PROJECT BOOK Over 65 years shaping pathways underground RAILWAY

Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

PROJECT BOOKOver 65 years shaping pathways underground

RAILWAY

Page 2: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

OSSA, founded in 1952, is a leading company in the underground construction sector specializing in four business areas:

Construction, Energy, Mining and Services.

Both in underground excavations by traditional method (NATM) and in tunneling with TBM, OSSA is a solid underground

works partner for important industrial and construction groups internationally. At OSSA we are highly commited to

Quality, Health and Safety, and Environment, and we invest in Research and Development Projects at an international

level. We promote a culture of respect and teamwork among our team.

OSSA has vast recent experience in high speed railway tunnels with over 75 km of high speed rail tunneling projects,

leading the Spanish market in this specialty, and also in underground power plants, having built over fifteen underground

plants with some of the largest underground caverns in the world. As a recent highlight, we have built more than 10 km

of tunnels for the Santiago de Chile Metro.

Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and

Guatemala and is recently focusing its tendering activity in North America, Central America, Asia and Great Britain.

After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and

mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing

health and safety and innovation in all our projects.

PRESENTATION

Page 3: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

SAFETYSafety is OSSA’s main asset from the time when its operations began, demanded by the specialisation required for the works carried out underground.

The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility and the use of explosives means that OSSA’s safety department is the most relevant in the company.

The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the company’s human resources.

Page 4: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

CONSTRUCTION DATA SHEET

Type:

Project photos:

Project:

Owner:

Start: Section:

End: Lenght:STATUS

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

LOCATIONANDADITIONALINFORMATION

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNEL EQUIPMENT

GEOMETRY28 m²

Emergency exits. Variable

Drill and blast excavation and NATM

Variable

Drilling JumboBackhoe excavatorShotcrete machinesLoadersTrucks

Basque Country

Spain

Mondragón, Elorrio, Durango,Amorebieta, Lemoa, Galdakao and Basauri.

25.220.115 €

The works are located on the route of the Vitoria - Bilbao - San Sebastián axis of the high-speed train. The project covers 7 different sections of tunnel where, by the new regulation, it is necessary to build parallel emergency galleries so that there are no more than 1.000 m of tunnel without an emergency exit.

4.771 m. (Galleríes) + 183 m. (Connections)01/2022

10/2019

RAILWAY NEW EMERGENCY EXITS AT THE HIGH SPEED TRAIN LINEVITORIA-BILBAO-SAN SEBASTIÁN. VITORIA-BILBAO

ADIF

Page 5: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Project photos

Type Project

CONSTRUCTION DATA SHEET RAILWAY

STATUSStart: 04/2019

End: 12/2020

STRUCTURE Energency exits

PROVINCE Guipuzcoa

COUNTRY Spain

PLACE Bergara – Astigarraga

LOCATIONANDADDITIONALINFORMATION

The works are located on the Vitoria–Bilbao–San Sebastián axis of the high-speed train. The project in question consists of four different sections of tunnel where, by the new regulations, it is necessary to build new parallel emergency galleries so that there is no more than 1,000 m of tunnel without emergency exit. The work is undertaken with two excavation and support teams and two lining equipment.

GEOMETRYCross section: 20 m²

Lenght: 1,860 m

OVERBURDEN Variable

METHODOF TUNNELING Drill and blast

GEOLOGY ANDGEOTECHNICAL DATA Variable

TUNNEL EQUIPMENT

Drilling jumboLoadersBackhoesTrucksTelehandlersShotcrete machines

BUDGET(EXCLUDING VAT) 10,575,000 €

Owner: E.T.S.

NEW EMERGENCY EXITS AT THE HIGH SPEED TRAIN LINE VITORIA–BILBAO–SAN SEBASTIÁN. BERGARA–ASTIGARRAGA SECTION

Page 6: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Sociedad Estatal de Infraestructuras Terrestres

Start: 01/2010

End: 12/2019STATUS

TunnelsSTRUCTURE

ZamoraPROVINCE

SpainCOUNTRY

Pedralba de la Pradería, Requejo

PLACE

The works consist of the execution of the track bed for the High Speed Madrid-Galicia line, comprising 4.96 km of double track and 1.44 km of single track. The main works carried out were two viaducts: Requejo, with a length of 2.1 km; Los Pedregales, at 1.42 km. In addition the Pedralba de la Pradería Tunnel has been executed in the double-track section, with a length of 1,700 m including the false tunnels (1,580 m of bored tunnel) and an open cross-section of 86 m2. The Requejo Tunnel has also been executed, 2.4 km in length, for single track, with a cross-section of 75 m2, and including the construction of two false tunnels of 20 m each at the entrance and exit and another of 40 m in the middle. The excavation process for the tunnels follows the principles of the the New Austrian Method (NATM). Areas where the terrain is of high resistance have been excavated by drill and blast and those where it is of poorer quality with mechanical excavation.

GEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Schists, slates with intercalations of quartzitesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

132,775,860 €BUDGET(EXCLUDING VAT)

NORTH AND NORTHWEST CORRIDOR OF MADRID-GALICIA HIGH-SPEED LINE.LUBIÁN-ZAMORA SECTION. PEDRALBA PRADERÍA–PADORNELO TUNNEL SUBSECTION

Cross section: Tunnel de Pedralba de la Pradería 86 m2

Tunnel de Requejo 75 m2

Lenght: Tunnel de Pedralba de la Pradería 1,700 m. Tunnel de Requejo 2,400 m.

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 7: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Project photos

High Speed Train TunnelSTRUCTURE

OrensePROVINCE

SpainCOUNTRY

LazaPLACE

The works consist of the completion of the Cerdedelo tunnel, part of the Porticamba-Cerdedelo section of the Galician AVE.

The supports required are generally heavy, based on bolts, trusses, shotcrete and umbrellas. 487 m of tunnel in top heading and 1,028 m of tunnel in benching.

