36
June 2015 DCM’S SERVICE OVERVIEW

OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

June 2015

DCM’S SERVICE

OVERVIEW

Page 2: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Introduction

DCM (Dawco Construction Management), a privately owned company, was incorporated in

2008 in order to group its family of trade specific companies under one common

management and ownership group.

In 2015, Dawcolectric, who has been operating for over 65 years, unites with Solimec and

DL Instrumentation to create a new company focused on leveraging our high-performing

multidisciplinary teams.

The new structure simply leads to greater agility and flexibility with regards to staffing.

Ultimately, it reinforces our capacity to deliver tailored premium quality solutions at a

competitive price and in a safe and secure work environment.

In summary, our construction management expertise combined with our skilled workforce

make us an exceptional candidate to provide complete industrial and commercial

construction services.

15/06/04 DCM 2

Page 3: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

DCM Group

15/06/04 DCM 3

Page 4: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

DCM Group

15/06/04 DCM 4

Page 5: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

DCM Group

15/06/04 DCM 5

Page 6: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

DCM Group

15/06/04 DCM 6

•Industrial electrical construction

•Electrical equipment installation

•Plant maintenance

•Process piping equipment installation

•Mechanical maintenance

•Shut downs

•Industrial mechanical construction

•Control and instrumentation installation and maintenance

•Pneumatic and electric

•Equipment design and fabrication

•Commissioning and startups

•Industrial piping manufacturing

•Spool fabrication

•Specialization in different welding types

•Joint venture with Al Osais in Saudi Arabia

•Electrical, Mechanical and Piping Construction

•Plant maintenance.

Page 7: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Locations

15/06/04 DCM 7

Edmonton, Ab.

Fort McMurray, Ab.

Montreal, Qc

Trois-Rivières, Qc

Canada

Fredericton, NB.

Middle-East

Bahrain

Page 8: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Our Markets

• Oil and gas

• Power generation

• Mining & metallurgy

• Petrochemicals &

Chemicals

• Pulp & paper

• Infrastructures

• Aeronautics and

manufacturing

• Commercial projects

15/06/04 DCM 8

Page 9: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Management Team

15/06/04 DCM 9

Serge Tousignant

CEO

Neil Macrae

Chief Operating Officer

(COO)

Claude Thibault

Chief Financial Officer

(CFO)

Stephane Tousignant

VP Project Controls

Jean-Noel Miron

VP Technical Services

Eric Dowler

Regional VP Western

Canada

Richard Gadoury

VP HSE

Andre Boisclair

VP Operation

Eastern Canada

Rob Dowler

VP Operation Western

Canada

Al Iacono

Business Development

Manager

Page 10: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Expertise

15/06/04 DCM 10

• Risk Analysis:

- Construction &

Constructability

Study

- Resources

mobilization

and

transportation

logistics

• Cost review

(Global cost)

• Innovation and

technical

Feasibility

• Engineering

• Functional

design

• Bottom-up

design

• Material

selection

• Procurement

• Scheduling

• Cost efficiency

• Scaffolding

strategy

• Process control

• Pipe spool

fabrication

• Module

Assembly

• Portable

Electrical

Buildings

• Services: - Mechanical

- Piping

- E and I

- Insulation and

heat tracing

- Scaffolding

• Seamlessly

Integrated

Work-Face

Planning

Processes

• ISO 9001

Management

Tools

• Segregation of

start-up systems

• Turnover and

commissionning

schedule

• Development of

Turnover

Documentation

Control System

(DCS)

• Technical support

• Coordination with

original equipment

manufacturer

(OEM)

Project

feasibility

study

Engineering

Constructa-

bility

Prefab.

