SHRP2 R23 | December 2013
Pavement Renewal Solutions(R23)
1
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Agenda
• SHRP2 Overview–What is SHRP2?–Focus Areas–Implementation Assistance
• Technical Product Description• Product Implementation• Implementation Timeline• Questions
Source: Iowa DOT
2
SHRP2 R23 | December 2013
Imagine the Possibilities
Innovations are available to transportation agencies through a variety of programs, including SHRP2 and EDC2. These innovations:
• May be applied individually or in combination with products from different programs.
• Are easy to learn more about through Websites, Webinars, demonstrations, and peer-to-peer programs.
• Are supported by funding and assistance opportunities that can help your agency quickly and confidently apply innovations to current challenges.
3
SHRP2 R23 | December 2013
State-Based Transportation Innovation Councils
• Provides state-based leadership for the innovation strategies and solutions
• Helps facilitate deployment of innovation initiatives
• Engages all the key stakeholders in a state
4
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
What is SHRP2?(Second Strategic Highway Research Program)
• Products developed from objective, credible research
• Solutions that respond to transportation community challenges – safety, aging infrastructure, congestion
• Tested products, refined in the field
Save lives. Save money. Save time.
SHRP2 Solutions offer new technologies and processes to enhance the efficiency of transportation agencies
5
SHRP2 R23 | December 2013
Why is SHRP2 Important?
SHRP2 Solutions have the power to change the way transportation agencies do business.
Tools for the Road Ahead
By providing new research-based tools and innovative products and processes…
That will create more efficiencies and a smarter use of state and federal investments of taxpayer dollars.
6
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Safety: fostering safer driving through analysis of driver, roadway, and vehicle factors in crashes, near crashes, and ordinary driving
Renewal: rapid maintenance and repair of the deteriorating infrastructure using already-available resources, innovations, and technologies
Capacity: planning and designing a highway system that offers minimum disruption and meets the environmental and economic needs of the community
Reliability: reducing congestion and creating more predictable travel times through better operations
Focus Areas
7
SHRP2 R23 | December 2013
Implementing SHRP2 Solutions
Moving Forward• Approximately 66 high-priority
products introduced over the next several years
• Users run the gamut of the transportation industry
• Selected products integrated into current transportation practices
8
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
SHRP2 Implementation AssistanceProgram
Proof of Concept Pilot• Funds for piloting products to evaluate readiness for implementation• Contractor support to collect data and evaluate the application
Lead Adopter Incentive • Funds for early adopters to offset implementation cost and mitigate risks• Recipients required to provide specific deliverables designed to further
refine the product, and possibly “champion” the product to other states and localities
User Incentive• Funds for implementation support activities after early adopter use• Used to conduct internal assessments, build capacity, implement system
process changes, organize peer exchanges, or offset other implementation costs
9
SHRP2 R23 | December 2013
Round 1 Implementation Assistance
First Round at a Glance• 34 states and the District of Columbia
• 6 SHRP2 Solutions at work on 108 transportation projects
• 2 proof of concept pilots
• 74 lead adopter incentives
• 24 user incentives
• Limited technical assistance to 8 states
10
SHRP2 R23 | December 2013
Round 2 Implementation Assistance
Second Round at a Glance• 18 states
• 4 SHRP2 Solutions at work on 27 transportation projects
• 18 lead adopter incentives
• 9 user incentives
11
SHRP2 R23 | December 2013
Round 3Implementation Assistance
Capacity• Freight Demand Modeling and Data Improvement (C20)
Renewal• GeoTechTools (R02)• Precast Concrete Pavement (R05)• Identifying and Managing Utility Conflicts (R15B)• Pavement Renewal Solutions (R23)
12
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Product Implementation AssistanceOpportunities
Product Proof of Concept Pilot
Lead Adopter Incentive
User Incentive
Freight Demand Modeling and Data Improvement (C20) 9-11
GeoTechTools (R02) 5
Precast Concrete Pavement (R05) 5
Identifying and Managing Utility Conflicts (R15B) 6
Pavement Renewal Solutions (R23) 5 10
13
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Implementation Assistance Selection Criteria
General Criteria for Participants(will vary somewhat among products)
• Geographic diversity of participants
• Demonstrated culture to implement new products or processes
• Demonstrated past interest and/or efforts to implement similar products or processes
• High commitment to making institutional/organizational changes
• Commitment to conduct demonstration workshops
• Willingness to share experience by facilitating peer-to-peer activities
• Commitment to dedicate staff to the implementation project
14
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Pavement Renewal Solutions (R23)
AASHTO Committees & Implementation Resources• Subcommittee on Materials• Subcommittee on Design• Joint Technical Committee
on Pavements• TIG – AASHTO Technology
Implementation Group
15
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Pavement Renewal Solutions (R23)
ChallengeRapid renewal of existing pavement and provide long life pavement structures to minimize effect on users and maximize cost effectiveness.Solution Develop Guidelines for pavement renewal using in place pavements including design and construction features and specifications needed for long life performance.