LOCATIONANDADDITIONALINFORMATION

100 mOVERBURDEN

Drilling and blasting / MechanicalMETHODOF TUNNELING

Below average quality slate and ampeliteGEOLOGY ANDGEOTECHNICAL DATA

1 Jumbo XL3C and 1 Jumbo L2C 2 Robot PM 500 1 Normet and 2 Manitous

TUNNEL EQUIPMENT

4,767,424 €BUDGET(EXCLUDING VAT)

Type Project

Owner: UTE LAZA (DRAGADOS-TECSA-COLLOSA-SOGEOSA)

CONSTRUCTION DATA SHEET

Start: 01/2018STATUS

End: 10/2018

TUNNEL COMPLETION, PORTOCAMBA - CERDEDELO SECTION OF MADRID-GALICIA AVE

Tunnel in top heading with 48 m2 section Tunnel in bench with 31 m2 section

GEOMETRY

RAILWAY

Page 8: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

PUEBLA DE SAN JULIÁN BYPASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Lugo

Spain

Puebla de San Julián

77,962,695 €

Medium

Hercinic granodiorite

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Three-boom Jumbo Tamrock Axera. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

Two railway tunnels of 520 and 1,450 m length. High speed railway design. 16 existing cross levels have been removed to improve the safety. Construction of “New Puebla de San Julian Station”. Steel reinforced shotcrete 45 Kg/m³, steel ribs TH - 29/HEB - 160, 4 m long bolts and 25 mm of diameter.

04/2007

07/2018

110 m²

1,970 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 9: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Administración de Infraestructuras Ferroviarias

TRACK BED FOR MADRID–EXTREMADURA–PORTUGUESE BORDER HIGH-SPEED LINE. TALAYUELA–CÁCERES. GRIMALDO–CASAS DE MILLÁN SECTION

Start: 06/2010

End: 07/2018STATUS

TunnelsSTRUCTURE

CáceresPROVINCE

SpainCOUNTRY

Cañaveral, Casas de MillánPLACE

The branch measures a little over 4 miles (6.6 km). The project comprises the construction of two viaducts. The first is over Boquerón Brook and measures 75 m in length, the second is over Campillo Brook and measures 90 m. There is also the construction of the 3,595 m long Santa Marina Tunnel, which includes two cut-and-cover tunnels measuring 215 m and 60 m each. This project also includes earth moving operations, 3 channels, drainage works and replacement of affected services.

Cross section: 100 m²

Length: 3,320 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with hammer

TUNNEL EQUIPMENT

93,951,423 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 10: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

NEW BASQUE-COUNTRY RAIL NETWORK. TOLOSA SECTION

Project photos

Owner: Gobierno Vasco

Start: 12/2009

End: 11/2016STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

TolosaPLACE

Cross section: 85 m²

Lenght: 1,513 m + 1,453 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

69,401,875 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

The above-mentioned works consist of the construction of the track bed for the Tolosa Section, between kilometre points 210+475 and 214+266, corresponding to a length of 3,791 m. The project includes construction of the following elements: two double-track tunnels, tunnel 1 with a length of 1,517 m and tunnel 2 measuring 1,455 m, and also two emergency galleries, gallery 1 being 60 m long and connecting with tunnel 1, and gallery 2, which connects with tunnel 2, being 401 m in length. It also includes 3 artificial tunnels, no. 1 being 507.6 m long and 100 m2 in cross-section and no. 2 and no. 3 measuring 23.9 m and 17.6 m in length respectively, both with a cross-section of 85 m2. In addition, there is a viaduct 108 m in length.Tunnels 1 and 2, with bored lengths of 1,512 m and 1,452 m respectively, have an open cross-section of 85 m2. The tunnels have been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM).The main support elements used both in the tunnels and in the evacuation galleries are: shotcrete, Mn-16 expansion rock bolts, type TH-29 and HEB-160 trusses and 150x150x6 mm steel mesh.

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 11: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

ESPIÑO TUNNEL. LEFT BRANCH

Owner: OHL - Sobrino - Asfaltos Elsan

Project photos

Start: 05/2013

End: 12/2015STATUS

TunnelsSTRUCTURE

OrensePROVINCE

SpainCOUNTRY

A Gudiña, Vilariño de ConsoPLACE

Excavation of the Espiño Tunnel (Left Branch), belonging to the works on the platform of the Madrid-Galicia high-speed north-northwest corridor. The tunnel is 3,500 m long with an excavation section of approximately 70 m2 and a final section of 52 m2. The following support elements have been used during excavation of the tunnel: sprayed concrete, TH-29 and HEB-160 type trusses, MN-16 type expansion bolts, 88.9 mm and 101.6 mm self-drilling and micro-pilot bolts.

Cross section: 52 m²

Lenght: 3,500 mGEOMETRY

Medium-HighOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Siliceous shale, quartzite, Healthy and weathered sandsGEOLOGY ANDGEOTECHNICAL DATA

Three-booms Jumbo Atlas Copco XL3CPutzmesiter PM500 robotManitou MRT 1650Backhoe with pneumatic pick.

TUNNEL EQUIPMENT

9,421,331 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 12: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Ferrovial Agroman, S.A.

Start: 05/2013

End: 12/2015STATUS

TunnelsSTRUCTURE

OrensePROVINCE

SpainCOUNTRY

A Gudiña, Vilariño de ConsoPLACE

Excavation of the Espiño Tunnel (Right Branch), belonging to the works on the platform of the Madrid-Galicia high-speed north-northwest corridor. The tunnel is 3,500 m long with an excavation section of approximately 70 m2 and a final section of 52 m2. The following support elements have been used during excavation of the tunnel: sprayed concrete, TH-29 and HEB-160 type trusses, MN-16 type expansion bolts, 88.9 mm and 101.6 mm self-drilling and micro-pilot bolts.

Cross section: 52 m²

Lenght: 3,500 mGEOMETRY

Medium-HighOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Siliceous shale, quartzite, Healthy and weathered sandsGEOLOGY ANDGEOTECHNICAL DATA

Three-booms Jumbo Atlas Copco XL3CPutzmesiter PM500 robotManitou MRT 1650Backhoe with pneumatic pick.

TUNNEL EQUIPMENT

10,500,115 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET ESPIÑO TUNNEL. RIGHT BRANCH

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 13: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Project photos

Start: 08/2008

End: 06/2015STATUS

TunnelsSTRUCTURE

PontevedraPROVINCE

SpainCOUNTRY

Vilagarcía de Arousa y CatoiraPLACE

Construction of the track bed of the Atlantic High-Speed Rail Axis. The length of the section is 8.35 km. The main works carried out are five tunnels: Quinteiro (1,776.5 m), Outeiro (233 m), Valicovas (1,287.75 m), Abalo (520.5 m) and Pedras Miúdas (56 m).

All the tunnels have been constructed using the New Austrian Method (NATM), by drill and blast in the areas where the material is of high geotechnical quality and with backhoe loaders with hammers in the poor-quality areas. The final cross-section of the tunnels is 85 m2. The Quinteiro tunnel has an emergency gallery with a length of 396 m and a cross-section of 32 m2.

