1 Principio del formularioWhich of the following are special characteristics of plenum cable?
It burns rapidly but at a low temperature and with no toxic fumes.
It burns slowly and with no toxic fumes.
It does not burn and so produces no toxic fumes.
It burns rapidly but will only ignite at a very high temperature and does not produce toxic fumes.
2 Principio del formularioWhat is an essential tool to have on an upper floor when pulling backbone cable from an upper to a lower floor?
cable winch
Reel brake
Mouse
fish tape
3 Principio del formularioWhich methods are used to locate studs in a sheetrock, or drywall, room? (Choose two.)
using magnets
tapping the surface
nailing specific areas
using blueprints
using a stud finder
4 Principio del formularioWhere is the staging area normally situated?
near the offices needing the wire
near the telecommunications room
on the main floor of the building
on the top floor of the building
5 Principio del formularioWhat are the most common causes of microbends in a fiber-optic cable? (Choose two.)
imperfections in the cladding structure
Fiber-optic connectors twisted during installation
deviations of the axis of the cable from a straight line that will cause light to leak out of the fiber
imperfections on the cable outer jacket surface
mechanical stress on the cable that introduces local discontinuities
6 Principio del formularioWhat is the generally accepted maximum number of ninety degree bends in one run of conduit?
One
Two
Three
Tour
7 Principio del formulario
Which type of equipment is displayed in the photograph?
Bullwheel
quadrant block
Reel jack
Reel Soller
8 Principio del formularioWhat are some alternatives to a fish line when a cable must be pulled behind a drywall? (Choose two.)
use a weight and a string
use a surface mounted raceway
use flexible chains and magnets
Drop the cable down the drywall
install a conduit behind the wall
9 Principio del formularioWhich recommendations should be followed for a successful cutover? (Choose two.)
Randomly test at least 50% of the cables that are installed
keep detailed records of the installation
create accurate punch-lists
schedule the cutover when it is most convenient for the customer
record all the changes in the as-built drawings
10 Principio del formularioThe technician is working on a site where there is a conduit run from the outlet boxes to ceiling. Which procedure should be used to install the cable?
Run the cable from the outlet box through the conduit to the ceiling.
Drop the cable down the conduit until it meets the outlet box.
Drop a fish tape down the conduit so the cable can be pulled up.
Push a fish tape up the conduit so that the cable can be pulled down.
11 Principio del formularioWhen pulling a horizontal cable, which guideline should the cable installer follow?
Run the cable parallel to the walls
place the cable diagonally across the ceiling
Lay the cable directly on top of the ceiling tiles for support
route the cable through the air conditioning duct work for support
12 Principio del formularioDuring a visual inspection of a cable installation, it is noticed that a service loop of fiber optic has been left at a 90 degree turn. Where else would it be expected to see a service loop?
midpoint on a straight run
In the ceiling above an individual outlet
In the wall directly behind an individual outlet
every 18 m (60 ft)
13 Principio del formularioWhat is the difference between a swivel used in pulling cable and one that is used in pulling fiber-optic cable?
There is no difference.
The fiber-optic swivel can handle pulling tension exceeding 5000 pounds.
The fiber-optic swivel is designed to break away with pulling loads greater than 600 pounds.
The fiber-optic swivel can rotate even under heavy loads.
14 Principio del formularioWhen is the term cutting over used? (Choose two.)
when new services are added to an existing cable system
when the equipment of an existing cable system is upgraded
when new equipment is being installed on a newly-installed cable system
when new equipment is installed on an existing cable system
when the services running on an existing network are transferred to a new cable system
when various specialized cabling vendors are included on a newly-installed cable system
15 Principio del formularioA 10 m (33 ft) segment of 10 cm (4 in) conduit with a 90 degree bend is being installed. What is the standard radius that should be used for the bend?
20 cm (7.9 in)
35 cm (13.8 in)
45 cm (17.8 in)
60 cm (23.6 in)
16 Principio del formularioWhen fiber is pulled along a backbone, where will the cable installer leave service loops?
30-degree bends
45-degree bends
50-degree bends
60-degree bends
90-degree bends
17 Principio del formulario
Which fiber-optic component provides strength and protects the glass fibers?
A
B
C
D
E
18 Principio del formularioWhat is the purpose of a removable shaft on a pulley?
To remove a cable after pulling
To allow extra cables to be pulled
To keep any cable from breaking if tension goes beyond the limit
To allow installers to easily add or remove cables as they are pulling them
19 Principio del formularioDuring the rough-in phase of a wiring project, several wires are pulled from the staging area to individual work areas. Which other task should be accomplished during this phase?
The cable should be tested for standards compliance.
The cable should be labeled at both ends.
The cable should be terminated at both ends.
The cable should be terminated at the end that is not in the telecommunications room.
20 Principio del formularioA cable is being pulled and a 60 degree turn should be made. What would be an appropriate device to use?
Pulley
reel Soller
Swivel
Bullwheel