16
SHRP2 R23 | December 2013
Pav
emen
t C
ondi
tion
Terminal Serviceability
Pavement LifeT0 T1
75% of Life
12%
40% Drop in Quality
40% Drop in Quality
$1.00 to Preserve Here
Pavement Deterioration Curve
R23
R26
20 years 30-50 years17
SHRP2 R23 | December 2013
R23 Project Participants
James Bryant SHRP 2Newton Jackson NCEJason puccineeii NCEJoe Mahoney – UWSteve Muench – UWGeorge White – PaviaKarim Chatti - MSU
Neeraj Buch - MSUDan Zollinger - Texas A&MTom Scullion - Texas A&M Julie Vandenbossche - UPMark Snyder Rita LeahyKatie Hall
18
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Contributing Agencies
Organization Contact
Steven Gullien
Michael Eacker
Steven Gull
Shongtao Dai
Magdy Mikhail
Trenton Clark, Alex Teklu
Jeff Uhlmeyer19
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Contributing Industry
Organization Contact
Larry Scofield (IGGA)
Dave Newcomb (TTI)
20
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Methodology
Phase 1• Conducted extensive literature review• Queried many states for information on what they did and
how long it lasted.• Analyzed the LTPP Database for treatment approaches and
performance.• Where the LTPP data did not have sufficient performance
history, ran numerous PerRoad and MEPDG design analyses to estimate service life for a range of LTPP sites.
21
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Methodology
Phase 2• Visited seven agencies to review what they did, how it
performed (site visits) and worked with them to help develop the guidelines and provide feedback on the Guidelines.
• Developed test cases and conducted a number of workshops to review and refine the guidelines.
22
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Long Life Approaches
• Unbonded PCC overlays of flexible pavement• Unbonded PCC overlays of rigid pavements• Bonded CRCP overlays of CRCP• HMA overlays of rigid pavements
– With rubbilization of PCC pavement– With crack and seating of JPCP– With saw crack and seating of JRCP
• HMA overlays of flexible pavement– Provided all stripping, fatigue cracking,
thermal cracking is addressed
23
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Addition of options from R05 & R21
24
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Decision Matrix:Multiple Selection TablesSelection tables a function of existing pavement type, distresstypes and levels, and subgrade support renewal options.
25
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Decision Matrix:Design TablesDesign tables were developed to provide an estimate of pavement thickness required for long life pavements.
26
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Interactive Program rePave
An application was developed to simplify the selection process and provide a platform for the background information needed to design and build long life pavements
27
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Pavement Renewal Solutions
Product Benefits
rePave Scoping Tool Will encourage longer lasting designs. Realistic scoping assessments and easy to use. Guides user through data gathering process.
Project Assessment Manual (including Life Cycle Assessment, Traffic)
Combines traditional rehabilitation data needs with up-to-date tools such as CA4PRS (construction productivity and work zones).
Best Practices: Flexible and Rigid
Document practices that are critical for designing and constructing long lasting pavements.
Combine key practices with specifications.
Guide Specifications Specification elements can be incorporated in preexisting agency standard specifications.
LCCA, Emerging Technologies
Encourage use of LCCA. Create awareness of emerging pavement
technologies.28
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Assessment Scoping Design PS&E
rePave Scoping Tool
Interactive decision matrix for identifying
and selecting pavement renewal strategies
access to resources
Project Assessment Manual
Guidelines for data collection, testing, etc.
required for assessment and scoping
Best Practices: Flexible and Rigid
Guide Specifications
LCCA, Emerging Technologies
R23 Products:How it works
Use Standard State Design
Process (ie: AASHTO
Pavement ME, PerRoad, etc.)