The works also include remodelling the marshalling yard, a 82 m long overpass, five underpasses, thirteen drainage works, four walls and replacement of affected services, roads and rights of way.

Cross section: 85 m²

Lenght: 3,873.75 m. (total)GEOMETRY

MediumOVERBURDEN

NATM. Mechanical excavationMETHODOF TUNNELING

Granites with various degrees of alterationGEOLOGY ANDGEOTECHNICAL DATA

Three-boom jumboShotcrete robotBackhoe loaderTelehandler

TUNNEL EQUIPMENT

114,052,749 €BUDGET(EXCLUDING VAT)

Type Project

Owner: Ministerio de Fomento

CONSTRUCTION DATA SHEET ATLANTIC HIGH-SPEED RAIL AXIS.VILAGARCIA DE AROUSA - CATOIRA SECTION

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 14: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

C824 TUNNEL, HONG KONG

Owner: MTR (Mass Transit Rail Corporation)

Start: 08/2010

End: 12/2013

High speed tunnel

SAR Hong Kong

China

Yuen Long

149,445,693 €

Height

1 underground shaft of 250 m² and 90 m in depth1 underground shaft of 490 m² and 45 m in depthDouble tunnels of 67 m² with 345 m² cavern and bifurcation

Tuffs with quartz veins and sandstone

Shaft excavation with secant piles wall in the upper floor area and drill and blast in the inferior rock area

Atlas Copco XE3CJumbos, L2C, CAT 320 backhoes, PM 500 Robojets,Manitou platforms, GH cranes

Construction of high speed train tunnels. Double tunnels of 2.6 Km each, with a cavern for track changes and two tanks of 90 m and 45 m respectively at the end points of the section.

The tunnel section is of 70 m² per tube.

Excavation is carried out by alternating backhoes with hammers and jumbos. Some measurements: 21,000 m³ of shotcrete, 24,000 m of bolts, such as Swellex MN24, 115t of metallic trusses and 101,000 m³ of reinforced concrete.

Type Project

Project photos

STATUS

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 15: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

URNIETA TUNNEL

Project photos

Owner: UTE Urumea: Dragados-Obras Subterráneas-Comsa-Leza

Start: 11/2012

End: 12/2013STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

UrnietaPLACE

The work involves constructing the Urnieta rail tunnel in the Urnieta-Hernani section of the Basque Country new rail network project. The tunnel is 2,587 m long and has a open cross-section of 85 m2, the excavation method is the New Austrian Method and the construction procedure has been of a conventional type using blast. Two galleries measuring 642.9 m and 417 m with an open cross-section of 41.5 m2 were also constructed. The support elements used in the tunnel and the galleries have been shotcrete, rock bolts and type TH and HEB trusses.

Cross section: 85 m²

Length: 2,157 mGEOMETRY

HighOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Limestones, marls and sandstonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

17,983,414 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 16: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Gobierno Vasco

Start: 12/2010

End: 12/2013STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

UrnietaPLACE

Construction of the platform for the new Basque Country rail network; the section is 5.25 km long. The main work consists of constructing the railway tunnels known as the Urnieta and Hernani tunnels. The support elements employed in the tunnels are of sprayed concrete, Swellex rock bolts, mesh and trusses. Moreover the tunnels are lined with 30 cm of concrete. The budget also includes the construction of two false tunnels 483 m and 185 m long; a 57 m box under the Urumea dual carriageway; two viaducts, one of 163 m over the Uban irrigation channel and the other of 801 m over the river Urumea; and also two underpasses, an overpass and a total of eighteen walls.

LOCATIONANDADDITIONALINFORMATION

Cross section: Urnieta tunnel 85 m2 / Hernani tunnel 95 m2

Length: Urnieta tunnel 2,157 m / Hernani tunnel 769 mGEOMETRY

Medium-HighOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Limestones, marls and sandstonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

115,547,766 €BUDGET(EXCLUDING VAT)

NEW BASQUE-COUNTRY RAIL NETWORK. URNIETA–HERNANI SECTIONCONSTRUCTION DATA SHEET RAILWAY

Page 17: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: UTE Prado-Porto

Start: 10/2012

End: 11/2013STATUS

TunnelsSTRUCTURE

OurensePROVINCE

SpainCOUNTRY

Laza, Villar de BarrioPLACE

Excavation of the parallel tunnels at Corga de Vela, as part of the works for the Madrid-Galicia High-Speed line, each 1,100 m in length, with an excavation cross-section of approximately 70 m2 and a final cross-section of 52 m2. The main support elements used during execution of the tunnel were: sprayed concrete, type TH-29 and HEB-160 trusses, Mn-16 expansion rock bolts and micropiles with a diameter of 88.9 mm and a wall thickness of 7/8 mm.

Cross section: 52 m²

Length: 2 x 1.1 kmGEOMETRY

Medium-HighOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Siliceous shales, quartzites, fresh and meteorite granitesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

10.422.981 €BUDGET(EXCLUDING VAT)

CORGA DE VELA TUNNELSCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 18: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: UTE AVE Grimaldo – Casas de Millán

Start: 04/2011

End: 04/2013STATUS

TunnelsSTRUCTURE

CáceresPROVINCE

SpainCOUNTRY

Cañaveral, Casas de MillánPLACE

The main work consists of the excavation and support of the 3,320 m Santa Marina Tunnel with an excavation cross-section of 140 m2. The main support elements used are: shotcrete, carious types of rock bolts, lattice girders, 150 x 150 x 8 of lath and steel tube micro piles.

Cross section: 100 m²

Length: 3,320 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

34,365,887 €BUDGET(EXCLUDING VAT)

SANTA MARINA TUNNELCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 19: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Administración de Infraestructuras Ferroviarias

Start: 06/2010

End: 03/2013STATUS

TunnelsSTRUCTURE

OurensePROVINCE

SpainCOUNTRY

Baños de MolgasPLACE

The branch measures over 4 miles (6.65 km) in length. The project includes the construction of the following structures: three viaducts, the 177 m Miamán viaduct, the 216 m Bouzas viaduct and a third over the River Arnoia measuring 799 m in length. In addition to construction work also includes earth moving operations, 2 pergolas to salvage the current rail line measuring 57.16 m and 176.9 m each, elevated crossings and subways, drainage works, replacement of affected services.

