et al (2003)
PAXTE 1997SE 1997ATMTE 1997SE 1997
SXF1.0000.507CPH1.0001.000
BRU1.0001.000FRA1.0000.909
CPH1.0001.000LGW1.0001.000
LHR1.0001.000LHR1.0001.000
ZRH0.9860.988MUC1.0000.942
LGW0.9541.000NUE1.0000.506
STU0.9230.836CDG1.0001.000
NUE0.9170.494STU1.0001.000
FRA0.8090.998ZRH1.0000.983
VIE0.7980.911HAJ0.8190.689
AMS0.7881.000AMS0.8040.767
MUC0.7570.994BRU0.7550.760
CDG0.6950.991HAM0.6500.864
TXL0.6871.000VIE0.5180.998
HAJ0.6740.928TXL0.5160.883
HAM0.6431.000SXF0.5040.275
avg.0.8520.915avg.0.8480.849
&R&D, &T
Tabelle6
Tabelle7
Methods of ATRS and TRL2. Benchmarking of German Airports
Method of GAPData CollectionData AdjustmentPartial Processes (disaggregated data)Total Productivity(aggregated)Efficiency Analysis(technical, allocative)Cluster AnalysesSensitivity AnalysesCause AnalysesProductivity and Efficiency MeasurementFurther Analyses3. GAP
Cause AnalysesLow Degree of OutsourcingDiseconomies of Scale for large AirportsEconomies of ScopeProduct Differentiation and StrategiesVertical Integration3. GAP
Questions addressed I3. GAPGAP
Questions addressed II3. GAPFactorsthat can influence the AirportsPerformance
Benefits for AirportsIn Depth Study on the Causes of Performance Differences Learn Strength and Weaknesses of Performance Measurement MethodsCustomized Benchmarks of Partial Processes with Disaggregated DataDiscussion with Leading Experts in Benchmarking and Airport ManagementIdentify and adapt Best PracticesObjective Information on the Effects of Privatization, Regulation and Environment3. GAP
Cooperation with AirportsWorking Group of Participating Airports to discuss Validity of Data, Methods, Results and Differences in PerformanceBenchmarking of Partial Processes demanded by Participating AirportsParticipation in Workshop Series on Benchmarking of the German Aviation Research Society (GARS)3. GAP
Work StepsStart 01.06.2005Airport SelectionIntensive Field Work at the Airportsand Data Collection (at airports, association, etc.)Data AdjustmentsAnalysis and InterpretationEnd 29.02.2008 (option of extension)Presentation of Progress (anonymized results) at GARS3. GAP
International PartnersYVR, University of British Columbia: Prof. David Gillen und Prof. Tae OumLON, Transport Research Laboratory: Peter Mackenzie-WilliamsLON, University of Westminster: Dr. Anne GrahamMEL, Monash University: Prof. Peter ForsythAMS, University of Amsterdam: Prof. Jaap de WitCGN, RWTH Aachen + DLR: Prof. Johannes ReichmuthKEL, IfW an der Universitt Kiel: Dr. Hartmut WolfBER/DRS, TU Dresden + DIW: Prof. Christian von Hirschhausen4. Scientific Partner
For Further QuestionsHochschule BremenProf. Dr. Hans-Martin Niemeier (Coordinator)Werderstr.73D-28199 BremenTel.: +49 (0)40 811 93 [email protected]: +49 (0)421 5905-4815
Fachhochschule fr Wirtschaft BerlinProf. Dr. Jrgen MllerBadensche Str. 50-51D-10825 BerlinTel.: +49 (0)30 857 [email protected]: +49 (0)30 857 89-199 Internationale Fachhochschule Bad HonnefProf. Dr. Hansjochen EhmerMlheimer Str. 38D-53604 Bad HonnefTel.: +49 (0)2203 601-21 [email protected]: +49 (0)2203 601-23 775. Contact
orHochschule BremenDiplom-Volksw. (FH) Vanessa KampWerderstr.73D-28199 BremenTel.: +49 (0)421 [email protected]: +49 (0)421 5905-4599
Website: www.gap-projekt.de5. Contact
Thank you very muchfor yourattention!
Hans-MartinHans-MartinHans-MartinVanessaVanessaVanessaVanessa VanessaJMJMJM, HJ (ab externe Faktoren oder Umwelteinflsse)HJHJHJHJHJHJ