Outline. Introduction Benchmarking of German Airports GAP Scientific Partners Contact. 1. Introduction. The Research Project. Participants: Joint Research Project of the Universities of Applied Sciences in Bad Honnef, Berlin and Bremen - PowerPoint PPT Presentation

Citation preview

  • OutlineIntroductionBenchmarking of German AirportsGAPScientific PartnersContact

  • The Research ProjectParticipants: Joint Research Project of the Universities of Applied Sciences in Bad Honnef, Berlin and BremenFunding and Duration: Funded by the Federal Ministry of Education and Research from 2005 to 2008Topic: Benchmarking Study to investigate the Economic Performance of German AirportsPurpose: Results of the study are for Internal Use (and participating airports) rather than for Commercial Purposes1. Introduction

  • Why German Airports?Changing Institutional StructureFrom Public Utilities to partially Privatized AirportsNew Strategies & Organizational StructuresIncentive versus Low Powered Cost-Plus Regulation Increasing CompetitionBad Performance of German Airports in ATRS and TRL Studies2. Benchmarking of German Airports

  • ATRS versus TRL ILabor ProductivitySource: ATRS 2003, TRL 20032. Benchmarking of German Airports

    Labour Productivity

    1938720898

    1732317543

    1598517702

    5845.982694684814126

    5837.3151308305DUS

    4909HAM

    451413363

    3479CGN

    3128.23650650526276

    Berlin Airport Group8653

    1411914092.1666666667

    4264026037

    8658653755

    ATRS 2001

    TRL 2001

    Pax/Employee

    LP

    Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001

    CGN3,479n/aAMS19,38720,898

    DUS5,837n/aLGW17,32317,543

    FRA3,1286,276LHR15,98517,702

    HAM4,909n/aMUC5,84614,126

    MUC5,84614,126DUS5,837

    Berlin Airport Groupn/a8,653HAM4,909

    LHR15,98517,702VIE4,51413,363

    LGW17,32317,543CGN3,479

    VIE4,51413,363FRA3,1286,276

    Avg. Europe14,11914,092Berlin Airport Group8,653

    Best Practice Europe42,64026,037Avg. Europe14,11914,092

    Best Practice Non-Europe86,58653,755Best Practice Europe42,64026,037

    MADAENABest Practice Non-Europe86,58653,755

    ATLYVCMADAENA

    ATLYVC

    TRL 2000

    ATRS 200026,241ARN

    ARN26,35223,531AMS

    OSL22,95522,627ZRH

    ZRH22,24922,447OSL

    AMS20,27019,066LHR

    LGW17,81418,092LGW

    LHR17,00218,032MUC

    GVA16,00817,979GVA

    CPH12,61714,632VIE

    MAN7,06713,174CPH

    MUC5,71410,692MAN

    VIE4,8798,050FRA

    FRA3,459

    Labour Costs per Pax

    12.76.570432

    10.84.815828

    Berlin Airport Group4.741164

    73.148332

    6.5DUS

    63.383046

    4.83.174216

    4.05HAM

    5.53.51543

    0.80.983076

    0.450.572424

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LC

    Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aFRA$12.70$6.57

    DUS$6.50n/aVIE$10.80$4.82

    FRA$12.70$6.57Berlin Airport Group$4.74

    HAM$4.05n/aMUC$7.00$3.15

    MUC$7.00$3.15DUS$6.50

    Berlin Airport Groupn/a$4.74LHR$6.00$3.38

    LHR$6.00$3.38LGW$4.80$3.17

    LGW$4.80$3.17HAM$4.05

    VIE$10.80$4.82Avg. Europe$5.50$3.52

    Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98

    Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57

    Best Practice Non-Europe$0.45$0.57MAD, BCNAENA

    MAD, BCNAENACLT, ATLATL

    CLT, ATLATL

    Staff Cost Level

    73899

    64624.7

    60098.5

    56953

    56152.5

    51837.5

    50995.3

    45254.58

    87730.2

    81651

    Source: ATRS 2005

    2003

    SCL

    Staff Cost Level

    ATRS

    2003

    LHR$73,899

    LGW$64,625

    HAM$60,099

    VIE$56,953

    Berlin Airport Group$56,153

    CGN$51,838

    MUC$50,995

    Fraport$45,255

    Avg. Europe$87,730

    Avg. North America$81,651

    Labour Cost Share

    0.680.634

    0.580.734

    0.51DUS

    Berlin Airport Group0.503

    0.450.427

    0.350.329

    0.350.347

    0.28HAM

    0.440.4485416667

    0.680.734

    0.230.163

    0.590.52

    0.070.173

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LCS

    Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aVIE68%63.4%