Cross section: 95 m²

Length: 852 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

64,300,715 €BUDGET(EXCLUDING VAT)

NORTH AND NORTHWEST CORRIDOR OF MADRID–GALICIA HIGH-SPEED LINE.MIAMÁN–PONTE AMBÍA SECTIONCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 20: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: Administración de Infraestructuras Ferroviarias

CONSTRUCTION OF MEDITERRANEAN HIGH SPEED CORRIDOR.MURCIA–ALMERÍA SECTION. BARRANCO DE GAFARILLOS–LOS AREJOS SUBSECTION

Start: 06/2009

End: 12/2012STATUS

TunnelsSTRUCTURE

AlmeríaPROVINCE

SpainCOUNTRY

SorbasPLACE

The branch measures a little over one mile (1.67 km) in length. The project includes the construction of a 434 m viaduct to salvage the double track Almendral Tunnel in Barranco de los Gafarillos, which measures 1,106 m in total, with 786 m underground and 100 m2 in height and width. The project also includes earth moving operations, drainage work, and the replacement of affected services.

Cross section: 100 m²

Length: 786 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marl and marlaceous lime, calcarenites, calcareous holes; black shale with quartzite

GEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

34,269,181 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 21: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Guipuzcoa, Vizcaya

Spain

Mondragón, Elorrio

90,537,027 €

Medium

Marl - limestones interbedded with limestones

Mechanical excavation and drill and blast

Three-boom JumboPutzmeister PM-500 gunning robot with max h. of 30 m3/h. Manitou MRT 1650

03/2009

12/2012

85 m²

3,622 m

Owner: Adif

Construction of the Vitoria-Bilbao-San Sebastian high speed platform.Section: Mondragón – Elorrio.The initial work involved the construction of 2 double-track rail lines, known as the Karraskain and Udalaitz tunnels, measuring 410 and 3,160 m respectively.Both tunnels with a gauge of 85 m².The following works were also carried out in the Project: the levelling of 337 m, two viaducts measuring 713 m in total, the false tunnels at the entrance and exit of the tunnels, and complementary works.The main support elements applied in the tunnels were: 8,235 m³ of fibre-free shotcrete, 12,951 m³ of fibre-reinforced shotcrete, 20,326 units of 4 mm-long bolts, 239 units of TH-29 trusses and 766 units of HEB-140 trusses.The tunnels have also been covered with HM-25 concrete with 40 cm of concrete, and have also been waterproofed by fitting 58,626 m² of 2 mm and 3mm PVC laminate.

BUDGET(EXCLUDING VAT)

VITORIA–BILBAO–SAN SEBASTIÁN HIGH-SPEED LINEMONDRAGÓN – ELORRIO SECTIONCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 22: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: UTE MIAMÁN: San Jose – Obras Subterráneas

Start: 07/2011

End: 07/2012STATUS

TunnelsSTRUCTURE

OurensePROVINCE

SpainCOUNTRY

Baños de MolgasPLACE

The main work consists of the excavation and support of Miamán Tunnel, measuring 852 m and with 95 m2 in height and width.The main support elements used are: shotcrete; rock bolts, TH and HEB type trusses, 150 x 150 x 6 lath and steel tube micro piles.

Cross section: 95 m²

Length: 852 mGEOMETRY

Medium OVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

5,863,261 €BUDGET(EXCLUDING VAT)

MIAMAN TUNNELCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 23: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

TOLOSA TUNNEL

Project photos

Owner: UTE Tolosa

Start: 12/2010

End: 07/2012STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

TolosaPLACE

The main project consists of the excavation and support for two double-track tunnels, tunnel 1 with a length of 1,517.9 m (1,512.9 m bored) and tunnel 2 with a length of 1,455.2 m (1,452.7 m bored), both tunnels having an open cross-section of 85 m2. The tunnel has been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM).

To comply with safety standards two emergency galleries have been constructed. The first gallery is 60 m long and connects with tunnel 1, and the second connects with tunnel 2 and has a length of 401 m.

The main support elements used both in the tunnels and in the evacuation galleries are: shotcrete, Mn-16 expansion rock bolts, type TH-29 and HEB-160 trusses and 150x150x6 mm steel mesh.

Cross section: 85 m²

Lenght: 1,513 m + 1,453 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

16,006,259 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 24: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

NEW BASQUE-COUNTRY RAIL NETWORK. EAST BEASAIN SECTION

Project photos

Owner: ETS (Euskal Trenbide Sarea)

Start: 11/2009

End: 07/2012STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

BeasainPLACE

The above-mentioned works involve constructing the track bed of the East Beasain Section, with a length of 2,158 m. The main tasks carried out are: a 1,955 m tunnel with a final cross-section of 85 m2, and two bridges, 70 m and 106 m long respectively, over the Usurbe and Mariarás rivers.

The tunnel has been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM). The main support elements used are: shotcrete, 25 mm diameter rock bolts, type HEB-180 trusses, 150x150x6 mm mesh, and steel tube micropiles.

Cross section: 85 m²

Lenght: 1,955 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

46,778,437 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 25: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

LA TEMEROSA TUNNEL

Project photos

Owner: Vías y Construcciones

Start: 09/2011

End: 04/2012STATUS

TunnelsSTRUCTURE

AlicantePROVINCE

SpainCOUNTRY

AspePLACE

The above-mentioned works comprised the execution of excavation and supports for a 464 m tunnel with a cross-section of 70 m2, excavated with mechanical excavation and using explosives. The terrain was an alternating mixture of sandstones, marls and conglomerates and the supports used consisted of shotcrete with added metal fibres and metal trusses.

Cross section: 70 m²

Lenght: 464 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Sandstones, conglomerates and gypsumsGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

2,687,958 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 26: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

Owner: UTE Gafarillos

Start: 03/2010

End: 06/2011STATUS

TunnelsSTRUCTURE

AlmeríaPROVINCE

SpainCOUNTRY

SorbasPLACE

The main work consists of the excavation and support of the double track Almedral Tunnel measuring 786 m and 100 m2 in height and width. The main support elements used are: shotcrete, 25 mm diameter rock bolts, TH-29, TH-36 and HEB-180 trusses, 150 x 150 x 6 of lath and steel tube micro piles.

Cross section: 100 m²

Length: 786 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marl and marlaceous lime, calcarenites, calcareous holes; black shale with quartzite

GEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

13,150,000 €BUDGET(EXCLUDING VAT)

EL ALMENDRAL TUNNELCONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 27: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

León

Spain

Cuadros, La Robla, La Pola de Gordón

104,201,195 €

Medium

Sandstones, lutites, slates and limestones

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Jumbo has two booms and service plataform Copco BoomerRipper hammerPutzmeister PM-500 gunning robot with max h. of 30 m3/h.