Modulariza-

tion

Construction

Commission-

ing

Start-up

Performance

ramp-up

Optimization

Maintenance

and Life

Cycle

Page 11: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Sample Projects

15/06/04 DCM 11

Client Project Location Scope of work

CNRL-Horizon Oil Sands

Maintenance (all services)

Hydrogen Sulphide Unit (HSU)

Delay Coker Unit (DCU)

Gas Recovery Unit (GRU)

Butane Treating Unit (BTU)

Debottlenecking

Fort McMurray, Ab. Mechanical, Piping, Electrical &

Instrumentation

Suncor Energy Debottlenecking Mackay River, Ab. Mechanical, Piping, Electrical &

Instrumentation

Mosaic Potash Potash Mine Processing Plant Colonsay, Sask. Mechanical & Piping

Thyssen Krupp Syncrude - Mildred Lake Mine

Replacement Mildred Lake, Ab.

Piping and Electric Heat Tracing

(EHT)

Siemens Canada Poste Belanger Montreal, Qc. Electrical

ABB Modular E-house Edmonton, Ab. Electrical & Instrumentation

Bombardier Plant Expansion Mirabel, Qc. Electrical

ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical &

Piping

Saudi Aramco Plant F-13 Cooling Tower Kingdom of Saudi Arabia-

Jubail

Mechanical, Piping, Electrical &

Instrumentation

Viterra Montreal Terminal Dust Collection,

Transport & Storage System Montreal, Qc.

Mechanical, Piping, Electrical &

Instrumentation

Montreal International Fuel

Facilities Corporation North Terminal Expansion Montreal, Qc. Mechanical & Piping

Page 12: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Project Staffing

15/06/04 DCM 16

• Past projects required DCM to ramp up

to 1500 tradesmen

• Access to Building Trades and

Alternate Union (CMAW)

• Temporary Foreign Workers strategy

• Pan-Canadian recruitment capacity

• Fly-in fly-out strategy (50 to 100 travel

weekly across Canada and USA)

• Quick growth recruitment capacity

• 10 full time recruiters in Human

Resource Department

0

50

100

150

200

250

300

Nu

mb

er

of

hir

es

Months

2014 ANNUAL HIRES

Trades; 1578

Admin staff; 172

Page 13: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Health and Safety

15/06/04 DCM 17

• Safety Program: "World class safety standards"

• Hazard assessment

• Code of practice

• Safe work practice

• Project hazard analysis

• JHA and FLHA

• Training and communication

• Orientation, tool box meeting

• Top Down Culture of Safety driven by strong internal communication

including annual Safety Symposium, newsletters, message from president, etc.

• Behavior management

• BBS, FLHA auditing, Competency Verification Program, etc.

Page 14: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Typical Project Team

15/06/04 DCM 20

Page 15: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

JYNT Fabrication

15/06/04 DCM 22

SUMMARY

• Fabrication of industrial and commercial piping

systems of multiple bore sizes since 1993

• Extensive experience in major North American

projects in a multitude of industrial markets

• In 2013, the company joined the DCM Group

WELDING EXPERTISE

• GTAW & SMAW

• Steel Grades:

• Stainless Steel (304, 316 & 321)

• Alloys (Duplex, Hastalloy, Alloy 20, Inconel,

Chrome)

• Carbon Steel

SHOP CAPACITY

• Outdoor courtyard size: 227 601 sq. ft. (1,392 m2)

• Shop Size: 14 938 sq. ft. (1,392 m2)

• Welding stations: up to 12 per shift

• Rail unloading and loading capability

Page 16: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

JYNT Fabrication

TESTING AND QUALITY ASSURANCE

• Non Destructive Examination (NDE):

• Visual inspection,

• Dye-Penetrant

• X-ray via 3rd party (Atlas or Mequaltech Inc.)