29
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
rePave Scoping Tool(Interactive Program)A web-based, user-friendly means of walking through the decision making process (selection and design tables)
A user-friendly means of navigating a large amount of information (required to produce long-life pavements)
30
SHRP2 R23 | December 2013
Step 1: Project Information
31
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 2: Existing Section
32
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 3: Future Section
33
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 4: Existing Distress
34
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 4a: Confirmation
35
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 5: Renewal Options
36
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Step 6: Summary
37
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Coming Enhancements:Single Sign On
38
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Coming enhancements:Organize and Share
39
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Coming enhancements:Comparison feature
40
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Resources to Enhance Use of Design Guidelines
Project Assessment
Manual
Guide Specifications
Best Practices
Rigid
Best Practices Flexible
41
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Project Assessment Manual: Topics• Pavement Distress Surveys• Rut Depth and Roughness• NDT via FWD• Ground Penetrating Radar• Pavement Cores• Dynamic Cone Penetrometer• Subgrade Sampling and Tests• Traffic Loads for Design• Construction Productivity
and Traffic Impacts• Life Cycle Assessment• Material Properties
42
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Construction Productivity and Traffic Impacts• Construction Productivity• Largely built around CA4PRS (Construction Analysis for
Pavement Rehabilitation Strategies)• Typical CA4PRS input data summarized for
– Crack and seat followed by HMA overlay– PCC overlay
43
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Construction Productivity and Traffic Impacts
0
2
4
6
8
10
12
14
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
Thic
knes
s of
Pav
emen
t Con
stru
cted
(in
ches
)
Lanes-MIles Constructed in One Closure
10-hour Night Closure (not feasible)
55-hour Weekend Closure
168-hour 24/7 Continuous Week-Long Closure
PCC Overlay Scenario44
SHRP2 R23 | December 2013
Best Practices
45
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Flexible Best Practices:Strategies • Introduction• HMA Renewal Strategies
– HMA over HMA renewal methods• HMA over existing HMA pavement• HMA over reclaimed HMA (recycling)
– HMA over PCC renewal methods• HMA over existing HMA-surfaced composite
pavements• HMA over crack and seated JPC pavements• HMA over saw, crack-and-seat JRC pavements• HMA over rubblized JPC pavements• HMA over existing CRC pavements
46
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
HMA Overlays over Existing HMA Pavements• Criteria for Long Life Potential
– The surface condition is good and the structural capacity of the existing AC pavement is adequate for a potential long-life pavement.
– There is no evidence of stripping in any of the existing HMA layers (determined through coring and/or GPR testing).
– Proper repair and surface preparation is provided for the existing surface layer, and a good tack/bond coat is provided.
– The existing drainage system is in good working condition, or adequate drainage is provided.
47
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Summary Tables
48
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
HMA Construction:Quality Control• Density: Dense-graded mixes ≥ 93% of TMD• Segregation: Temperature variation is featured
Example of segregated pavement Thermal image during paving
49
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Rigid Best Practices:Strategies• Introduction• Rigid Renewal Strategies
– Unbonded Concrete Overlays of Concrete Pavements– Unbonded Concrete Overlays of HMA Pavements– Bonded Concrete Overlays of Concrete Pavements
50
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Rigid Best Practices:Details • Unbonded Concrete Overlays of Concrete Pavements
– Criteria for Long Life Potential– Materials Considerations
• Cementitious Materials• Aggregate• Chemical Admixtures
– Separator Layers– Other Materials– Design Considerations– Structural Design and Joint Design Considerations
51
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Rigid Best Practices:Details• Unbonded Concrete Overlays of Concrete Pavements
– Drainage Design– Performance Considerations– Construction Considerations– Example Designs– Summary– Unbonded Concrete Overlays of Concrete Pavements and
Specifications
52
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Summary: UBO of Concrete Pavements and Specifications
• Best Practice• Why this Practice?• Typical Specification
Requirements
53
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Guide Specifications
• Introduction• Specifications not contained in the AASHTO Guide
Specifications• Elements for AASHTO Guide Specifications• AASHTO and State DOT Specification Summaries
54
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Recommended R23 Specification Elements AASHTO Section 404 Tack Coat
Source refers to AASHTO and State
Specifications
55
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
R23 Early Use Case: WSDOT• WSDOT used R23 products on a time sensitive project on
Interstate 5 to help identify the best long-term renewal approach for the agency.
– Performed Pavement Assessment– Formal designs and thicknesses were comparable to that of the R23
Pavement Guidelines so felt confident– Used R-23 Guide Specs to help shape specs for project– Final design resulted in crack, seat, overlay over existing PCC.
56
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
State of the Practice Value:WSDOT• WSDOT used R23 products on a time sensitive project on
Interstate 5 to help identify the best long-term renewal approach for the agency.
