Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
OVER AND UPMID-SEMESTER PRESENTATION [DRAFT]
JAMES HOLT
PARAMETERS
ACCESSIBILITY VIA VARIOUS MODES OF
TRANSPORT
CONNECTION TO/RELATIONSHIP WITH
HARBOUR
SOLAR ACCESS AND ADVANTAGEOUS USE
OF SUN
INTRODUCTION OF LANDSCAPING AND
GREEN SPACES
ROUND-THE-CLOCK USE OF PUBLIC SPACE
ACTIVATION OF PEDESTRIAN LEVEL
ZONES
WIND MITIGATION AND CONTROL OF
WIND
SITE SELECTION
BOURKE STREET AXIS
4
2
1
1 2 3 4
3
SITE
SITE EXISTING INFRASTRUCTURE
SITE
CI T
YL I
NK
S O U T H E R N C R O S S
SITE PROPOSED INFRASTRUCTURE
SITE IMMEDIATE ADJACENCIES
BOURKE STREET
UND
ERG
ROUN
D C
ARP
ARKHA
RBO
UR F
RON
TAG
E
PROGRAMMEMIXED-USE HIGH RISE OFFICE BUILDING
Suggested Programme• 60-65 total floors approx.• 8 floors serviced appartments• 5-10% outdoor space• 15,000m² total usable floor space approx.• Inclusion of food and beverage facilities
Revised Programme• ~40 floors (160m approx.)• 6 floors serviced appartments• 10% outdoor space• 15% indoor green space• 30,000m² total usable floor space approx.• Inclusion of food and beverage facilities• Inclusion of retail space at ground level• Inclusion of cinema
WIND DIAGRAMMING
POTENTIAL WIND MITIGATION STRATEGIES
WIND DIAGRAMMING
PRECEDENTS
Green Void, LAVA Architects, Sydney, 2008
MyZeil Shopping Mall, Studio Fuksas, Frankfurt, 2009
MINIMUM SURFACE / RELAXATION
MINIMUM SURFACE BETWEEN TWO CIRCLES, CALCULATED BY MINIMUM SURFACE PLUGINMORE COMPLEX GEOMETRIES TO BE CALCULATED BY RELAXATION USING KARAMBA
WIND PRESSURE TESTING WITH FLOW DESIGN
WIND TESTING FRAMEWORK WITH FLOW DESIGN
Initial Wind Velocity: 10.0m/sMax Wind Velocity: 14.7m/s
Form Wind Velocity Increase Factor: 1.5
INTRODUCTION OF GREEN SPACE
INTRODUCTION OF GREEN SPACE
ILLUMINANCE WITH DIVA
FACADE SYSTEM
STRUCTURAL OPTIMISATION WITH MILLIPEDE
OPTIMISATION
STRUCTURAL OPTIMISATION WITH MILLIPEDE & KARAMBA
EXAMPLE OPTIMISED STRUCTURE FROM MILLIPEDE
PROXIMITY
NEARNESS TO MILLIPEDE MESH DEFINES THICKNESS OFSTRUCTURAL MEMBERS
IN KARAMBA
EXAMPLE MESH OFSTRUCTURAL MEMBERS