06/2006

06/2011

120 m²

3,841 m

Owner: Adif

LEÓN–ASTURIAS HIGH-SPEED LINE. LA ROBLA–POLA DE LENA

BUDGET(EXCLUDING VAT)

The works consisted of constructing a track platform 9,440 m in length for the high-speed line in the section between La Robla and the Pajares Tunnels.

The project involved building 3 viaducts with a length of 817 m and 6 double-track tunnels with a total length of 4,204 m. The main part of the work was the tunnels, which are: Castro (493 m), Alba (1,057 m), Peredilla (723 m), Buen Suceso I (697 m), Buen Suceso II (251 m) and Nocedo de Gordón (620 m). The tunnels have cross-sections of 85 and 90 m2. The excavation was carried out using the New Austrian Method. Explosives were used in the geologically favourable areas and mechanical equipment in the more unfavourable areas.

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 28: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

LEÓN–ASTURIAS HIGH-SPEED LINE. PAJARES TUNNELS SECTION. PHASE 2

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

León

Spain

Pola de Gordón

407,790,294 €

High

Limestone of Lancara and Valdetoja Formations

Tunnel Boring Machine

TBM. 10 m diameter. Double shield

05/2004

04/2011

56 m²

7,720 m

Owner: Adif

Work involved the construction of a downhill entrance gallery with a 6.2% slope and 5,466 m in length. Besides the excavation of two parallel tunnels of 4,166 m and 3,189 m in length and 56 m² gauge, a cavern of 107 m in length and 426 m² gauge was undertaken. All these works belong to the León-Asturias high-speed line.Except for the tunnels that were excavated with TBM, the other galleries were drilled & blasted.To cover the parallel tunnels, 600 and 500 mm reinforced-concrete ring segments measuring 1.5 m in length were used, placed on 6+1 rings.Given the nature of the site and the size of the gallery, an in-depth pre-analysis of the site was undertaken.The main works were: 1,072,922 m3 of tunnel excavation, 39,945 m3 of cavern excavation, 79,512 m3 of varying-gauge gallery excavation, 14,365 m³ of steel fibre reinforced concrete, 122,216 ml of 32 mm-diameter bolts, 101,333 ml of 22 m fibreglass bolts, 124,027 ml of Swellex MN12 rockbolts, 3,500 ml of cable bolts, 1,032,700 kg of TH and HEB trusses and 69,115 ml of fibreglass-bolted covers.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 29: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Madrid, Toledo

Spain

Aranjuez, Ontígola

126,460,869 €

Medium

Clays, glauberites and halites (Lower Miocene)

NATM (Top-Heading and Bench). Mechanical excavation

Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/hWIRTH T3.20 roadheader

11/2007

03/2011

100 m²

2,080 m

Owner: Adif

MADRID–VALENCIA HIGH-SPEED LINE.ARANJUEZ-ONTÍGOLA SECTION

Construction of the Madrid-Valencia high speed platform, the section length being 4.7 km The initial work involved the construction of the double-track rail tunnel known as the Tunnel del Regajal.Difficult construction from a geological and geotechnical point of view and because of the high environmental value of the area covered.Certain zones of the tunnel were built using micropile underpinning, double bolt covers and fitting of Gewi bolts.It was also necessary to undertake a water filtration test using epoxy and polyurethane-acrylic resins.The budget also included the following works: the false tunnels of the north and south entrance tunnels, measuring 23 m and 334 respectively.Also a 266 m-long viaduct and 2 overpasses.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 30: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

BEASAIN TUNNEL

Project photos

Owner: UTE Beasain

Start: 06/2010

End: 02/2011STATUS

TunnelsSTRUCTURE

GuipúzcoaPROVINCE

SpainCOUNTRY

Beasain, OrdiziaPLACE

The main project consisted of the excavation and support for the double-track Beasain Tunnel, with a linear length of 1,916 m and an open cross-section of 85 m2. The tunnel has been built by the conventional method, with blasting in areas of sound rock and using a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM). The main support elements used were: shotcrete, 25 mm diameter rock bolts, type HEB-180 trusses, 150x150x6 mm mesh, and steel tube micropiles.

Cross section: 85 m²

Lenght: 1,916 mGEOMETRY

MediumOVERBURDEN

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

METHODOF TUNNELING

Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA

Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer

TUNNEL EQUIPMENT

7,714,920 €BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 31: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

VEGA DE CIEGO TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Asturias

Spain

Pola de Lena

15,763,399 €

Medium

Lumolites, lutites and slates with sandstones and limestones

NATM. Top-Heading and Bench. Drill and blast

Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms). Wet - mix Robojet Putzmeister Sika η = 30 m³/h

04/2008

09/2009

85 m²

2,460 m

Owner: Adif

The work involved the construction of the Vega de Ciego tunnel, part of the León-Asturias high speed line.Section: Campomanes - Pola de Lena

2,366 m of mine were excavated for the tunnel, which also has 94 m of false tunnel.

The initial works are: 7,145 m³ of shotcrete; 40,302 ml of Swellex rockbolts; 9,075 ml of 32 mm-diameter bolts; 789,834 ml of TH-29 and HEB-189 trusses and 3,892 ml of tubular micropile.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 32: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

EL BOSQUE TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cuenca

Spain

Olalla, Arcas del Villar

12,612,867 €

Medium

Carbonates with amount of limestones and marl - limestones

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

High speed Railway tunnel of “L.A.V. stretch: Olalla - Arcas del Villar”.

The design includes 10.6 Km with 184 m long viaduct (not included in budget). 2,912 m of tunnel and 216 m long cut and cover tunnel.

318,157 m³ tunnel excavation, 12,005 m³ shotcrete, 16,919 m steel ribs TH - 29/HEB - 180 and 114,432 m expansive bolts.

06/2007

06/2008

85 m²

3,128 m

Owner: Adif

Atlas Copco XL3CPutzmeister Sika η = 30 m³/hPutzmeister PM-500 gunning robot with max h. of 30 m3/h. Manitou MRT 1650BUDGET

(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 33: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

SIERRA DE ALTOMIRA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cuenca

Spain

Uclés

3,878,069 €

Medium

Limestones

NATM. Top-Heading and Bench. Drill and blast

Three-boom Jumbo Atlas Copco XL3C. Wet - mix Robojet Putzmeister Sika η = 30 m³/h

High speed railway tunnel. Stretch Uclés - Campos del Paraíso.

635.16 m long tunnel and 133.24 m long cut and cover. Construction problems due to the presence of 60 m long and 20 m height cavern.