“It helped us identify our renewal options, understand how to specify them, and define best practices for implementation, without stumbling through several weeks of analysis”
Jeff Uhlmeyer State Pavement Engineer
57
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Access all the products at:
www.pavementrenewal.org
58
SHRP2 R23 | December 2013
Implementation Strategies
5 Step Implementation Program
1) Outreach and Communications2) Agency Evaluations 3) Agency Plan Development 4) Agency Targeted Usage5) Agency Routine Usage
59
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
Assistance Opportunities
Third Round -January 2014
Proof of Concept Pilot
Lead Adopter Incentive
User Incentive
R23 – Pavement Renewal Solutions 0 5 10
60
SHRP2 R23 | December 2013
R23 Implementation Assistance
• Lead Adopters (up to 5 states)
• Building interest and champions to spearhead the institutionalization of long life pavement designs.
• Development of additional case studies to demonstrate economic and environmental benefits of the R23 Products.
• Revising State specifications to incorporate long life pavement designs as a routine practice.
• Hosting Peer Exchanges and making presentations to assist other agencies with implementation.
61
SHRP2 R23 | December 2013
R23 Implementation Assistance
• User Incentives (up to 10 States)
• Technical Assistance to review current specifications, policies, and pavement design processes used by the DOT with the goal of implementing long-life pavement designs that incorporate existing pavements into the design of targeted projects.
• Please visit www.pavementrenewal.org to learn more about the products!
62
SHRP2 R23 | December 2013
Application Tips
Do Don’tMake your application clear and concise
Forget to provide a response in each of the fields
Describe any previous DOT efforts related to using existing pavements in-place and long-life designs.
Assume the SHRP2 program is familiar with details about your agency,the narrative should be complete
Describe how the DOT anticipatesimplementing product including necessary resource requirements.
Forget that implementation assistance is to advance the use of Pavement Renewal Solutions.
Describe the outcomes and deliverables you expect to achieve
Apply if you do not represent a state DOT or other Federal-aid recipient.
Expect to share the results of your product implementation
Be late; applications are due by February 14, 2014
63
SHRP2 R23 | December 2013
Round 3 Implementation Assistance Schedule
• Product Webinars held in December
• Implementation Assistance Timeline– Application period opens January 17 , 2014– Application period closes February 14, 2014– Awards announced March 28, 2014
• More information at www.fhwa.dot.gov/goshrp2
R05: Precast Concrete Pavement December 12 2 - 3:30 p.m.
R15B: Identifying and Managing Utility Conflicts December 13 2 - 3:30 p.m.
R02: GeoTechTools December 16 12 - 1:30 p.m.
C20: Freight Demand Modeling and Data Improvement December 16 2:30 - 4:00 p.m.
R23: Pavement Renewal Solutions December 17 2 - 3:30 p.m.
64
SHRP2 R23 | December 2013
• State Visits
• SHRP2 Tuesdays– R05: Precast Concrete Pavement (Sep 24, 2013)
– R15B: Identifying and Managing Utility Conflicts (July 30, 2013)
– R23: Pavement Renewal Solutions (February 4, 2014)
– C20: Freight Demand Modeling and Data Improvement (January 21, 2014)
– News on future webinars can be found at trb.org/SHRP2
Additional Resources
65
SHRP2 R23 | December 2013SHRP2 R23 | December 2013
GoSHRP2 on the Web
• GoSHRP2 www.fhwa.dot.gov/goSHRP2
– Comprehensive information about SHRP2’s implementation phase
• SHRP2 @TRB www.TRB.org/SHRP2
– Information about research phase
• SHRP2 @AASHTO http://SHRP2.transportation.org
– Implementation information for AASHTO members
Rich source fordetails of
implementation assistance along with
focus area and product
information
66
SHRP2 R23 | December 2013
2014: Full Steam Ahead
• Round 3 opens in January • Support begins for Round 3 recipients• Anticipated Round 4 products projected for June
– R01A – Technologies to Store, Retrieve, and Use 3D Utility Location Data– R06A – Nondestructive Testing Technologies for Concrete Bridge Decks– R06G – Mapping Defects in or Behind Tunnel Linings– R06C – Rapid Technologies to Enhance Quality Control on Asphalt Pavements– R09 – Managing Risk in Rapid Renewal Projects– R10 – Innovative Strategies for Managing Complex Projects– R19A – Designing and Preserving Bridges to Achieve a 100-Year Service Life– R21 – Composite Pavement Systems– C03 & C11 – T-PICS / Economic Analysis Tools– C10 – Integrated Travel Demand Modeling– L02/05/07/08/37/38 – Reliability Data and Analysis Tools (Bundle)
• Continued technical and financial assistance for rounds 1 and 2 throughout the year
67
SHRP2 R23 | December 2013
Questions?
R23: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=2174
Implementation Assistance: www.fhwa.dot.gov/goSHRP2
Email: [email protected]
For more information:
Steve Mueller FHWA [email protected] Smith AASHTO [email protected]
68