    DUS51%n/aFRA58%73.4%

    FRA58%73.4%DUS51%

    HAM28%n/aBerlin Airport Group50.3%

    MUC45%42.7%MUC45%42.7%

    Berlin Airport Groupn/a50.3%LHR35%32.9%

    LHR35%32.9%LGW35%34.7%

    LGW35%34.7%HAM28%

    VIE68%63.4%Avg. Europe44%44.9%

    Avg. Europe44%44.9%Highest Share Europe68%73.4%

    Highest Share Europe68%73.4%Lowest Share Europe23%16.3%

    Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%

    Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%

    Lowest Share Non-Europe7%17.3%VIEFRA

    VIEFRAAMSATH

    AMSATHDFWSFO

    DFWSFOKIXYVC

    KIXYVC

    Cost Structure

    0.480.260.0800.820.181

    0.450.1800.160.780.221

    0.390.240.050.080.760.241

    0.310.230.060.230.840.161

    0.30.180.10.170.760.241

    0.290.210.110.010.620.381

    0.280.240.060.110.690.311

    0.370.180.060.110.720.281

    Source: Doganis 1995

    Staff Costs

    Services, Equipment & Supplies

    Maintenance

    Other

    Total Operating Costs

    Capital Charges

    Total Costs

    CS

    Doganis

    Cost Structures

    Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs

    VIE48%26%8%*82%18%100%

    FRA45%18%*16%78%22%100%

    DUS39%24%5%8%76%24%100%

    LHR31%23%6%23%84%16%100%

    LGW30%18%10%17%76%24%100%

    MAD29%21%11%1%62%38%100%

    AMS28%24%6%11%69%31%100%

    Avg.37%18%6%11%72%28%100%

    * included in other cost items

    op Exp per Pax

    21.83542518.11846416.814059

    20.0057918.40467620.306515

    8.34687510.2289688.307812

    6.473736.891396.780014

    5.429584.7195585.694098

    5.3878145.9586165.819396

    5.220755.2346725.98646

    3.0048752.7750124.193593

    2.227522.6591022.143988

    4.3454799135.09197155.21900975

    1.8933922.1161442.143988

    1.183370.7239440.710022

    Source: TRL 2002, 2003, 2004

    TRL 2000

    TRL 2001

    TRL 2002

    OE

    Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002

    FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81

    MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31

    Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31

    LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78

    LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69

    VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82

    NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99

    KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19

    3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14

    Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22

    Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14

    Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71

    3rdHKGATHMAN

    AENAFraport

    MelbourneAtlanta

    TE-SE ATM

    11

    10.909

    11

    11

    10.942

    10.506

    11

    11

    10.983

    0.8190.689

    0.8040.767

    0.7550.76

    0.650.864

    0.5180.998

    0.5160.883

    0.5040.275

    0.8478750.8485

    Source: Pels 2003

    TE 1997

    SE 1997

    TE-SE Pax

    10.507

    11

    11

    11

    0.9860.988

    0.9541

    0.9230.836

    0.9170.494

    0.8090.998

    0.7980.911

    0.7881

    0.7570.994

    0.6950.991

    0.6871

    0.6740.928

    0.6431

    0.85193750.9154375

    Source: Pels 2003

    TE 1997

    SE 1997

    TE-SE

    Technical and Scale Efficiency PAX and ATM Pels et al (2003)

    PAXTE 1997SE 1997ATMTE 1997SE 1997

    SXF1.0000.507CPH1.0001.000

    BRU1.0001.000FRA1.0000.909

    CPH1.0001.000LGW1.0001.000

    LHR1.0001.000LHR1.0001.000

    ZRH0.9860.988MUC1.0000.942

    LGW0.9541.000NUE1.0000.506

    STU0.9230.836CDG1.0001.000

    NUE0.9170.494STU1.0001.000

    FRA0.8090.998ZRH1.0000.983

    VIE0.7980.911HAJ0.8190.689

    AMS0.7881.000AMS0.8040.767

    MUC0.7570.994BRU0.7550.760

    CDG0.6950.991HAM0.6500.864

    TXL0.6871.000VIE0.5180.998

    HAJ0.6740.928TXL0.5160.883

    HAM0.6431.000SXF0.5040.275

    avg.0.8520.915avg.0.8480.849

    &R&D, &T

    Tabelle6

    Tabelle7

  • ATRS versus TRL IIILabor Productivity Ranking DifferencesSource: ATRS 2003 TRL 20022. Benchmarking of German Airports