102,938 m³ tunnel excavation, 5,244 m³ shotcrete, 292,865 Kg of steel ribs TH - 29/HEB - 180 and 24,448 m of expansive bolts.

08/2007

05/2008

147 m²

768 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 34: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

CONTRERAS TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cuenca, Valencia

Spain

Villagordo del Cabriel, Minglanilla

20,633,171 €

Medium

Limestones, limestones with marls and clayly limestones

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Jumbo: Atlas Copco Boomer, Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms with service plataform). Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h

High speed railway tunnels of “L.A.V. Madrid - Castilla la Mancha - Comunidad Valenciana - Region de Murcia. Subtramo: Embalse de Contreras - Villagordo del Cabriel”. Three tunnels: Hoya de la Roda (1,997 m long), Rabo de la Sarten (376 m), Umbría de los Molinos (1,522 m). Three viaducts are 1,640 m total long. The most important is Contreras Viaduct of 587 m long.

10/2006

12/2007

85 - 100 m²

3,890 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 35: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

ATLANTIC HIGH-SPEED RAIL AXIS. QUEIXAS BYPASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

La Coruña

Spain

Ordenes, Tardoia, Cerceda

38,121,954 €

Max. 79 m

Schists and quartz - schists

NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation

Jumbo: Atlas Copco Boomer, Atlas Copco Rocket and Tamrock PARA (Two and Three booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 23 m³/h

The initial work consisted of the construction of the double-track tunnel belonging to the “Eje Atlántico de Alta Velocidad. Variante Queixas (La Coruña)”. Total length of 8,050 m, of which 120 m correspond to two viaducts. Concrete invert in bad geotechnical zones. 2,140 m long tunnel and 40 m long cut and cover construction. 10 - 25 cm thick steel reinforced shotcrete HP - 30 45 Kg/m³, Swelles MN bolts Ø = 24 mm L = 4 m, steel ribs THN - 29/HEB - 160 and 30 cm thick concrete lining HM - 25.

11/2003

11/2007

90 m²

2,180 m

Owner: Dirección General de Ferrocarriles

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 36: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

POUSADOIRO TUNNEL (PORTAS BYPASS II)

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Pontevedra

Spain

Portas

13,813,932 €

70 m

Biotite granodiorite

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Jumbos Atlas Copco Boomer y Atlas Copco Rocket (Two booms and service plataform). Ripper hammer. Wet - mix Robojets Putzmeister Wetkret η = 30 m³/h and Aliva AL - 500 η = 23 m³/h

High speed railway tunnel of “Eje Atlántico de Alta Velocidad”. 70 m long cut and cover in the north portal below 5 m of overburden. 159,003 m³ excavation tunnel, 15,948 m³ shotcrete and 17,447 m² of concrete lining. 11,769 m bolts, 865,921 Kg steel ribs and 3,151 m² of Bernold plate.

09/2004

09/2007

118 m²

2,430 m

Owner: Ministerio de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 37: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

SAN PEDRO TUNNEL. WEST TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Madrid

Spain

Colmenar Viejo, Soto del Real

23,433,925 €

High

Coarse - grained orthogneiss

TBM and NATM. Drill and blast

TBM Herrenknecht, diameter 9.45 - 9.55 m Jumbo Atlas Copco Rocket and Atlas Copco XL3C

Twin tunnels of High Speed Railway Madrid - Segovia - Valladolid. The tunnel boring machine was blocked 470 m from the begining of excavation. The excavation continuated with explosives through a new adit tunnel. 726,325 m³ tunnel excavation. 29,931 m³ shotcrete, 548,692 Kg steel ribs TH - 29 y 50,932 ud. expansive bolts.

06/2005

03/2007

85 m²

8,545 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 38: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

SAN PEDRO TUNNEL. EAST TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Madrid

Spain

Colmenar Viejo, Soto del Real

23,927,382 €

High

Coarse - grained orthogneiss

TBM and NATM. Drill and blast

Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms). Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h

Twin tunnels of High Speed Railway Madrid - Segovia - Valladolid. The south entrance was carried out with a TBM and from the north with explosives, an 800 m long and 80 m2 gauge ramp was excavated and 5,500 m of the tunnel and 85 m² gauge. Connecting galleries between tunnels every 400 m. 74,691 m³ tunnel excavation, 5,343 ud. expansive bolts 4 m length, 153,642 Kg steel ribs TH - 29 and 3,530 m³ shotcrete.

06/2005

03/2007

85 m²

5,000 m

Owner: GIF

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 39: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

EL TENDERO TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Cuenca

Spain

Monteagudo de las Salinas

7,147,168 €

Medium

Limestones, dolomites and green clays (argillites)

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Two-booms Jumbo Atlas Copco Rocket. Wet - mixRobojets Aliva AL - 500 η = 20 m³/h and PutzmeisterSika η = 30 m³/h

High speed railway tunnel of “L.A.V. Madrid - Levante”. Mechanical excavation in tunnel portals, argillites and fault zones. 5 - 20 cm thick shotcrete HM - 30, 4 m long bolts, steel ribs TH - 29/HEB - 160 and 1.1 mm thick Bernold plate.

04/2005

12/2005

157 m²

890 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 40: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

MARTORELL TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Barcelona

Spain

Sant Esteve, Martorell

8,617,153 €

Low

Argillites, lutites and limolites

NATM. Top-Heading and Bench. Mechanical excavation. Drill and blast

Two-booms Jumbo Atlas Copco Rocket. Wet - mixRobojet Aliva AL - 500 η = 23 m³/h and PutzmeisterWetkret η = 30 m³/h

Four high speed rail tunnels to Madrid - Zaragoza - Barcelona - French Border. Tunnels of 152, 797, 120 and 423 m length with 120, 132, 108 and 109 m² cross section respectively. Mainly mechanical excavation with ripper hammer and sometimes with explosives. 10,989 m³ shotcrete, 31,651 ut. expansive bolts L = 4 m, 9,726 m steel ribs HEB - 160, 5,347 m corrugated steel Ø = 32 mm and 872 m² of Bernold plate.

06/2003

12/2004

120 m²

1,492 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 41: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

JÁTIVA TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Valencia

Spain

Játiva, Enova

4,316,347 €

Low

Limestones and marls

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms and service plataform). Wet - mix Robojets Aliva AL-500 η = 23 m³/h and Putzmeister Wetkret η = 30 m³/h

High speed railway tunnel of “L.A.V. Madrid - Levante, stretch Játiva - Enova”.