• Hydrostatic testing

• Quality control manual in accordance with the

Pressure Vessels Act and Regulations governed by

the Régie du Bâtiment du Québec

• Welding procedures, welders and pipefitters meet

the ASME requirements

SERVICES

• Isometric pipe spool drawings

• Bulk procurement of material

• Handling, cutting and beveling of pipe to

specification

• Precision pipefitting

• Assembling of small and large bore spools, pipe

racks and modules

• Insulation of pipe and vessels

• Stress relieving (via 3rd party)

• Packaging and shipping preparation (Rail or Truck)

• History docket and weld mapping

15/06/04 DCM 23

CERTIFICATIONS

• ASME: Section VIII division I, Section IX

• Fabrication of Steel Structures: CSA W47.1

Division II

• Power Piping: ASME B31.1

• Process Piping: ASME B31.3

• Refrigeration and Heat Transfer: ASME B31.5

• Canadian Welding Bureau: CWB

• Canadian Standards Association: B51

• CPFA: UA Label

• Régie Du Bâtiment du Québec: QQP 315

Page 17: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ 15/06/04 DCM 38

Experience

Page 18: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Suncor Energy

15/06/04 DCM 39

Project description:

Deblottlenecking

Location:

Mackay River, Alberta, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

DCM’s mandate was to execute work on piping and a high pressure steam generator, including steel prefabrication and installation, insulation, and electrical & instrumentation.

Page 19: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

CNRL – Maintenance

15/06/04 DCM 40

Project description:

U2 Upgrader Maintenance

Location:

Fort McMurray, Alberta, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

In recent years, DCM’s maintenance mandate has grown at the Horizon Oil Sands facilities. Our scope has recently been increased to include the electrical & instrumentation, insulation, and scaffolding services. This increases our maintenance team to more than 250 people.

Page 20: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

CNRL – Debottlenecking

15/06/04 DCM 41

Project description:

Deblottlenecking

Location:

Fort McMurray, Alberta, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

DCM’s mandate was to execute pre shut-down and shut-down activities at the Canadian Natural Resources Limited (CNRL) - Horizon Oil Sands facilities.

Page 21: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Smurfit-Stone - Shutdowns

15/06/04 DCM 42

Project description:

Smurfit-Stone – Annual plant

shutdowns

Location:

Portage-du-Fort, Quebec, Canada

Our mandate:

Mechanical & Piping

At the Smurfit-Stone pulp mill in Portage-du-Fort, Quebec, we successfully completed the annual plant shutdowns in the last 15 years. With over 80 tradesmen working on two shifts, shutdowns were completed on time, on budget and without any lost time incidents.

Page 22: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Syncrude

15/06/04 DCM 43

Project description:

Mildred Lake Mine Replacement

Location:

Mildred Lake, Alberta, Canada

Our mandate:

Piping and Electric Heat Tracing (EHT)

ThyssenKrupp Industrial Solutions (Canada) awarded DCM the mandate to perform off-Site fabrication, on-site installation, and electrical heat tracing of piping for two slurry preparation buildings for the Mildred Lake Mine Replacement project at Syncrude.

Page 23: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

CNRL – GRU Supermodule Unit

15/06/04 DCM 44

Project description:

Gas Recovery Unit (Super Module assembly which weighed almost one million kilograms)

Location:

Fort McMurray, Alberta, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

DCM’s mandate was to assemble, move and install the gas recovery unit super module. This work required the involvement of mechanical, piping, electrical and instrumentation teams.

Page 24: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

CNRL – Primary Upgrader

15/06/04 45

Project description:

Primary Upgrader

Location:

Fort McMurray, Alberta, Canada

Our mandate:

Piping, Electrical & Instrumentation

Technip awarded DCM the mandate to perform piping and insulation work including over 400 km of electric heat tracing complete with instrumentation and power distribution.

Page 25: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

CNRL – HSU

15/06/04 46

Project description:

Hydrogen Sulphide Unit

Location:

Fort McMurray, Alberta, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

Tecnicas Reunidas awarded DCM the mandate to install structural steel, mechanical equipment, piping, electrical, instrumentation and insulation components for the erection of the Hydrogen Sulphide Unit at the CNRL Horizon site.