    Labour Productivity

    1732317543

    1598517702

    5845.982694684814126

    5837.3151308305DUS

    4909HAM

    451413363

    3479CGN

    Berlin Airport Group8653

    3128.23650650526276

    1411914092.1666666667

    4264026037

    8658653755

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    Pax/Employee

    LP

    Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001

    CGN3,479n/aLGW17,32317,543

    DUS5,837n/aLHR15,98517,702

    FRA3,1286,276MUC5,84614,126

    HAM4,909n/aDUS5,837

    MUC5,84614,126HAM4,909

    Berlin Airport Groupn/a8,653VIE4,51413,363

    LHR15,98517,702CGN3,479

    LGW17,32317,543Berlin Airport Group8,653

    VIE4,51413,363FRA3,1286,276

    Avg. Europe14,11914,092Avg. Europe14,11914,092

    Best Practice Europe42,64026,037Best Practice Europe42,64026,037

    Best Practice Non-Europe86,58653,755Best Practice Non-Europe86,58653,755

    MADAENAMADAENA

    ATLYVCATLYVC

    ATRS 2000TRL 2000

    ARN26,35226,241ARN

    OSL22,95523,531AMS

    ZRH22,24922,627ZRH

    AMS20,27022,447OSL

    LGW17,81419,066LHR

    LHR17,00218,092LGW

    GVA16,00818,032MUC

    CPH12,61717,979GVA

    MAN7,06714,632VIE

    MUC5,71413,174CPH

    VIE4,87910,692MAN

    FRA3,4598,050FRA

    Labour Costs per Pax

    12.76.570432

    10.84.815828

    Berlin Airport Group4.741164

    73.148332

    6.5DUS

    63.383046

    4.83.174216

    4.05HAM

    5.53.51543

    0.80.983076

    0.450.572424

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LC

    Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aFRA$12.70$6.57

    DUS$6.50n/aVIE$10.80$4.82

    FRA$12.70$6.57Berlin Airport Group$4.74

    HAM$4.05n/aMUC$7.00$3.15

    MUC$7.00$3.15DUS$6.50

    Berlin Airport Groupn/a$4.74LHR$6.00$3.38

    LHR$6.00$3.38LGW$4.80$3.17

    LGW$4.80$3.17HAM$4.05

    VIE$10.80$4.82Avg. Europe$5.50$3.52

    Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98

    Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57

    Best Practice Non-Europe$0.45$0.57MAD, BCNAENA

    MAD, BCNAENACLT, ATLATL

    CLT, ATLATL

    Staff Cost Level

    73899

    64624.7

    60098.5

    56953

    56152.5

    51837.5

    50995.3

    45254.58

    87730.2

    81651

    Source: ATRS 2005

    2003

    SCL

    Staff Cost Level

    ATRS

    2003

    LHR$73,899

    LGW$64,625

    HAM$60,099

    VIE$56,953

    Berlin Airport Group$56,153

    CGN$51,838

    MUC$50,995

    Fraport$45,255

    Avg. Europe$87,730

    Avg. North America$81,651

    Labour Cost Share

    0.680.634

    0.580.734

    0.51DUS

    Berlin Airport Group0.503

    0.450.427

    0.350.329

    0.350.347

    0.28HAM

    0.440.4485416667

    0.680.734

    0.230.163

    0.590.52

    0.070.173

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LCS

    Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aVIE68%63.4%

    DUS51%n/aFRA58%73.4%

    FRA58%73.4%DUS51%

    HAM28%n/aBerlin Airport Group50.3%

    MUC45%42.7%MUC45%42.7%

    Berlin Airport Groupn/a50.3%LHR35%32.9%

    LHR35%32.9%LGW35%34.7%

    LGW35%34.7%HAM28%

    VIE68%63.4%Avg. Europe44%44.9%

    Avg. Europe44%44.9%Highest Share Europe68%73.4%

    Highest Share Europe68%73.4%Lowest Share Europe23%16.3%

    Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%

    Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%

    Lowest Share Non-Europe7%17.3%VIEFRA

    VIEFRAAMSATH

    AMSATHDFWSFO

    DFWSFOKIXYVC

    KIXYVC

    Cost Structure