625 and 600 m long tunnels with cross section variable beetwen 140 to 109 m².

Mainly drill and blast excavation, sometimes with ripper hammer. NATM support system.

12/2003

08/2004

109 - 140 m²

1,225 m

Owner: Adif

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 42: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Pontevedra

Spain

Barro, Portas

77,954,372 €

Medium

Biotite graniodorite

Drill and blast. Mechanical excavation

Jumbos Atlas Copco Boomer, Atlas Copco PARA and Tamrock Axera (Two and three booms and service plataform).WKM-103 Gunning Robot

12/2002

07/2007

80 m²

3,860 m

Owner: Ministerio de Fomento

ATLANTIC HIGH-SPEED RAIL AXIS. PORTAS BYPASS. SECTION I

The main works were carried out in the double track train tunnel called “Lantaño Tunnel” of 3.86 km in length and 80 m² gauge, belonging to the Atlantic Axis High Speed railway. Bypass at Portas (Pontevedra). Section 1; Portela-Portas Platform and track.

Work consisted of the construction of 7.70 km of high speed double track platform, plus an 805 m viaduct, an underpass, two overpasses, laying the track and the corresponding complementary works.

389,998 m³ of tunnel excavation, including 2 false tunnels at the entrance and exit. The tunnel also has an emergency gallery section.

163,535 m³ of H-250 reinforced concrete, with and without fibre, 45,524 m of bolts L= 4-8 m, 1.215,868kg of TH/HEB metallic trusses and 44,171 m² of Bernold metal sheet plating.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 43: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Málaga

Spain

Alora, Pizarra, Cártama

53,311,038 €

250 m

Gneiss composed of angular fragments (breccias)

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Jumbos Atlas Copco Boomer and Tamrock PARA (Two and three booms and service plataform). Ripper hammer. Wet - mix Robojets Meyco and Putzmeister Wetkret η = 20 m³/h

06/2002

03/2005

85 - 110 m²

4,174 m

Owner: Adif

CÓRDOBA–MÁLAGA HIGH-SPEED LINE.ÁLORA–CÁRTAMA SECTION, TEVILLA AND GRIBALMORA TUNNELS

The works involved the execution of two train tunnels the Tevilla and Gibralmora tunnels of 975 m and 3,217 m and 110 and 85 m² respectively. The platform constructed is a 4.45 km in length. Apart from the tunnels, an underpass of 34.25 m was also built, 2 drainage works of 90.35 in total length and the repositioning of services and supplies. The principal support units placed in the tunnels were: 35, 643 m³ of reinforced concrete with fibres, 41,585 m of bolts of Ø = 25 mm and 4 m in length, 198 TH-29 trusses and 153 units of HEB-160, 31,404 m² of wire mesh 100x100x6 mm.

In the less favourable areas of the tunnels, these were excavated with a central buttress and inverted arch and sealed at the front.

Tunnel waterproofing consisted of 163,159 m² of geotextile laminate >300 g/m² of polypropylene fibre and 143,584 m² PVC laminate 1.5- 2 mm H – 250 concrete covering.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 44: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

SAN SEBASTIÁN SOUTH RAIL BYPASS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Guipuzcoa

Spain

San Sebastián

5,862,646 €

Medium

Limestones, sandy limestones, marls and sandstones

NATM. Mechanical excavation

Ripper hammer. Wet - mix Aliva AL - 285 η = 9 - 21 m³/h

Two railway tunnel of “Línea Bilbao - San Sebastián”. Reinforced diaphram walls are designed by the construction of underground station. 12,295 m³ tunnel excavation. Primary support: bolts, steel ribs and shotcrete.

04/1999

03/2005

50 m²

100 m

Owner: Euskotren

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 45: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Segovia

Spain

Tabladillo, Sta. Maria Real Nieva

45,718,770 €

Low

Dolomites and marls

NATM (Top-Heading and Bench). Drill and blast and mechanical excavation

Jumbos Atlas Copco Boomer and Atlas Copco H - 175 (Two and three booms and service plataform). Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h and Aliva AL - 285 η = 9 - 21 m³/h

The main work carried out was the double track train tunnel known as the “Tabladillo Tunnel”, part of the “L.A.V Madrid-Segovia-Valladolid” route.

9,572 m³ steel fibres reinforced shotcrete, 21,758 m bolts, 1,402 m² Bernold plate and 534,723 Kg steel ribs TH29/HEB160. 71,717 m³ concrete lining 30 cm thickness.

Impermeabilization, all around the tunnel, with 29,617 m² polypropylene and 31,260 m² PVC sheet.

10/2001

09/2004

100 m²

2,514 m

Owner: GIF

HIGH-SPEED LINE: NEW RAIL ACCESSES TO NORTH AND NORTHWEST SPAIN.SEGOVIA–VALLADOLID SECTION

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 46: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

CASTEJÓN–MIRANDA DEL EBRO LINE. ELIMINATION OF LEVEL CROSSING

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

La Rioja

Spain

Logroño

11,147,046 €

Medium

Clays, limes and red sandstones

NATM. Mechanical excavation. Full face

Roadheader WESTFALIA. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

12/1999

11/2003

32 m²

982 m

Owner: Dirección General de Ferrocarriles. Mº de Fomento

Removal of El Cortijo level crossing and diversion of the rail line.

The new route is 2.28 km long. The initial work involved the construction of the 982 metre long Cortijo tunnel.

46,201 m³ of full excavation, 25,942 m³ of shotcrete, 46,267 m³ of fibre-reinforced shotcrete.

1,300 m² of 2 mm-thick Bernold sheet, 1,685 units of bolts, 135 units of TH-21 trusses and 49,819 units of HEB-160 trusses.

The budget also includes the execution of the following works: the false tunnels at the entrance and exit of the tunnel with a length of 22 and 15.26 m, each with the same gauge as the Cortijo tunnel. A 38.56 m bridge. Laying of tracks, safety system, signalling, electrification, etc.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 47: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

MADRID–BARCELONA HIGH-SPEED LINE. SUBSECTION VII-B

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Tarragona

Spain

La Nou de Gaiá, Roda de Bará

25,417,611 €

Medium

Marls, sands and sandstones

NATM. Drill and blast. Top-Heading and Bench

Jumbo has three booms Atlas Copco Boomer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h

10/2001

09/2003

95 m²

401 m

Owner: GIF

The main work carried out was that of the double track train tunnel belonging to “L.A.V. Madrid-Barcelona”

Section: Lérida-Martorell. 331 m of tunnel excavated from the mine and 70 m of false tunnel.