Page 26: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Montreal International Fuel Facilities

Corporation (MIFFC)

15/06/04 47

Project description:

Montreal International Fuel Facilities Corporation – North Terminal Expansion

Location:

Montreal, Quebec, Canada

Our mandate:

Mechanical & Piping

Installation of a new surge tank on the fuel lines at the Montréal-Trudeau International Airport. Offloading, handling and secure storage of all piping, valve materials and equipment. Excavation of existing material, supply, placing and compaction of backfill materials. Installation of all owner supplied pipe, valves and fittings.

Page 27: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

ArcelorMittal Mines Canada

15/06/04 48

Project description:

Sludge Thickener

Location:

Mount Wright, Quebec, Canada

Our mandate:

Civil, Structural, Mechanical & Piping

Complete construction, from the concrete bases to the mechanical installation of equipment, of a 43m dia thickener, a 25m dia water tank, a pump house building and a piperack that connects to the concentrator sector of the Mount Wright Iron Mining Complex.

Page 28: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Canaport LNG

15/06/04 49

Project description:

Gas Liquefaction Process Unit

Location:

Saint-John, New Brunswick, Canada

Our mandate:

Mechanical, Piping, electrical,

instrumentation, and communications

works. DCM’s mandate included:

• Installation of over 28,000 feet of

specialty stainless steel process

piping

• Pre-fabrication of tank piping

• Development and implementation

of cryogenic welding procedures

• Instrumentation calibration /

installation / testing

• Communication cabling installation

/ testing

Page 29: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Irving Shipyard

15/06/04 50

Project description:

Irving Shipyard Modernization

Project

Location:

Halifax, Nova Scotia, Canada

Our mandate:

Electrical

The scope of work included

lighting, distribution, fire alarm

system, ground, security system

and the ducting of the computer

network. 175,000 feet of Teck cable

were installed, as well as 220,000

feet of ducts. Much of the lighting

and wiring distribution was

performed on lifting platforms 150

feet above the ground.

Page 30: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Irving Gas

15/06/04 51

Project description:

King of cats – Gas desulphurisation unit

Location:

St. John, New Brunswick, Canada

Our mandate:

Electrical and instrumentation installation

Engineered by:

Fluor

Page 31: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Shell Canada

15/06/04 52

Project description:

Gasoline and new diesel desulphurization units

Location:

Montreal, Quebec, Canada

Our mandate:

Electrical and instrumentation installation

Page 32: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ DCM

Viterra

15/06/04 53

Project description:

Montreal Terminal Dust Collection,

Transport & Storage Systeml

Location:

Montreal, Quebec, Canada

Our mandate:

Mechanical, Piping, Electrical & Instrumentation

Work included changes to the

support steel for the dust collector,

modification of the existing duct,

changes to the structural brackets,

replacement of the dust collector

fan motor electrical system,

installation of supplied head pulley

belt scrapers and side doors,

installation of larger bolted

explosion vents on the dust bin,

and more.

Page 33: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

│ 15/06/04 DCM 54

Why Choose

DCM?

Page 34: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

• 65 years of experience in industrial and commercial construction – with solid oil and gas background

• Highest health and safety standards that benefit employees, clients, subcontractors and the environment

• Qualified team with quick ramp up capabilities

• Exceptional project execution

• Proven track record

• Meeting and surpassing project and industry quality requirements

Why Choose DCM?

Choose DCM for agility, performance, and human values

15/06/04 DCM 55

Page 35: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Why Choose DCM?

Our mission

"To be an industry leader that develops a family of talented

individuals in a culture of innovation, safety, responsibility, quality,

efficiency and fun."

15/06/04 DCM 56

Page 36: OVERVIEW - dcmgroup.ca · Bombardier Plant Expansion Mirabel, Qc. Electrical ArcelorMittal Sludge Thickener Mount Wright, Qc. Civil, Structural, Mechanical & Piping Saudi Aramco Plant

Thank You

15/06/04 DCM 57

Questions?