    0.480.260.0800.820.181

    0.450.1800.160.780.221

    0.390.240.050.080.760.241

    0.310.230.060.230.840.161

    0.30.180.10.170.760.241

    0.290.210.110.010.620.381

    0.280.240.060.110.690.311

    0.370.180.060.110.720.281

    Source: Doganis 1995

    Staff Costs

    Services, Equipment & Supplies

    Maintenance

    Other

    Total Operating Costs

    Capital Charges

    Total Costs

    CS

    Doganis

    Cost Structures

    Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs

    VIE48%26%8%*82%18%100%

    FRA45%18%*16%78%22%100%

    DUS39%24%5%8%76%24%100%

    LHR31%23%6%23%84%16%100%

    LGW30%18%10%17%76%24%100%

    MAD29%21%11%1%62%38%100%

    AMS28%24%6%11%69%31%100%

    Avg.37%18%6%11%72%28%100%

    * included in other cost items

    op Exp per Pax

    21.83542518.11846416.814059

    20.0057918.40467620.306515

    8.34687510.2289688.307812

    6.473736.891396.780014

    5.429584.7195585.694098

    5.3878145.9586165.819396

    5.220755.2346725.98646

    3.0048752.7750124.193593

    2.227522.6591022.143988

    4.3454799135.09197155.21900975

    1.8933922.1161442.143988

    1.183370.7239440.710022

    Source: TRL 2002, 2003, 2004

    TRL 2000

    TRL 2001

    TRL 2002

    OE

    Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002

    FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81

    MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31

    Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31

    LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78

    LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69

    VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82

    NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99

    KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19

    3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14

    Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22

    Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14

    Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71

    3rdHKGATHMAN

    AENAFraport

    MelbourneAtlanta

    TE-SE ATM

    11

    10.909

    11

    11

    10.942

    10.506

    11

    11

    10.983

    0.8190.689

    0.8040.767

    0.7550.76

    0.650.864

    0.5180.998

    0.5160.883

    0.5040.275

    0.8478750.8485

    Source: Pels 2003

    TE 1997

    SE 1997

    TE-SE Pax

    10.507

    11

    11

    11

    0.9860.988

    0.9541

    0.9230.836

    0.9170.494

    0.8090.998

    0.7980.911

    0.7881

    0.7570.994

    0.6950.991

    0.6871

    0.6740.928

    0.6431

    0.85193750.9154375

    Source: Pels 2003

    TE 1997

    SE 1997

    TE-SE

    Technical and Scale Efficiency PAX and ATM Pels et al (2003)

    PAXTE 1997SE 1997ATMTE 1997SE 1997

    SXF1.0000.507CPH1.0001.000

    BRU1.0001.000FRA1.0000.909

    CPH1.0001.000LGW1.0001.000

    LHR1.0001.000LHR1.0001.000

    ZRH0.9860.988MUC1.0000.942

    LGW0.9541.000NUE1.0000.506

    STU0.9230.836CDG1.0001.000

    NUE0.9170.494STU1.0001.000

    FRA0.8090.998ZRH1.0000.983

    VIE0.7980.911HAJ0.8190.689

    AMS0.7881.000AMS0.8040.767

    MUC0.7570.994BRU0.7550.760

    CDG0.6950.991HAM0.6500.864

    TXL0.6871.000VIE0.5180.998

    HAJ0.6740.928TXL0.5160.883

    HAM0.6431.000SXF0.5040.275

    avg.0.8520.915avg.0.8480.849

    &R&D, &T

    Tabelle6

    Tabelle7

  • ATRS versus TRL IIChange in Labor ProductivitySource: ATRS 2003, 2005 TRL 2001, 20022. Benchmarking of German Airports