The budget includes the execution of 2 overpasses, 3 drainage systems with shotcrete chamber, 2 drainage systems with shotcrete frames. Two underpasses were built with shotcrete chamber and a further two underpasses with shotcrete frames.

Circular tunnel section, 6.66 m interior radius and mass concrete covering. Slope treatment with bolts L=6-8 m, wire mesh and reinforced concrete.

Construction of micropile roof, tie beams and protective umbrella at the entrance. Excavation and tunnel support according to NATM.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 48: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

VALENCIA–TARRAGONA LINE. VANDELLOS–TARRAGONA SECTION. SUBSECTION I.

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Tarragona

Spain

L´Hospitalet de L´Infant, Vandellos

48,104,934 €

15 m

Limestones and dolomites

NATM (Top-Heading and Bench). Drill and blast and mechanical excavation

Jumbos Atlas Copco H - 175 y Tamrock PARA (Three booms and service plataform). Wet - mix Robojet Meyco η = 20 m³/h

Valencia-Tarragona line. Section: Vandellos-Tarragona. Subsection I. Duplication of track and adjustment to 200/220 Km/h.

The initial work was the double track train tunnel known as Rojales Tunnel. This tunnel is 1,750 m long, plus 160 m of false tunnel with a section of 115 m². This section is 19.58 km in length, of which 1,360 m correspond to the execution of 9 viaducts.

During these works, 11 overpasses with a total length of 542 m were constructed plus 2 underpasses and 32 drainage works.

The main tunnel work units were: 8,496 m³ reinforced concrete with steel fibres 45 kg/m³, 29,412m bolts Ø = 25 mm, 388,000 Kg TH - 29/HEB - 160 trusses and 36,905 m³ H – 250 concrete lining.

05/2000

06/2003

115 m²

1,910 m

Owner: Dirección General de Ferrocarriles. Mº de Fomento

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 49: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

LA FUENTECILLA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Segovia

Spain

Segovia

11,077,980 €

Low

Sands, limestones and sandstones

Top-Heading and Bench. Mechanical excavation and drill and blast

Jumbos Atlas Copco Boomer and Atlas Copco Rocket (Two and three booms). Ripper hammer. Wet - mix Robojets Putzmeister Wetkret η = 30 m³/h Aliva AL - 500 η = 23 m³/h

High speed railway tunnel of “L.A.V. Madrid - Segovia - Valladolid”.

12,158 m³ of shotcrete, 66,430 m of 6 m long bolts and 1,253,478 Kg steel ribs HEB. Excavation with alternative side benches.

9,022 m² Bernold plate and 2,053 m² wire mesh 150 x 150 x 6 in sections with bad geotechnical properties.

09/2002

05/2003

140 m²

1,100 m

Owner: GIF

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 50: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

EL VENDRELL TUNNELS

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Tarragona

Spain

El Vendrell

2,944,537 €

Low

Limestones, marls and sands

Drill and blast. Top-Heading and Bench

Jumbos Atlas Copco Boomer and Atlas Copco Rocket (Two booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 23 m³/h

High speed railway twin tunnels to Madrid - Zaragoza - Barcelona - French Border.

404 m length each one, in parallel and separated 24 m.

2,600 m³ of shotcrete, 5,707 m of bolts L = 4 m, 2,120 m steel ribs HEB - 160/TH-29 and 2,525.37 m² wire mesh 150 x 150 x 6 mm.

06/2002

09/2002

90 m²

808 m

Owner: GIF

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 51: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

ARRANOMENDI TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Guipuzcoa

Spain

Deba, Itziar

7,000,000 €

Medium

Limestones and clayly limestones

NATM. Drill and blast. Full face

Jumbo has two booms and service plataform Atlas Copco Boomer. Wet - mix Robojet Meyco η = 18 m³/h and Meyco GM - 090 η = 6 - 7m³/h

Construction of New Arranomendi Tunnel of Bilbao - San Sebastian Line. One railway tunnel.

The stretch is 1,756 m long with 1,199 m long tunnel and 21 m long cut and cover construction. 9,973 ud. Ø = 25 mm and 3 m long bolts, 310 ud. steel ribs TH - 21 and 3,946 m³ shotcrete 5 - 20 cm thickness.

09/1996

07/1998

25 m²

1,220 m

Owner: Euskotren S.A.

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 52: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

FUENTE LA HIGUERA TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Valencia

Spain

Fuente la Higuera

2,345,942 €

50 - 60 m

White marls. Red calcareous conglomerates with clayly matrix in the last 100 m

NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation

Jumbo has two booms Atlas Copco Rocket. Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Sika η = 30 m³/h

Raiway tunnel of Madrid - Valencia Line.

The porpuse of the design was to ensure that decision makers consider the ensuing environmental impacts to decide wether to proceed with the project.

6,796 m³ shotcrete, 3,497 bolt units L = 4 m, 301 units steel ribs HEB - 160/TH21 and 324 m micropile umbrellaØ = 144 mm.

01/1993

12/1993

110 m²

800 m

Owner: Mº de Obras Públicas, Transportes y Medio Ambiente

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 53: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

Type Project

EL GOLOSO TUNNEL

Project photos

STATUSStart:

End:

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

GEOLOGY ANDGEOTECHNICAL DATA

TUNNEL EQUIPMENT

Cross section:

Length:

Tunnels

Madrid

Spain

Tres Cantos

14,601,071 €

20 - 30 m

Coarse grained arcosic sands with boulders and blocks

Premill method. Mechanical excavation

Ripper hammer. Wet - mix Aliva AL - 285 η = 9 - 21 m³/h

Railway tunnel of Madrid - Burgos Line. Construction in curve.

Premill method for tunnel excavation in cohesive soils. Replacement of affected service.

Primary support: shotcrete, bolt and steel ribs. Reinforced concrete piles of 1,000 mm of diameter.

04/1990

02/1992

100 m²

475 m

Owner: Renfe

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

LOCATIONANDADDITIONALINFORMATION

RAILWAY

Page 54: Over 65 years shaping pathways underground PROJET OOK · Putzmeister PM500 Robot Manitou MRT 1650 Backhoe loader with pick hammer TUNNEL EQUIPMENT BUDGET 69,401,875 € (EXCLUDING

OSSA, Obras Subterráneas

Calle Isla Graciosa 1, 2ª Planta - Puerta 428703 San Sebastián de los Reyes (Madrid)Spain

T. +34 91 782 34 00F. +34 91 562 42 98

www.ossaint.com