    Diagramm3

    694118032

    34794147

    490912265

    Changes

    MUC (TRL 99/00)6,94118,032

    CGN (ATRS 01/03)3,4794,147

    HAM (ATRS 01/03)4,90912,265

    Labour Productivity

    1732317543

    1598517702

    5845.982694684814126

    5837.3151308305DUS

    4909HAM

    451413363

    3479CGN

    Berlin Airport Group8653

    3128.23650650526276

    1411914092.1666666667

    4264026037

    8658653755

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    Pax/Employee

    LP

    Labour ProductivityATRS 2001TRL 2001ATRS 2001TRL 2001

    CGN3,479n/aLGW17,32317,543

    DUS5,837n/aLHR15,98517,702

    FRA3,1286,276MUC5,84614,126

    HAM4,909n/aDUS5,837

    MUC5,84614,126HAM4,909

    Berlin Airport Groupn/a8,653VIE4,51413,363

    LHR15,98517,702CGN3,479

    LGW17,32317,543Berlin Airport Group8,653

    VIE4,51413,363FRA3,1286,276

    Avg. Europe14,11914,092Avg. Europe14,11914,092

    Best Practice Europe42,64026,037Best Practice Europe42,64026,037

    Best Practice Non-Europe86,58653,755Best Practice Non-Europe86,58653,755

    MADAENAMADAENA

    ATLYVCATLYVC

    ATRS 2000TRL 2000

    ARN26,35226,241ARN

    OSL22,95523,531AMS

    ZRH22,24922,627ZRH

    AMS20,27022,447OSL

    LGW17,81419,066LHR

    LHR17,00218,092LGW

    GVA16,00818,032MUC

    CPH12,61717,979GVA

    MAN7,06714,632VIE

    MUC5,71413,174CPH

    VIE4,87910,692MAN

    FRA3,4598,050FRA

    Labour Costs per Pax

    12.76.570432

    10.84.815828

    Berlin Airport Group4.741164

    73.148332

    6.5DUS

    63.383046

    4.83.174216

    4.05HAM

    5.53.51543

    0.80.983076

    0.450.572424

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LC

    Labour Cost per PaxATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aFRA$12.70$6.57

    DUS$6.50n/aVIE$10.80$4.82

    FRA$12.70$6.57Berlin Airport Group$4.74

    HAM$4.05n/aMUC$7.00$3.15

    MUC$7.00$3.15DUS$6.50

    Berlin Airport Groupn/a$4.74LHR$6.00$3.38

    LHR$6.00$3.38LGW$4.80$3.17

    LGW$4.80$3.17HAM$4.05

    VIE$10.80$4.82Avg. Europe$5.50$3.52

    Avg. Europe$5.50$3.52Best Practice Europe$0.80$0.98

    Best Practice Europe$0.80$0.98Best Practice Non-Europe$0.45$0.57

    Best Practice Non-Europe$0.45$0.57MAD, BCNAENA

    MAD, BCNAENACLT, ATLATL

    CLT, ATLATL

    Staff Cost Level

    73899

    64624.7

    60098.5

    56953

    56152.5

    51837.5

    50995.3

    45254.58

    87730.2

    81651

    Source: ATRS 2005

    2003

    SCL

    Staff Cost Level

    ATRS

    2003

    LHR$73,899

    LGW$64,625

    HAM$60,099

    VIE$56,953

    Berlin Airport Group$56,153

    CGN$51,838

    MUC$50,995

    Fraport$45,255

    Avg. Europe$87,730

    Avg. North America$81,651

    Labour Cost Share

    0.680.634

    0.580.734

    0.51DUS

    Berlin Airport Group0.503

    0.450.427

    0.350.329

    0.350.347

    0.28HAM

    0.440.4485416667

    0.680.734

    0.230.163

    0.590.52

    0.070.173

    Source: ATRS 2003, TRL 2003

    ATRS 2001

    TRL 2001

    LCS

    Labour Cost ShareATRS 2001TRL 2001ATRS 2001TRL 2001

    CGNn/an/aVIE68%63.4%

    DUS51%n/aFRA58%73.4%

    FRA58%73.4%DUS51%

    HAM28%n/aBerlin Airport Group50.3%

    MUC45%42.7%MUC45%42.7%

    Berlin Airport Groupn/a50.3%LHR35%32.9%

    LHR35%32.9%LGW35%34.7%

    LGW35%34.7%HAM28%

    VIE68%63.4%Avg. Europe44%44.9%

    Avg. Europe44%44.9%Highest Share Europe68%73.4%

    Highest Share Europe68%73.4%Lowest Share Europe23%16.3%

    Lowest Share Europe23%16.3%Highest Share Non-Europe59%52.0%

    Highest Share Non-Europe59%52.0%Lowest Share Non-Europe7%17.3%

    Lowest Share Non-Europe7%17.3%VIEFRA

    VIEFRAAMSATH

    AMSATHDFWSFO

    DFWSFOKIXYVC

    KIXYVC

    Cost Structure

    0.480.260.0800.820.181

    0.450.1800.160.780.221

    0.390.240.050.080.760.241

    0.310.230.060.230.840.161

    0.30.180.10.170.760.241

    0.290.210.110.010.620.381

    0.280.240.060.110.690.311

    0.370.180.060.110.720.281

    Source: Doganis 1995

    Staff Costs

    Services, Equipment & Supplies

    Maintenance

    Other

    Total Operating Costs

    Capital Charges

    Total Costs

    CS

    Doganis

    Cost Structures

    Staff CostsServices, Equipment & SuppliesMaintenanceOtherTotal Operating CostsCapital ChargesTotal Costs

    VIE48%26%8%*82%18%100%

    FRA45%18%*16%78%22%100%

    DUS39%24%5%8%76%24%100%

    LHR31%23%6%23%84%16%100%

    LGW30%18%10%17%76%24%100%

    MAD29%21%11%1%62%38%100%

    AMS28%24%6%11%69%31%100%

    Avg.37%18%6%11%72%28%100%

    * included in other cost items

    op Exp per Pax

    21.83542518.11846416.814059

    20.0057918.40467620.306515

    8.34687510.2289688.307812

    6.473736.891396.780014

    5.429584.7195585.694098

    5.3878145.9586165.819396

    5.220755.2346725.98646

    3.0048752.7750124.193593

    2.227522.6591022.143988

    4.3454799135.09197155.21900975

    1.8933922.1161442.143988

    1.183370.7239440.710022

    Source: TRL 2002, 2003, 2004

    TRL 2000

    TRL 2001

    TRL 2002

    OE

    Operating Costs per PaxTRL 2000TRL 2001TRL 2002TRL 2000TRL 2001TRL 2002

    FRA$2.23$2.66$2.14NRT$21.84$18.12$16.81

    MUC$5.43$4.72$5.69KIX$20.01$18.40$20.31

    Berlin$5.22$5.23$5.993rd in the Ranking$8.35$10.23$8.31

    LHR$6.47$6.89$6.78LHR$6.47$6.89$6.78

    LGW$5.39$5.96$5.82MUC$5.43$4.72$5.69

    VIE$3.00$2.78$4.19LGW$5.39$5.96$5.82

    NRT$21.84$18.12$16.81Berlin$5.22$5.23$5.99

    KIX$20.01$18.40$20.31VIE$3.00$2.78$4.19

    3rd in the Ranking$8.35$10.23$8.31FRA$2.23$2.66$2.14

    Avg. Europe$4.35$5.09$5.22Avg. Europe$4.35$5.09$5.22

    Best Practice Europe$1.89$2.12$2.14Best Practice Europe$1.89$2.12$2.14

    Best Practice Non-Europe$1.18$0.72$0.71Best Practice Non-Europe$1.18$0.72$0.71

    3rdHKGATHMAN

    AENAFraport

    MelbourneAtlanta

    TE-SE ATM

    11

    10.909

    11

    11

    10.942

    10.506

    11

    11

    10.983

    0.8190.689

    0.8040.767

    0.7550.76

    0.650.864

    0.5180.998

    0.5160.883

    0.5040.275

    0.8478750.8485

    Source: Pels 2003

    TE 1997

    SE 1997

    TE-SE Pax

    10.507

    11

    11

    11

    0.9860.988

    0.9541

    0.9230.836

    0.9170.494

    0.8090.998

    0.7980.911

    0.7881

    0.7570.994

    0.6950.991

    0.6871

    0.6740.928

    0.6431

    0.85193750.9154375

    Source: Pels et al 2003

    TE 1997

    SE 1997

    TE-SE

    Technical and Scale Efficiency PAX and ATM Pels et al (2003)

    PAXTE 1997SE 1997ATMTE 1997SE 1997

    SXF1.0000.507CPH1.0001.000

    BRU1.0001.000FRA1.0000.909

    CPH1.0001.000LGW1.0001.000

    LHR1.0001.000LHR1.0001.000

    ZRH0.9860.988MUC1.0000.942

    LGW0.9541.000NUE1.0000.506

    STU0.9230.836CDG1.0001.000

    NUE0.9170.494STU1.0001.000

    FRA0.8090.998ZRH1.0000.983

    VIE0.7980.911HAJ0.8190.689

    AMS0.7881.000AMS0.8040.767

    MUC0.7570.994BRU0.7550.760

    CDG0.6950.991HAM0.6500.864

    TXL0.6871.000VIE0.5180.998

    HAJ0.6740.928TXL0.5160.883

    HAM0.6431.000SXF0.5040.275

    avg.0.8520.915avg.0.8480.849

    &R&D, &T

    Tabelle6

    Tabelle7

  • Methods of ATRS and TRL2. Benchmarking of German Airports

  • Method of GAPData CollectionData AdjustmentPartial Processes (disaggregated data)Total Productivity(aggregated)Efficiency Analysis(technical, allocative)Cluster AnalysesSensitivity AnalysesCause AnalysesProductivity and Efficiency MeasurementFurther Analyses3. GAP

  • Cause AnalysesLow Degree of OutsourcingDiseconomies of Scale for large AirportsEconomies of ScopeProduct Differentiation and StrategiesVertical Integration3. GAP

  • Questions addressed I3. GAPGAP

  • Questions addressed II3. GAPFactorsthat can influence the AirportsPerformance

  • Benefits for AirportsIn Depth Study on the Causes of Performance Differences Learn Strength and Weaknesses of Performance Measurement MethodsCustomized Benchmarks of Partial Processes with Disaggregated DataDiscussion with Leading Experts in Benchmarking and Airport ManagementIdentify and adapt Best PracticesObjective Information on the Effects of Privatization, Regulation and Environment3. GAP

  • Cooperation with AirportsWorking Group of Participating Airports to discuss Validity of Data, Methods, Results and Differences in PerformanceBenchmarking of Partial Processes demanded by Participating AirportsParticipation in Workshop Series on Benchmarking of the German Aviation Research Society (GARS)3. GAP

  • Work StepsStart 01.06.2005Airport SelectionIntensive Field Work at the Airportsand Data Collection (at airports, association, etc.)Data AdjustmentsAnalysis and InterpretationEnd 29.02.2008 (option of extension)Presentation of Progress (anonymized results) at GARS3. GAP

  • International PartnersYVR, University of British Columbia: Prof. David Gillen und Prof. Tae OumLON, Transport Research Laboratory: Peter Mackenzie-WilliamsLON, University of Westminster: Dr. Anne GrahamMEL, Monash University: Prof. Peter ForsythAMS, University of Amsterdam: Prof. Jaap de WitCGN, RWTH Aachen + DLR: Prof. Johannes ReichmuthKEL, IfW an der Universitt Kiel: Dr. Hartmut WolfBER/DRS, TU Dresden + DIW: Prof. Christian von Hirschhausen4. Scientific Partner

  • For Further QuestionsHochschule BremenProf. Dr. Hans-Martin Niemeier (Coordinator)Werderstr.73D-28199 BremenTel.: +49 (0)40 811 93 [email protected]: +49 (0)421 5905-4815

    Fachhochschule fr Wirtschaft BerlinProf. Dr. Jrgen MllerBadensche Str. 50-51D-10825 BerlinTel.: +49 (0)30 857 [email protected]: +49 (0)30 857 89-199 Internationale Fachhochschule Bad HonnefProf. Dr. Hansjochen EhmerMlheimer Str. 38D-53604 Bad HonnefTel.: +49 (0)2203 601-21 [email protected]: +49 (0)2203 601-23 775. Contact

  • orHochschule BremenDiplom-Volksw. (FH) Vanessa KampWerderstr.73D-28199 BremenTel.: +49 (0)421 [email protected]: +49 (0)421 5905-4599

    Website: www.gap-projekt.de5. Contact

  • Thank you very muchfor yourattention!

    Hans-MartinHans-MartinHans-MartinVanessaVanessaVanessaVanessa VanessaJMJMJM, HJ (ab externe Faktoren oder Umwelteinflsse)HJHJHJHJHJHJ